Hvac Technician Construction Superintendent

Location:
Blackwood, NJ
Salary:
$75,000 +
Posted:
April 07, 2024

Contact this candidate

Resume:

Professional Summary

Diligent and conscientious pipefitter, plumber, and HVAC technician with

40+ years on the job experience and professional training. Adept at evaluating, inspecting, and isolating any faults and repairing or rebuilding systems to specifications. Seeking position as a superintendent of facilities, director of maintenance, maintenance manager, construction superintendent or building superintendent.

Qualifications and Certifications

• Member U.A. local #322 (06/09/1987)

• 5-year Apprenticeship HVAC (graduated 1992 with Honors)

• State of NJ HVAC Certification

• U.A, Certified in Welding and Brazing

• Medical Brazing Certified

• OSHA 30 Safety Certified

• Valve Technician in Back Flow prevention

• Wardflex/CSST Flexible Gas Pipe Certification

• BuiltRite Safety Certification

• TWIC Certified

• Delaware Valley Safety Council Certified

• Liquid Pipeline General Abnormal Operating Conditions Certified

• National Construction Industry Partnership Alliance Certification

• SpecSeal Firestop and Floor Prevention Certification

• Megan’s Law Fingerprint & Background Certification (Certified to work in schools, daycares, and maternity facilities)

• Certified and/or trained in:

• Instrumentation

• Medical Gas

• Boiler Systems (water and steam)

• Solar and Energy Systems

• Reclaim System and Recovery

• Regulations and Code Enforcement

• Rigging and Cranes

Work History

2023 to Present

West Deptford Township School System (All five schools)

• Lead Maintenace HVAC Technician, and Assistant to the Director of Facilities

• Boiler care (Rebuild and Maintenace), gas piping, blowers, controls, industrial chiller and cooling systems, handling of preventive maintenance to roof top units, split systems, gas fired units, condensers. All aspects of plumbing, HVAC and building operations, rehabilitation and recycling.

2022

Falasca Mechanical – Shop pipe fabrications

• Bridgeton School – HVAC additions, gas piping, boiler room piping, rooftop gas piping, condensate and chilledwater piping

• Wildwood High School - HVAC additions, gas piping, boiler room piping, rooftop gas piping, condensate and chilledwater piping, gas piping tie in. 2021-2022

AC Mechanical

• Bally’s Tower Renovations and Beach Bar Projects – 350 room renovations, plumbing, heating, cooling, condensate piping, bar sink, ice machine, kitchen equipment. 2021

Elliott-Lewis Mechanical

• Cooper Hospital (7 times) – Numerous exam room changes, treatment rooms, boilers, HVAC, medical gas, condensate and steam trap piping. 2019-2021

Falasca Mechanical – Shop Steward

• Inspira Hospital –Medical gas piping, room head connection outlets, all medical gas main tie-ins to supply and return piping.

• Vineland Hospital Addition – All rooftop HVAC units, 12-piece module coils, blowers, heat wheels, chiller and condenser piping, roof drains, condensate piping and pumps. 2018-2019

Spina Mechanical – Foreman

• Haddonfield High School Addition – All piping aspects, entire mechanical room layout, pumps, expansion tanks, underground, bathrooms, kitchens, gas, water, heating, cooling, HVAC, plumbing, all roof piping, supports, penetrations into building. 2017

JJ White Inc.

Repauno Butane Storage Facility – Railroad distribution and pump station project, pump house replacement, well cap piping attachments for process piping in racks to railroad fill distribution station.

2016-2017

Trematore Plumbing

• Gloucester City Grammar School – All aspects of this building, plumbing, gas pipe water transfer pumps, kitchen equipment, refrigeration, pneumatic and instrumentation piping, supports, ice machines, and gas mains.

