Post Job Free

Resume

Sign in

Site Superintendent Project

Location:
Wilmington, NC, 28401
Salary:
110,000
Posted:
April 09, 2024

Contact this candidate

Resume:

Richard J. Garrison

**** ******* ****** **. ******, NC. 28425

ad4vwu@r.postjobfree.com 910-***-****

Superintendent

Site Supervision

Highly accomplished Site Superintendent with 30+ years of solid and progressive management experience in all facets of heavy construction and concrete projects. Results-oriented and decisive leader with proven success in directing construction efforts and completing projects within allotted time frames and budgetary constraints. Instrumental in enhancing efficiency and ensuring the safety of all crew members. Adept in carpentry, pipe laying, mechanical operations, and concrete finishing. Utilized all types of forming systems including Job Built, Symons, EFCO, Gates, Alisply, Doka and Versiforms. I have never experienced a lost time accident on any crew I have supervised.

Core Competencies

•Innovative Leadership

•Safety Management

•Quality Assurance

•Heavy Civil Construction

•Crew Supervision

•Cost Containment &Job Cost

•Mass Concrete Placement

•OSHA Compliance

•Construction Equipment

M.B. KAHN Waterworks Columbia, SC.

2022-2024

Project Superintendent, Easley WWTP, Easley, SC. Upgrade exsisting plant--85' clarifier, pump station. New INF and Eff lines---30" & 24" DIP including manholes. 1100' 14" HDPE.

Self perform all mechanical and piping, clarififer equip. installation and testing of all equip.

Flintco Industrial, TX. 2019-2021

Project Superintendent, Fort Bend Lid #2 storm water pump station, 45’ deep excavation, 50,000 cy of spoil removal, 13,000cy of concrete, 37’ tall walls. 2,200cy in base slab cast in one placement. 1,500hp pumps---7ea. –1.3 million gpm removal of storm water.

Johnston Construction Company, Dover, PA. 2018-2019

Site Superintendent---Oxon Hill, MD.--All Mechanical, underground pipe, concrete, site work and holding ponds. Oxon Hill water department, New 3m gallon water storage tank—Elevated.

State Utility Contractors, Monroe, NC. 2017-2018

Site Superintendent—City of Havelock, NC. Supervise and manage all construction for an upgrade to the existing WTP. New clarifier, drying beds and all associated piping, from 2’’ PVC to 12’’ DIP. This included all mechanical installations, stair towers, pump stations, pumps and miscellaneous metals.

Layne Heavy Civil, Fairburn, GA. 2015-2017

Project Superintendent—New Heritage Pump Station, Fort Mill, SC. York County Water & Sewer Board

Supervise and manage all concrete and equipment installation for a new pump station—50’deep excavation using a sheet pile coffer dam and soil nails. Installed all pumps and piping also new Control building.

Layne Heavy Civil, Fairburn, GA. 2013-2015

Project Superintendent—Hard Labor Creek Dam Project, Social Circle, GA. Walton County water & sewer.

Supervise and Manage turn key dam project, 1300 acre site, clear site of all timber to make ready for resivore.

Place seal slabs and cradle for 72” RCP, riser strucure and Chute spillway concrete 15,000cy, self perform all concrete and mechanical work.

Johnston Construction Company, Dover, PA. 2013-2013

Site Superintendent—Qunatico Marine Base, Quantico, VA.

East Side Waste Water Treatment Plant Repairs and Upgrades to the exsisting 4MGD facilities-NAVFAC.

Superivse all concrete and new equipment installations. We installed a new UV system, 4 new blowers and piping, new grit system, classifier and separator units, new diffusers in 2 digesters and 1 equallization tank.

Pepper Lawson Water Works, Houston, TX 2012-2013

Site Superintendent--East Water Purification Plant, Houston, TX. City of Houston

Superivse crews for rehab and new construction at the East side 300MGD water plant. Rebab of 32 filters, demo and installation of new 60” spiral steel pipe, this included the use of a 60” line stops as the city’s valves wouldn’t operaterate and a new 2,500hp pump FRP concrete for the new elevated control structure, this involved drilled pier shafts and flat work and pre-stressed concrete panels.

UCI- Witchita, KS. 2012-2012

Site Superintendent—Clinton, OK.

Devon Gas Plant—Burns and McDonald

Superivse turnkey construction of gas plant, dirt crew moved 390,000cy of dirt, installed all storms drain systems.

Supervised concrete and anchor bolt placements for equipment installations.

Site Superintendent—Brigdeport, TX.Devon Gas Plant—Burns and McDonnald

Superivse all concrete and anchor bolt placements for equipment installation. Schedule crews, forms systems, concrete and QC all installations of anchor bolts. We had 60 hands on deck, broke into 6 different crews, support monoliths, walls support slabs with containment. We also installed all under drain piping.

