Post Job Free

Resume

Sign in

Mechanical Engineer Industrial Services

Location:
Al Jubayl, Eastern, Saudi Arabia
Posted:
April 14, 2024

Contact this candidate

Resume:

AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD.

STANDARD RÉSUMÉ FORMAT (For Key Staff)

Name

:

ROLANDO M. BARROS

Employee No.:

FJ10745

Position

:

SR. MECHANICAL ENGINEER

Nationality

:

FILIPINO

Date of Birth

:

13th September 1967

Marital Status

:

Married

Languages

:

English & Tagalog

Address

:

145 R. Fernandez Street, San Juan City, 1500 NCR

Educational Qualifications:

Degree / Diploma

School / Country

Period (From – To)

Bachelor of Science in Mechanical Engineering

Pamantasan ng Lungsod ng Maynila

1984-1990

Training & Seminars Attended

MS Project 2010, Madagascar

CMMS/EAM, Madagascar

PTW System, Madagascar

Ambatovy Plant Induction Training (H2S, H2, Air Separation Units, Ammonia, LPG & Naphtha Storage & Facilities, Lime & Limestone Plant), Madagascar

Challenge of Leadership

Communication Enhancement

Inter-Personal Communication Skills Training

Roller Bearing – Theory and Practice

Seminar on Psychrometric and Air Conditioning

Seminar on Iwaki Chemical Pump

Problem Solving – Manufacturing Approach

Basic Lubrication and Compressed Air System

TPM / Cyanide Handling and Safety

Occupational Health and Safety Training

Seminar on Fluid System

Computer Skill:

Working Knowledge of MS Office

MS Project 2010

CMMS

EAM

Oracle

SAP

Skills:

Supervision & Maintained Quality.

Ensure Specs Accuracy as per Isometric Drawing.

Good Decision Making.

Plant Engineering & Management

Cordial Coordination with the Client, Consultant & Contractors.

Experienced in Plant Commissioning.

Material Requisition/Work Order

Planning and Troubleshooting

Preventive/Predictive Maintenance

Maintenance and Repair Management

Pumps/Conveyors/Blowers/Chillers/Gearbox

Mining and Mineral Process/Beneficiation

Alignment (Optical Alignment/Conventional)

Adaptability and Flexibility/Poised under pressure.

Summary of Professional Experience:

Summary of Work Experience (From present to previous)

Name of Company /

Country

:

M.S.AL-SUWAIDI INDUSTRIAL SERVICES COMPANY PVT. LTD. KSA.

Project

:

Maaden WSPC, Turaif, Northern Border, KSA

Position Held

:

SENIOR MECHANICAL ENGINEER

Period (From – To)

:

January 2022 – December 2023

Key Job Responsibilities

:

Inspected and tested damaged machine parts and marked defective areas and advised supervisors of repair needs.

Inspected periodically all equipment’s of Beneficiation Plant (Upstream/Wet) to include flotation, Sizing Area, Rod Mills, Tailing Horizontal Belt Filter and Concentrate Horizontal Belt Filter, Blowers, pumps, Thickener, progressive cavity pumps and Vacuum Blowers to determine problems and necessary maintenance.

Prepared weekly maintenance schedules and work allocation.

Participated in the weekly schedule coordination meeting and presented the weekly schedule of workable maintenance in the backlog. Ensured that a clear understanding exists of which job will be worked in the upcoming week and finalized the weekly schedule for operations approval.

Reviewed safety practices of mechanical personnel and ensured that all are following company safety guidelines.

Prepared equipment specific documentation such as special assemble instructions, past modification, data sheets, calibration requirements, manufacturer design information and purchase necessary parts, equipment, services, and documentation necessary to perform maintenance work.

SIS Join Date

:

28th MARCH 2018

Name of Company /

Country

:

M.S.AL-SUWAIDI INDUSTRIAL SERVICES COMPANY PVT. LTD. KSA.

