Post Job Free

Resume

Sign in

Quality Assurance Project Manager

Location:
Guanajuato, 36040, Mexico
Posted:
April 10, 2024

Contact this candidate

Resume:

Calle Tramonto Cond. Bianco Interior ** Zibata El Marquez Queretaro, Mexico

CELL # +52-558*******

+1-786-***-****

e-mail: ad4wvr@r.postjobfree.com

Renal Seijas

Objective

B.S in Metallurgical Engineering with Post – Graduate Studies in Material Science.Driven,Results – Oriented Professional with 35 years of Experience in Manufacturing Operation, Logistic, Procurement and Warehouse for The Aluminum and OIL Industry.

Experience

Octuber 2018 – Until now Neo Aluminio S.A. de C.V. Guanajuato, Mexico.

Cast House Manager

Installation and start up for Two Melting furnace, Casting table for Billets, one Holding furnace, one homo furnace and a cooler chamber.

Production, Maintenance and Quality assurance Onfers with management personnel to establish production and quality control standards and to obtain data regarding types, quantities, specifications, and delivery dates of products ordered. Plans and directs production activities and establishes production priorities for products in keeping with effective operations and cost factors. Recommends measures to improve production methods, equipment performance,

July 2015- July 2016 Rigworld Service,L.T.D Ghana, West Africa

General Manager Transatlantic Catering Division

Relationship with Client

Managing Catering supply contract

Monitoring the quality of the supplier and service

Ensuring Health and Safety regulations

July 2010 – May 2015 M & S Multiservicios del Sur,C.A

PETROCEDENO FIELD San Diego de Cabrutica Orinoco Oil Belt ( TOTAL / STAOIL / PDVSA )

Landfill Project Manager

Responsible for all personal and equipment necessary for drilling mud management and transportation from the rig to FTC (Fluid Treatment Center) and Landfill . Land Farm for tillage of the mixture to increase aeration. Technical input to environmental permit applications

Materials management

Led ISO certification effort, which was granted in first attempt.

July 2008 – May 2009 NEPTUNE MARINE & DRILLING Pte Ltd. Muelle Seco Guaraguao,Pto.La Cruz Venezuela.

Logistic Coordinator

Follow up execute all activities related to handling storage of equipment including all documentation required for any shipment/spare transport. (Discoverer & Explorer Vessel)

- Assist in registration and use of the AMOS system for all material handling including spare parts

- Ensure proper handling and follow up inventory report on weekly basis

- Report on discrepancies and request as required safety items, tools, supplies and equipment items for the base activities

- Received and verified all incoming parts are properly packed.

- Prepare Packing List & Proma Invoice of all outgoing shipment to Rig.

- Liaise with the Procument Dept on incoming shipment from external supplier for overseas and local delivery

- Manage daily logistic and operations of warehouse, including updating of stock and annual stock take, using Inventory Management System (Amos)

Dic.2006 – June 2008 PETROBOSCAN ( PDVSA – CHEVRON TEXACO ) Boscan Field,Maracaibo,Venezuela. Drilling & Completion Logistic Coordinator

Responsible for the operation and running of drilling and work for logistic Boscan Base. Including: Planning, Inspection, Locations preparation, Transportation, Lifting Equipment, Vacuuns, Materials and Services to execute the drilling and work over programs. Direct supervision, contract holder and Administrator for heavy equipment and vacuum contracts. Warehouse, store keeping, stock management, Inventory control and reporting for Drilling & Completion spare parts and equipment. Participate in scope of work, company selection, negotiation and Contracts award leaded by Contract Department. Control, check and first approval in JDE system for deliveries and service tickets for drilling and completion.

Dic.2005 – April 2006 SINOVENSA ( PDVSA – CNPC )

Morichal,Monagas,Venezuela

Logistic Coordinator

Contracted for coordination & administrator of all logistic (Purchasing, Warehouse, accommodation and Catering) start-up for De-salting plant.

Jan.2005 – Jul.2005 SINCOR (Pdvsa / TotalfinaElf / Statoil ) Pariaguan,Anzuategui,Venezuela

Logistic superintendent

Jan.2004 – Jan.2005 SINCOR (Pdvsa / TotalfinaElf / Statoil ) Jose Pto.La Cruz,Anzuategui,Venezuela

Construction Site Warehouse & Procurement DMS Project Coordinator

Responsible for procurement of long lead equipments

Act as a liaison coordinator between Engineering,vendors and inspection for all material required for the project.

Managed all freight forwarding, custom, SGS inspection and inland transportation activities.

Coordinated with construction manager all material requirement to avoid delays to the construction schedule

Approves invoices for payment

Expedites delivery of goods to contractors

Analyzes inventory to match the contractors requirements to keep construction schedule.

FEB.2000 – Jan2004 SINCOR (Pdvsa / TotalfinaElf / Statoil ) Pariaguan,Anzuategui,Venezuela

Logistic superintendent

Ensures Environment, Health and Safety maintained at all time for logistic employees and contractors.