2015-2016

Matrix NAC

• Mickelton Electrical Boost & Delivery Station – Natural gas and stainless-steel transfer piping, chrome pipe supports, pneumatic & air distribution piping. 2013-2015

Azco Contractors

• LS Power Station Deptford, NJ – All aspects of piping, top of Hertzig boiler main steam piping, cooling water, all various boiler heating, cooling, blowoff piping, hangers, supports, pumps, expansion joints, gas piping connections directly to generators. 2011-2013

Falasca (back and forth employed)

• Shop fabrications, piping, and pump bases.

• Cooper Hospital – New rooms, medical gas, and boiler room

• M.D. Anderson Cancer Center – Treatment rooms, new and modified chiller room, pump design and layout, blow off valves, sub frames and roofing support systems.

• Revel Hotel and Casino Atlantic City

Scheck Mechanical

• Sunoco Refinery Breakdown and Modification to change over to holding tank farm – New fuel transfer pump skids, 36” & 48” piping, valves, supports, trestles, bridge piping supports, expansion loops, relief valve and blow off piping. 2010

MCT Marley Cooling Towers- Foreman

• Salem Nuclear Power Plant Hope Creek – Rebuilt cooling tower, 29,000 nozzles, 1.7 miles of internal piping, 6 main intake & exhaust pumps, valves, strainers and make-up water. 2006-2009

Trent Enterprises – General Foreman

• Trump Marina, Caesar’s, Bally’s, and Harrahs – Heating, A/C, thermostats, boilers, energy projects with engineers, steam blowoff stations, heat recovery, steam stop & wastes. Energy project with large volume air handlers, and installation of 80 – (26 foot) coils. 2005

Cherne Contracting Group – General Foreman

• Sunoco – New FCC unit piping, heating, cooling, gas and steam piping. Falasca – Foreman 2nd shift

• New 100 room wing, comfort and gas piping.

2004-2005

Trent Mechanical – General Foreman (all crews)

• Showboat – All electrical, electrical engineering, roofers, all trades general contractor, energy and boiler room modifications.

2003

Barham/McBride – Piping Foreman

• Borgata – Comfort piping from basement to 43rd floor and back to mechanical rooms. Tracey Mechanical – Area Foreman

• Elkin Sinn Pharmaceuticals – Critical piping, new drug labs, and critical path project. Associate Industrial Services – Area Foreman

• Hope Creek Nuclear Plant – Rebuild of cooling tower, 23,000 aerating heads, 2,900 feet of pipe replacement, and rebuild of pump station.

Collins & Collins – Foreman

• Rowan University – Piping, heating, and cooling for new dorms and science building. 2002-2003

Tracorp – Plumbing Foreman

• Harrah’s Casino- installation and completion of bathrooms (start to finish) 2001-2002

Tracey Mechanical - Piping General Foreman HVAC & Exhaust superintendent

• Elkin Sinn Pharmaceuticals - Installation of critical pharmaceutical HVAC systems, collectors, comfort pipe, and 4 different streamlines (different pressures and temperatures)

1998-2001

Dovar Mechanical – HVAC and General Foreman

• Philadelphia Naval Yard – Boiler and chiller installation, HVAC project manager, field installation supervisor.

1997-1998

Nagel – Levine Construction – Foreman

• New Acme Market

• New building Moorestown Mall

• Philly Housing Project – 600 rooms, new gas piping, heating and A/C, chilledwater mains and branches.

1996-1997

Natkin Contracting - Foreman

• Bridgeton Prison Construction (New) – Mechanical room piping, heating, A/C and comfort piping.

1995

Mobil Oil Raytheon Contractor – Area Foreman

• In Charge of 8 foreman, and 80 crew members for 17 weeks. Rebuild of unit and install of new scrubbers.

1991-1994

Liber Rich Mechanical Contractors – Foreman

• Atlantic City Racetrack – Oversaw of chiller exchange and piping crew, welders, plumbers and engineers.

1989-1991

F.W. Vesper Mechanical Contractors – Foreman

• Service Shop – HVAC, mechanical engineering layouts, blueprint modifications. Education

• United States Navy

o Naval Delayed entry program - 11/1981

o Entered US Navy - 06/1982

o Honorable Discharge - 02/1987

• Shawnee High School - 06/1982



Contact this candidate