Post Job Free
Sign in

High School Industrial Engineer

Location:
Veracruz, 91910, Mexico
Salary:
70000
Posted:
May 28, 2024

Contact this candidate

Resume:

Victoria no. ** centro.

Xalapa Veracruz,

casa 01-228-*-**-**-**

*****.****@*******.***

Cel. 228-***-****

Saúl Marín Olvera

PERSONAL INFORMATION

Nationality: Jalapa Veracruz: Mexican

Age: 53. Married

Birthplace: Jalapa Veracruz.

Address: Victoria 70 B. central zone cp. 91000

Release card. B6223106

Passport released: 070********

Industrial Engineer: Mechanical-Electrical CED

Curp.: MAOS680115HVZRLL02

SOCIAL SECURITY 658********

NUCLEAR POWER RP FV353

OBJECTIVE

Daily Improvement and Continuous Improvement as a condition of employment and thus achieve Quality in the product or service safely.

SCHOLARSH; Abraham Castellanos” 1981 Xalapa Ver

High School "Antonio María De Rivera" 1984 Jalapa Ver

High School "Third Constitutional Article" 1986 Jalapa Ver

Professional “University Zone.” Jalapa 1991 Jalapa Ver.

Veracruzana University U.V. Mechanical Industrial Engineer–eléctrico.

DC005 STPS INDEPENDENT INSTRUCTOR IN THE MEXICAN REPUBLIC REGISTERED IN MONTERREY NUEVO LEON AND VERACRUZ 2000-2022

COLLABORATOR FOR EMERGENCY PLANS IN CIVIL PROTECTION FOR THE STATE OF VERACRUZ MEXICO 2000-2022

WORK EXPERIENCE SUMMARY

:

Coordinate and train personnel for work at heights, confined spaces, lifting equipment, maneuvers, electricity, AC, DC. in Hornos assembly, and welding SMAW, TIG, MIG. LEL and UEL monitoring, and FIRE PROTECTION

Conduct layouts, Japan-USA. SPECIFIC HIGH-RISK WORK

Generate as DC5 the DC3 STPS in Labor Skills

.

Enable permit-lodge and check List, ASSEMBLY AND STRUCTURAL MANEUVERS

Monitors UEL, LEL, FLASH POINT C, % TGWH CRETIB, SETIQ

FIREWASH PROTECTION FIRE

APPLY OSHAS: ISO 14000 AND 18001.

Industries to mention; Ternium Monterrey, Tamsa Veracruz, General Motors Saltillo Coahuila, Audi Puebla, KELLER España in Cancun drilling and pile building, KEPLER AND GEOPERFORA Micro drilling Ensenada California today. 2022

COORDINATE THE SAFE MANEUVERS OF 4 TANKS OF 250000 LTS OF LP GAS MANEUVER - TRANSFER AND SAFE ASSEMBLY TO FEED PROCESS BOILERS.

Manage lodge permission

Train the personnel involved DC3

Enable and mount antistatic system: PHYSICAL GROUND.

Cadwell and SMAW Welding Inspection

QC; ASSEMBLY OF LP GAS SAFETY VALVES

APPLICATION OF REGULATION 001-SEDG ENERGY STORAGE PLANTS FOR L.P. GAS. DESIGN AND CONSTRUCTION

Training, signaling and training of brigades in the fire system.

Train in monitoring of LEL and UEL explosive mixtures.

Enable fire sprinkler system

Carry out procedures and their instruction

MANAGEMENT OF CRYOGENIC, REACTIVE, EXPLOSIVE AND INERT GASES FOR THE INSTRUMENTATION AND MAINTENANCE OF TURBINE, REACTOR; CRETIB, SETIQ

REENGINEERING TRAINING PREVENTION OF UNSAFE ACTS AND CONDITIONS IN POE EXPOSED RADIOLOGICAL AREA.

RESPIRATORY PROTECTION LINES RLA, RCA, GRILDEL, PROTECTION FACT

INDUSTRIAL SECURITY COORDINATOR IN MAINTENANCE IN STORAGE AND DELIVERY TERMINALS AFTER GRUPO ALTAVISTA MEXICO,

Technician specialized in INDUSTRIAL SAFETY AT LAGUNA VERDE NUCLEOELECTRIC POWER 2000- 2017 PLANT IN MAINTENANCE OF URANIUM RECHARGE, MAINTENANCE OF TURBINES REHEATERS, GENERADORES ELECTRICS.

KELLER ASSEMBLED, DRILLING AND ESTABLISHED IN CANCUN QUINTANAROO ENERO 2020 2021.

KEPLER-GEOPERFORACION DEL GOLFO DRILLING AND CONSTRUCTION OF MICROPILES JUN-19-2022.

GEOPERFORA DEL GOLFO SEPTIEMBRE – NOVIEMBRE PROYECTO ECA- LNG 2022

Contribuir con la Seguridad Industrial del proyecto ECA LNG EN SECTOR BOG COMPRESOR EN ZONA A 2022



Contact this candidate