CAJUN CONSTRUCTORS-Baton Rouge, LA. 2010-2012

Flood Gate Superintendent—Westwego, LA. U.S. ARMY CORPS OF ENGENEERS

Supervise and train day and night shift crews to construct a flood control sector gate, 6000cy concrete, marine inviorment, barge mounted 350t cranes. Working within a 600’ coffer dam, setting all equipment—gates @ 55t ea.

CAJUN CONSTRUCTORS- Baton Rouge, LA. 2008-2010

Area Superintendent/HARVEY FLOOD WALL, HARVEY, LA. U.S. ARMY CORPS OF ENGENEERS

Supervised 3 crews: base slab, gate monoliths and wall crews. Provide the necessary skill and safety training to ensure

a safe and productive work site. Manage the crews to provide that the work flowed to meet the schedule. This required that all heavy equipment, forms, pile driving crews and forms be scheduled properly. Coordination between other area’s and vendors was critical to complete a fast tracked job.

CHOATE CONSTRUCTION COMPANY – Atlanta, GA

2007 – 2008

Site Superintendent/ MILLBROOK WWTP, MILLBROOK, AL. CITY OF MILLBROOK

Provide leadership and direction to all operational, site, and crew responsibilities at the site. Handle safety management and OSHA compliance initiatives. Supervise the team in performing job tasks efficiently and safely. Track costs and implement cost control measures for the projects. Coordinate heavy equipment and deliveries of heavy equipment to job sites. Schedule and plan work utilizing the critical path method. Inform site inspectors of the progress of all projects.

Key Achievements:

Directed daily project activities for a 2M GPD Waste Water Treatment Plant.

Spearheaded efforts to upgrade to 6.3 MGD-New Aeration structure, clarifier, and Headworks.

CROWDER CONSTRUCTION – Charlotte,NC 2004 – 2007

Area Superintendent/ WILMINGTON WWTP, WILLMINGTON, NC. CITY OF WILMINGTON

Coordinated concrete activities associated with 10,000 cubic yards. Performed construction tasks involving elevated decks and 300 penetrations. Scheduled the delivery and utilization of heavy equipment for projects. Performed job coating functions.

Key Achievements:

Set equipment and aeration pipe/diffusers, slide/sluice gates, and weirs.

Maintained full control of quality assurance initiatives for all projects.

HICKORY CONSTRUCTION – Hickory, NC

2003 – 2004

Area Superintendent/ EASLEY WTP, EASLEY SC. CITY OF EASLEY

Handled concrete for the holding tank structure involving 7,000 cubic yards of concrete. Formed and placed concrete for 25 ft. walls and elevated decks. Supervised and trained the crews in daily job tasks.

Key Achievements:

Adhered to safety management protocols utilizing sound business acumen.

CAJUN CONSTRUCTORS – Baton Rouge, LA

2002 – 2003

Area Superintendent/FT. RILEY WWPT, FT. RILEY KS. US ARMY CORPS OF ENGENEERS

Executed crew supervision, safety management, and training initiatives on a daily basis. Coached and mentored crews to perform at optimal levels. Contributed to job costing and quality management initiatives.

Key Achievements:

Spearheaded project management activities and ensured all projects were completed within established time lines.

M.B. KAHN CONSTRUCTION COMPANY – Greenwood, SC

2000 – 2002

Job Superintendent/FOREST CITY WTP, FOREST CITY, NC.

Supervised construction activities within waste water and water treatment facilities. Worked on underground pipe and concrete projects. Tracked and measured the crew’s daily production rates. Obtained permits and licenses for all projects.

Key Achievements:

Ensured all projects were completed on time and within budget.

LEE CONSTRUCTION OF THE CAROLINAS – Charlotte, NC

1999 – 2000

Bridge Superintendent/ DOT SC. I-85 BRIDGE AT TYGER RIVER, GREENVILLE, SC.

Completed all facets of bridge work on a daily basis. Installed bents, decks, and overhangs successfully. Complied with building codes for all projects. Researched and resolved problems in a timely manner.

Key Achievement:

Ensured all projects were completed efficiently and within safety codes.

*** Additional employment includes Superintendent – Cajun Constructors (1994 – 1999); Site Supervisor – M & W Builders (1990 – 1994); Shuss & Vratil (1985-1990)

Education & Credentials

Bachelor of Science, Criminal Justice – Chadron State College – Chadron, NE

Training:OSHA 10 hr. OSHA 30hr. Standards, S.T.A.R.T., Near Miss-Hazard Recognition-Investigation Reporting, Human Recourses Best Practices, Incident Investigation and Crane Management Awareness. Competent person-fall protection, trenching & excavation, scaffolding, rigging, and assured grounding. CPR, 1st Aide and 1st Responder qualified. TWIC card issued—2013

Military Experience: United States Army, Airborne, Ranger School. AMF/ 1st BN/509th Airborne Infantry, Verona, Italy



Contact this candidate