Calle Tramonto Cond. Bianco Interior ** Zibata El Marquez Queretaro, Mexico
CELL # +52-558*******
e-mail: ad4wvr@r.postjobfree.com
Renal Seijas
Objective
B.S in Metallurgical Engineering with Post – Graduate Studies in Material Science.Driven,Results – Oriented Professional with 35 years of Experience in Manufacturing Operation, Logistic, Procurement and Warehouse for The Aluminum and OIL Industry.
Experience
Octuber 2018 – Until now Neo Aluminio S.A. de C.V. Guanajuato, Mexico.
Cast House Manager
Installation and start up for Two Melting furnace, Casting table for Billets, one Holding furnace, one homo furnace and a cooler chamber.
Production, Maintenance and Quality assurance Onfers with management personnel to establish production and quality control standards and to obtain data regarding types, quantities, specifications, and delivery dates of products ordered. Plans and directs production activities and establishes production priorities for products in keeping with effective operations and cost factors. Recommends measures to improve production methods, equipment performance,
July 2015- July 2016 Rigworld Service,L.T.D Ghana, West Africa
General Manager Transatlantic Catering Division
Relationship with Client
Managing Catering supply contract
Monitoring the quality of the supplier and service
Ensuring Health and Safety regulations
July 2010 – May 2015 M & S Multiservicios del Sur,C.A
PETROCEDENO FIELD San Diego de Cabrutica Orinoco Oil Belt ( TOTAL / STAOIL / PDVSA )
Landfill Project Manager
Responsible for all personal and equipment necessary for drilling mud management and transportation from the rig to FTC (Fluid Treatment Center) and Landfill . Land Farm for tillage of the mixture to increase aeration. Technical input to environmental permit applications
Materials management
Led ISO certification effort, which was granted in first attempt.
July 2008 – May 2009 NEPTUNE MARINE & DRILLING Pte Ltd. Muelle Seco Guaraguao,Pto.La Cruz Venezuela.
Logistic Coordinator
Follow up execute all activities related to handling storage of equipment including all documentation required for any shipment/spare transport. (Discoverer & Explorer Vessel)
- Assist in registration and use of the AMOS system for all material handling including spare parts
- Ensure proper handling and follow up inventory report on weekly basis
- Report on discrepancies and request as required safety items, tools, supplies and equipment items for the base activities
- Received and verified all incoming parts are properly packed.
- Prepare Packing List & Proma Invoice of all outgoing shipment to Rig.
- Liaise with the Procument Dept on incoming shipment from external supplier for overseas and local delivery
- Manage daily logistic and operations of warehouse, including updating of stock and annual stock take, using Inventory Management System (Amos)
Dic.2006 – June 2008 PETROBOSCAN ( PDVSA – CHEVRON TEXACO ) Boscan Field,Maracaibo,Venezuela. Drilling & Completion Logistic Coordinator
Responsible for the operation and running of drilling and work for logistic Boscan Base. Including: Planning, Inspection, Locations preparation, Transportation, Lifting Equipment, Vacuuns, Materials and Services to execute the drilling and work over programs. Direct supervision, contract holder and Administrator for heavy equipment and vacuum contracts. Warehouse, store keeping, stock management, Inventory control and reporting for Drilling & Completion spare parts and equipment. Participate in scope of work, company selection, negotiation and Contracts award leaded by Contract Department. Control, check and first approval in JDE system for deliveries and service tickets for drilling and completion.
Dic.2005 – April 2006 SINOVENSA ( PDVSA – CNPC )
Morichal,Monagas,Venezuela
Logistic Coordinator
Contracted for coordination & administrator of all logistic (Purchasing, Warehouse, accommodation and Catering) start-up for De-salting plant.
Jan.2005 – Jul.2005 SINCOR (Pdvsa / TotalfinaElf / Statoil ) Pariaguan,Anzuategui,Venezuela
Logistic superintendent
Jan.2004 – Jan.2005 SINCOR (Pdvsa / TotalfinaElf / Statoil ) Jose Pto.La Cruz,Anzuategui,Venezuela
Construction Site Warehouse & Procurement DMS Project Coordinator
Responsible for procurement of long lead equipments
Act as a liaison coordinator between Engineering,vendors and inspection for all material required for the project.
Managed all freight forwarding, custom, SGS inspection and inland transportation activities.
Coordinated with construction manager all material requirement to avoid delays to the construction schedule
Approves invoices for payment
Expedites delivery of goods to contractors
Analyzes inventory to match the contractors requirements to keep construction schedule.
FEB.2000 – Jan2004 SINCOR (Pdvsa / TotalfinaElf / Statoil ) Pariaguan,Anzuategui,Venezuela
Logistic superintendent
Ensures Environment, Health and Safety maintained at all time for logistic employees and contractors.