Project

:

Maaden Phosphate Company, Ras Al Khair, KSA

Position Held

:

MECHANICAL SUPERVISOR

Period (From – To)

:

APRIL 2019 – DECEMBER 2021

Key Job Responsibilities

:

Prepared estimates of work hours, materials, and resources required for maintenance projects.

Identified equipment failure root causes and initiated corrective actions.

Monitored the performance of maintenance staff and personnel to ensure compliance with company standards.

Involved and helped improve the MTBF/MTTR department goals and benchmark.

Monitored inventory and ordered new supplies to meet demands for repairs.

Created WR and closed completed WO in the Oracle system to reduced backlog of the system generated PMs to maintain KPI within the benchmark.

Inspected, tested, measured completed work, using devices such as hand tools, precision measuring tools and gauge to verify conformance to standards and repair requirements.

Created detailed documentation of all maintenance activities.

Suggested changes in working conditions and use of equipment to increase efficiency of department.

Name of Company /

Country

:

M.S.AL-SUWAIDI INDUSTRIAL SERVICES COMPANY PVT. LTD. KSA.

Project

:

Petrorabigh Refining Company

Position Held

:

ROTATING EQUIPMENT SUPERVISOR (POLYMER PHASE 2)

Period (From – To)

:

MARCH 2018 – MARCH 2019

Key Job Responsibilities

:

Provided technical support to rotating equipment engineering and maintenance matters for Polymer Areas (EPR, TPO, LDPE, PMMA & Nylon).

Served as the primary rotating equipment engineering resource for an assigned area PMMA, TPO, EPR, LDPE, NYLON 6.

Provided daily/weekly/monthly reports and update of maintenance activities.

Ensured all deliverables related to rotating equipment are in accordance with the project needs, prescribed specifications and good engineering practice are completed within schedule.

Field support and commissioning assistance.

Aligned machines and equipment using hoist, jacks, dial gauge, alignment kit and optical alignment equipment.

Replaced defective parts of machine, adjusted clearance, and alignment of moving parts.

Provided technical assistance/troubleshooting assistance in resolving rotating equipment design, operation, and maintenance problems; contacted vendor/supplier representative as required.

Scheduled and supervised the work of rotating equipment technicians and millwright.

Prepared technical tabulation and evaluation for any type of rotating equipment submitted by Vendors.

Analyzed rotating machinery equipment history data in terms of failure analysis and spare parts consumptions and inject the experience to selection of equipment during project execution.

Name of Company /

Country

:

SAUDI DOLOMITE CO., LTD., AINDAR, KSA

Project

:

MINING

Position Held

:

MECHANICAL ENGINEER

Period (From – To)

:

JUNE 2015 – JUNE 2017

Key Job Responsibilities

:

Planning, scheduling, execution, preservation, and commissioning of rotating and static equipments. MRP, ERP. Co-ordination with client for project activities, status and progress.

Originated and developed analysis to rapidly repair equipment by studying Operating Equipment Manual (OEM) repair, maintenance, and procedures.

Performed regular maintenance checks to identify and address potential issues of Plant Assets such as Hydration Plant, Vertical Shaft Kiln, Crushers /Sizing Screens, Blowers, Conveyors, Dust Collector, Gearbox (Variable and Servo Drives). This includes engineering, planning/scheduling, documentation, and reporting.

Reviewed all equipment spare parts requirement. Procured according to criticality and budget.

Identified tools and methodologies for preventive and predictive maintenance downtime.

Acquired failure data to prepare maintenance plans for restoring equipment to operating condition.

Implemented continuous improvements to reduce downtime and increase productivity.

Investigated equipment failures and difficulties to diagnosed faulty operation and recommend remedial actions.

Established and coordinated maintenance and safety procedures, service schedule and supply of materials required to maintain machines and equipment in prescribed condition.

Conferred with engineers or other personnel to implement operating procedures, resolve system malfunctions, or provide technical information.