Attend and document to daily management meeting.

Drilling/Production Contract and Purchase.(MM-SAP System ).Negotiate claims and mediate contract disputes. Perform selective audits of invoicing. Provide contract interpretation for employees directing the contractor’s work. Provide monthly progress reporting for contract being administrator

Field Warehouse Drilling and Production.( MM-SAP System ).

Warehouse facility and transportation. Implement processes to improve the supply chain the materials into production and drilling material movement including receiving, storage, inventory control, transportation to the rig, cost reduction and supplier development.

General Services ( Taxis / Air Tickets / Hotels / Accommodation / Cars Maintenance / catering / Waste Management/ Personal Transportation ). Preparation and follow-up the inspection plan for all the facilities. Lead weekly improvement safety and operation meeting with the contractors. Promote STOP program and provide information on participation. Participate in permit to work administration and ensure compliance on site. Conduct accident and incident reporting in Logistic area and support HSE team in investigation. Participate in Emergency Respond Activities

Safety & Loss Control ISRS (DNV International Safety Rating System ), ISO – 9000 & 14000 Coordinator

Preparation of budget, plan and objectives

Sept.1999 to Jan., 2000 HECLA MINING Co Pto. Ordaz,Bolivar,Venz

Logistic Consultant

Consulting on: Norms and proceedings warehouse, local and international purchasing.

1993 - 1999 PIVENSA Pto. Ordaz, Bolivar,Venezuela

Logistic Manager

Responsible for planning, direction, and control of development function, acquisition and warehousing of materials, supplies and spares.

Handling warehousing, packing, preservation and dispatch of finish products.

Inventory control.

Purchasing, local and international, import, traffic and customs

Establish, implant and maintain quality standard ISO – 9002.

1992–1993 PIVENSA Pto. Ordaz,Bolivar,Venezuela

Project Coordinator

Responsible for all project operations (lay-out, specifications, bagged stimate, procurement, contract, installation and start-up).

Traffic, customs and transportation of equipment, for 2 holding furnace cap. 100tm.1 annealing furnace cap. 60tm.1 cold rolling mill and 1 slitting line. Project total cost $ 9.000.000,00

1991 –1992 A G A, GAS Caracas, Venezuela.

Metallurgic and Combustion Chief Engineering

. Technical assistance for aluminum industries.

. Development of AGA MIX 14.

1989 – 1991 C.V.G ALCASA Pto. Ordaz, Bolivar,Venezuela

Senior Engineering

. Start – up and production coordinator.

. Directions, supervision, start – up, equipment production, operation personal training, equipment maintenance, spare parts catalogue, manuals preparation for operations and maintenance for 1 hot rolling mill, 1 cold rolling mill, 1 scalper, 2 preheated furnace, 2 annealing furnace.

1987 – 1989 C.V.G ALCASA Pto. Ordaz,Bolivar,Venezuela

Chief Project Engineering

. Contract administration, time estimate, bagged control, procurement, installation and start – up, for cast house facility and crucible cleaning line. Including: 5 tilting furnace, 2 vertical cast table, 4 degassing in line filter, 1 slab saw, 1 billet saw and 5 cranes.

1982 – 1987 CERAMICAS CARABOBO ( HARBISON WALKER REFRACTORY ) Pto.Ordaz,Bolivar,Venezuela

Chief Production Engineering

. Direction and supervision for The Operations in Refractory Plant :

Raw material Reception & Storage

Grinding & Mixing

Laboratory Granulometry and Recipe Preparation

Mold Preparation

Presses for Clay and Magnesite Bricks

Tunnel Type Furnaces for Dry and coction

Education

1968–1974 Escuela Tecnica Industrial Bolivar,Venz.

Electrical Technician

1976 – 1981 University of Alabama Tuscaloosa, Al, U.S.A.

. B.S Metallurgical Engineering.

1989 – 1991 U.C.V / UNEXPO Pto. Ordaz,Bolivar, Venz.

. Post- Graduate Studies in Material Science

PC SKILL WINDOWS (WORD, EXCEL, POWER POINT).

ENGLISH AND SPANISH

STOP ( Safety / Training / Observation / Preventive ) FOR SUPERVISER

DUPONT.

INTERNAL AUDIT FOR QUALITY STANDARD ISO – 9000/14000 & SCIS

ISO - 14000

Safety & Lost Control Modern Administration – Det Norske Veritas ( SCIS )

ISO – 9000 / ISO – 14000

BSafe HSE Training

SAP MM Materials Module for Requester / Purchaser / Contract / Warehouse

H2S Management / Work Permit

First Response for Dangerous Materials / First Aid

Safety Accredited Auditor

MS Project

Budget Formulation & Control

Purchaser Management Guided by Quality

Warehouse Management



Contact this candidate