Sabrina M. Ellsworth
**** ** *** *** *** *** Camas, Washington 98607 ***************@*****.*** 360-***-****
PROFILE A motivated and versatile individual with a strong desire to succeed.
●13 years in the construction industry
●Demonstrated track record of increased responsibilities and continuous self-improvement.
●Exemplary leadership skills
●Detail oriented
●Excellent written and oral communication
EMPLOYMENT
September 2021- Current- Civil Laborer Foreman Portland Wastewater Treatment Facility. Kiewit Construction
Serves as site CECSL lead conducting daily stormwater pollution prevention plan (SWPPP) inspections after weather event inspections as needed. Responsible for various aspects of environmental compliance including stormwater, inspection of best management practices (BMPS) and collection of test water samples in accordance with NPDES discharge permits. Fabricate and maintain all dewatering methods in place throughout the site. Ensure all baker tanks are functioning properly. Replacing, repairing, and redirecting all systems as needed. Work directly with the Owners Representative to mitigate any adjustments or installation of nonfunctional (BMPS) Logging and submitting all required reports after weekly site evaluations. Responsible for managing a multitude of different scopes of projects and assigning craft members accordingly. Review that all safety practices are in place and there is a clear understanding of the task required.
March 2019 -August-2021 Logistics and Distribution Foreman. Sukut Construction
Supervised all (BMPS) installation on the entire site (1,223-acre project) was not only in compliance but continued to remain effective throughout the length of the project Inspected all steel and Solar ATI that was delivered to site. Forecasted labor hours needed for Distribution through site based on Projected truck deliveries. Instructing all my crew members of daily tasks and ensuring they had proper training and tools needed. Scheduling all waste collection and various other vendors. Daily inventory of each solar block to keep a detailed list of materials that were out in the field.
April 2017- March 2019 Laborer Lead JH KELLY
Worked directly with the tool room attendant to distribute tools and various supplies to 6 different crafts and 240 workers. Keep detailed records of all tools out on site to manage inventory budget. Responsible for installing and maintaining all safety devices on site were in compliance. Worked all facets of a concrete pours. Responsible for entire sites recycling and contractor’s trash. Various laborer jobs throughout the length of the project
Notable Projects.
Ilani Casino Resort- 510-million-dollar casino.
Portland Wastewater Treatment Center
OHSU Knight Cancer Institute- 349-million-dollar 3 block project.
Avangrids Montague Solar Project 1,223 acres providing clean power to 40,000 homes.
Training
Lead CECSL Certification
Stormwater One Certifications- Common stormwater violations and tips to avoid, How to choose the correct BMPS for your construction site, Nonstructural BMPS, Prepping stormwater controls for winter weather, Online training and credentials.
Flagger Certification
Professional References
Bobbie Ellis WSDOT Vancouver WA 360-***-****
Janette Chumley ACMS Northwest LLC 360-***-****
Derek Ranson Kiewit Construction 650-***-****
Sheila Birkenfeld Vigor Industrial 971-***-****