Name of Company /

Country

:

EEI CORPORATION

Project

:

Combine Cycle Power Plant, Sta Rita, Batangas, Philippines

Position Held

:

MECHANICAL ENGINEER

Period (From – To)

:

JUNE 2014 – JUNE 2015

Key Job Responsibilities

:

Supervised erection works of Rotating/ Static Equipment, do method statement in installation/erection procedure of mechanical equipment.

Equipment installation: withdrawal of equipment and accessories marked the center lines on equipment and cleaning; erection and levelling/centerline; initial alignment; preparation for “pocket grouting”; Request for RFI for initial coupling alignment prior to grouting.

Planning, material handling, indoor/outdoor safekeeping of mechanical equipment.

Prepared foundation for equipment installation / Erection.

Reviewed and processed MEPF shop drawings and other submittals.

Oversaw installation, operations, maintenance, and repair ensured that machines and equipment are installed and functioning according to specification.

Directed installation, operation, maintenance, or repair of rotating /static equipment such as pumps, blowers, condenser, heat exchangers, steam/gas turbine and other auxiliary equipment of combine cycle power plant.

Maintained quality control program requirements and special process/test techniques required. Technical coordination with Sub-Contractor, Vendor, Client Owner (Siemens).

Name of Company /

Country

:

AMBATOVY Ni-Co PROJECT, MADAGASCAR, SA

Project

:

Mining & Mineral Processing

Position Held

:

MAINTENANCE COORDINATOR/PLANNER

Period (From – To)

:

APRIL 2011 – MAY 2014

Key Job Responsibilities

:

Involved and participated in POVT and commissioning of Ancillary Plants in Utilities Area (H2S, H2, Lime & Limestone & Naphtha storage & facilities) and Ammonia Plant, HAZOP and QRA analysis before shutdown and maintenance.

Assigned as commissioning coordinator for Lime & Limestone Plant, H2S Plant, Stockpile (Sulphur/Coal/Limestone) and Ammonia Plant. To monitor and follow-up to construction and vendor punch list items.

Effectively handled the planning and coordination function between all disciplines for the Ancillary Plants. The equipment related to these areas are H2S, Lime & Limestone Plant, Ammonia, LPG/Naphtha, H2 & Air Separation Plant, Steam Network, Stockpile (Sulphur, Coal Limestone).

Effectively handled the planning and coordination function between all disciplines for the HPAL (High Pressure Acid Leach) Plant. The equipment related to these areas are Autoclaves, Thickeners, HP Geho pumps, Centrifugal Pumps, Pressure Vessels, Agitators, HP/LP Direct Heaters, Venturi Scrubber, H2 Compressors, Ball Mills, Conveyors, Cyclones, Fans & Blowers.

Coordinated operation and maintenance activities to maximize work force productivity to avoid potential delays and obstacles to efficient work execution of commissioning activities.

Directed and supported installation teams during POVT and commissioning.

Scheduled and updated all planned pre-commissioning and commissioning operations and maintenance activities both daily and one (1) week look ahead schedule.

Managed work priority; developed job plans; defined parts; materials & skills; engaged the proper resources to develop a safe and efficient work control plan.

Participated in the Weekly/Schedule coordination meeting and presents the weekly schedule of workable maintenance jobs from the backlog. Ensured that a clear understanding exists of which job will be worked in the upcoming week. Finalized the weekly schedule for Operations approval.

Name of Company /

Country

:

JX NIPPON MINING & METALS, PHILIPPINES

Project

:

Copper Foil (EDCF/TRCF) Processing and Manufacturing

Position Held

:

MAINTENANCE SUPERVISOR (ENGINEERING DEPARTMENT)

Period (From – To)

:

JANUARY 1998 – APRIL 2011

Key Job Responsibilities

:

Developed and implemented mechanical maintenance plans to prevent costly equipment breakdowns.

Developed preventive maintenance procedures for mechanical systems.

Assigned duties and responsibilities to project personnel.

Planned, scheduled, and coordinated project activities to meet deadlines.

Conducted failure analysis, documented results, and recommended corrective actions.