Attend and document to daily management meeting.
Drilling/Production Contract and Purchase.(MM-SAP System ).Negotiate claims and mediate contract disputes. Perform selective audits of invoicing. Provide contract interpretation for employees directing the contractor’s work. Provide monthly progress reporting for contract being administrator
Field Warehouse Drilling and Production.( MM-SAP System ).
Warehouse facility and transportation. Implement processes to improve the supply chain the materials into production and drilling material movement including receiving, storage, inventory control, transportation to the rig, cost reduction and supplier development.
General Services ( Taxis / Air Tickets / Hotels / Accommodation / Cars Maintenance / catering / Waste Management/ Personal Transportation ). Preparation and follow-up the inspection plan for all the facilities. Lead weekly improvement safety and operation meeting with the contractors. Promote STOP program and provide information on participation. Participate in permit to work administration and ensure compliance on site. Conduct accident and incident reporting in Logistic area and support HSE team in investigation. Participate in Emergency Respond Activities
Safety & Loss Control ISRS (DNV International Safety Rating System ), ISO – 9000 & 14000 Coordinator
Preparation of budget, plan and objectives
Sept.1999 to Jan., 2000 HECLA MINING Co Pto. Ordaz,Bolivar,Venz
Logistic Consultant
Consulting on: Norms and proceedings warehouse, local and international purchasing.
1993 - 1999 PIVENSA Pto. Ordaz, Bolivar,Venezuela
Logistic Manager
Responsible for planning, direction, and control of development function, acquisition and warehousing of materials, supplies and spares.
Handling warehousing, packing, preservation and dispatch of finish products.
Inventory control.
Purchasing, local and international, import, traffic and customs
Establish, implant and maintain quality standard ISO – 9002.
1992–1993 PIVENSA Pto. Ordaz,Bolivar,Venezuela
Project Coordinator
Responsible for all project operations (lay-out, specifications, bagged stimate, procurement, contract, installation and start-up).
Traffic, customs and transportation of equipment, for 2 holding furnace cap. 100tm.1 annealing furnace cap. 60tm.1 cold rolling mill and 1 slitting line. Project total cost $ 9.000.000,00
1991 –1992 A G A, GAS Caracas, Venezuela.
Metallurgic and Combustion Chief Engineering
. Technical assistance for aluminum industries.
. Development of AGA MIX 14.
1989 – 1991 C.V.G ALCASA Pto. Ordaz, Bolivar,Venezuela
Senior Engineering
. Start – up and production coordinator.
. Directions, supervision, start – up, equipment production, operation personal training, equipment maintenance, spare parts catalogue, manuals preparation for operations and maintenance for 1 hot rolling mill, 1 cold rolling mill, 1 scalper, 2 preheated furnace, 2 annealing furnace.
1987 – 1989 C.V.G ALCASA Pto. Ordaz,Bolivar,Venezuela
Chief Project Engineering
. Contract administration, time estimate, bagged control, procurement, installation and start – up, for cast house facility and crucible cleaning line. Including: 5 tilting furnace, 2 vertical cast table, 4 degassing in line filter, 1 slab saw, 1 billet saw and 5 cranes.
1982 – 1987 CERAMICAS CARABOBO ( HARBISON WALKER REFRACTORY ) Pto.Ordaz,Bolivar,Venezuela
Chief Production Engineering
. Direction and supervision for The Operations in Refractory Plant :
Raw material Reception & Storage
Grinding & Mixing
Laboratory Granulometry and Recipe Preparation
Mold Preparation
Presses for Clay and Magnesite Bricks
Tunnel Type Furnaces for Dry and coction
Education
1968–1974 Escuela Tecnica Industrial Bolivar,Venz.
Electrical Technician
1976 – 1981 University of Alabama Tuscaloosa, Al, U.S.A.
. B.S Metallurgical Engineering.
1989 – 1991 U.C.V / UNEXPO Pto. Ordaz,Bolivar, Venz.
. Post- Graduate Studies in Material Science
PC SKILL WINDOWS (WORD, EXCEL, POWER POINT).
ENGLISH AND SPANISH
STOP ( Safety / Training / Observation / Preventive ) FOR SUPERVISER
DUPONT.
INTERNAL AUDIT FOR QUALITY STANDARD ISO – 9000/14000 & SCIS
ISO - 14000
Safety & Lost Control Modern Administration – Det Norske Veritas ( SCIS )
ISO – 9000 / ISO – 14000
BSafe HSE Training
SAP MM Materials Module for Requester / Purchaser / Contract / Warehouse
H2S Management / Work Permit
First Response for Dangerous Materials / First Aid
Safety Accredited Auditor
MS Project
Budget Formulation & Control
Purchaser Management Guided by Quality
Warehouse Management