Condition Monitoring and maintained parameters of all facilities equipment (Chillers, AHU, Compressors, Scrubber & Blowers; Cyclo-Blowers and Pumps): Hitachi DSP 75 & SDS 200 Screw Compressor (10m3/min &33m3/min), Cooper Turbo 2000 Compressor (150 HP),680 CFM, Atlas Copco ZE-75 (75 kw,23m3/min), Chillers (210 TOR), Liang-Chi Cooling Towers (400 TOR)

Performed routine/shutdown maintenance of EDCF (Electro-Deposited Copper Foil) and TRCF (Treated Roll Copper Foil) equipment.

Disassemble/Assemble, repair and installation of pumps (STX/MTX Gould pump, Gould Magnetic pump, multi-stage, Iwaki Chemical Pump, Pit pump) and alignment.

Prepared PM and lubrication schedule for pumps, gearbox, Chrome plater and Drum Polisher/TL and Slitter Machines.

Prepared and administered preventive maintenance work orders, 5’S and TPM.

Employed wide variety of hand and power tools including Drills/Grinders, Torque Wrench, precision measuring instruments, other measuring tools such as Infrared Thermometer, Tachometer, Surface Roughness Tester, and Durometer.

Name of Company /

Country

:

SALEM OCEANIC CORPORATION, PHILIPPINES

Project

:

MANUFACTURING

Position Held

:

PROCESS ENGINEER (MECHANICAL)

Period (From – To)

:

JANUARY 1997 – JANUARY 1998

Key Job Responsibilities

:

Conducted project study; machine performance evaluation; modification and process improvements/changes to maximize the product yield.

Introduced new adhesive equipment that contributed to product strength, reduced assembly time and man-hours.

Prepared estimates/lay-out of projects requested by concerned department under Planned Work Order (PWO).

Evaluated the results/findings on the cause of deviation from the standard work procedure and work instruction.

Determined the best process for each job so that specific requirements are set forth for which equipment, tools and jigs can be selected and designed.

Coordinated and implemented quality control objectives, activities, or procedures to resolve production problems, maximize product reliability or minimize costs.

Planned and established sequence of operations to fabricate and assemble parts or products and to promote efficient utilization.

Recommended methods for improving utilization of personnel, materials, and utilities.

Created and issued Work Orders to Maintenance Department using SAP EAM software.

Organized work materials, write work instructions, specify safety needs, and optimize the use of maintenance labor to maximize the performance and minimize the downtime of all equipment.

Prepared equipment specific documentation such as special assemble instructions, past modifications, data sheets, calibration requirements, manufacturer’s design info. Purchase necessary parts, equipment, services, and documentation necessary to perform maintenance work.

Plan, organize, monitor, and analyze maintenance operations to provide safe, economical, and effective use of labor, materials, and equipment.

Strengths:

Communication skills.

Good decision making.

Good knowledge of all the aspects of Mechanical Maintenance.

Knowledgeable in mechanical equipment.

Troubleshooting. Preventive Maintenance

Maintenance and Repair Management

Pumps/Conveyors/Blowers/Chillers/Gearbox

Mining and Mineral Process/Beneficiation

Alignment (Optical Alignment/Conventional)

Adaptability and Flexibility/Poised under pressure.

Material Requisition/Work Order

Supervision and Leadership

Passport Details :

PASSPORT NO

ISSUED AT

DATE ISSUED

EXPIRY DATE

P2138758b

MANILA, PHILIPPINES

10 MAY 2019

09 MAY 2029

Brief Summary :

TOTAL YEARS EXPERIENCED IN INTERNATIONAL ABROAD

COMPANY

TRADE

COUNTRY

9 YEARS

AMBATOVY & AL SUWAIDI

SENIOR MECHL. ENGINEER

SAUDI ARABIA

TOTAL YEARS EXPERIENCED IN LOCAL

COMPANY

TRADE

COUNTRY

18 YEARS

VARIOUS MANUFACTURING PLANT & EPC

MECHANICAL ENGINEER

PHILIPPINES

TOTAL WORKING EXPERIENCE ( OVER ALL) -

Note: add more pages if required



Contact this candidate