Post Job Free

Resume

Sign in

Team Lead Senior Manager

Location:
Sherman, TX
Posted:
April 07, 2024

Contact this candidate

Resume:

Muhammad Akram Khan

Karahi, Pakistan • Tel: + (92-300******* • Email: ad4t7c@r.postjobfree.com, ad4t7c@r.postjobfree.com

Summary

Having 38 Years experience in the Oil and Gas industry (Pakistan Petroleum Limited) at Team lead level in the maintenance disciplines of Drilling / Workover Rigs and associated equipment (mechanical, electrical, hydraulic & pneumatic systems) at Rigs and plants.

Planning, execution of various Inspections, condition surveys, repairs, major Overhauls & refurbishment of rotating & static equipment as per OEM / API Standards thru accredited workshops and on site as per operations requirement.

Deliver support services for procurement, logistics, warehousing, contracts & Administration.

I have Diploma of Associate Engineer (DAE) in Mechanical Technology and having skills in Microsoft office, SAP (R3P) and Tejari (e-procurement).

Work Experience

2019-2024 Dy. Chief Engineer (Maintenance) Pakistan Petroleum Limited Karachi, Pakistan

Reporting to Senior Manager drilling & completion engineering and collaboration with team leads at various locations, where drilling operations are ongoing with company and contractor Rigs.

Collaborate Rig move plan, site surveys for the under construction well site locations, routes, logistic arrangements.

Coordinate procurement, security, construction, communication, and HR departments to align and mobilize materials and support services to drilling of oil & gas well locations.

Plan and conduct rig condition surveys, major overhaul of Diesel Engines / Generators (Caterpillar), Mud pumps, draw works, Mast, Rig structure base, mud system, hydraulic control units, lifting gears.

Plan and monitor Re-furnishment of BOPs (CAMERON & HYDRILL) at accredited workshops for certification and rectification of major / critical observations by Rig surveyors.

Ensure procurement of spare and materials, process included from press tendering to delivery ( preparation of specifications, scope of work, BOQ, Prepare Tender documents, Technical / Financial Evaluations, Pre-delivery inspections, Procurement, and delivery at sites).

Preparation of Capex, Opex and Revex budget proposals, attend meetings for approvals, monitoring and control of departmental budget.

Oversee QHSE compliance, staff Training, assessment of annual appraisal of reporting staff.

2013-2018 Senior Engineer Maintenance Pakistan Petroleum Limited Karachi, Pakistan

Collaborate Rig mobilizations including loading / off-loading of Rig loads thru 40ft long bed trailers.

Supervision of Rig down, Rig up activities.

Examination / operation testing of engine, pumps, air compressors (Atlas Copco) to make sure all system are working.

Coordinate procurement of critical and consumable spares and materials thru SAP system .

Collaborate maintenance of mobile plant and Fire equipment at rig site (Hydraulic Crane, Fire tender, Forklift, Wheel loaders, Trailers, Oil field trucks).

overseeing of work orders generated thru SAP PM Module for all maintenance activities of drilling rotating machinery of Card-Well H-725 Rig and KB-500 workover Rigs.

Management of skilled / unskilled crew including daily matter, attendance, leaves, training career growth, and annual increment / promotion recommendations thru Succes Factor / SAP Modules.

2010-2012 Engineer Incharge Sui Development Pakistan Petroleum Limited Karachi, Pakistan

Worked as Head of the department at Sui Gas Field (Baluchistan Province, Pakistan) and directly reporting to Senior Manager Drilling Operations at Head office, Karachi.

Responsible for administrative, logistics, security, travel arrangement of staff and technical supports to well site during drilling / work over activities by company (PPL) and contractor Rigs at various locations all over Pakistan.

Collaboration & Supervision of Garage activities include maintenance management of long bed trailers, cranes, fork-lifts, dozers, and other earth moving equipment to facilitate ongoing drilling activities.

Execution and monitoring of civil construction work and miscellaneous maintenance repairs for up-keep of residential accommodations / Porta camps at site.

Responsible for preparation of budget proposals for upkeep maintenance and other expenses.

Evaluate skilled staff performance and preparation of Annual appraisals of reporting staff and submit to management for future, promotions, trainings etc.

2007-2009 Engineer Maintenance Pakistan Petroleum Limited Karachi, Pakistan

Review and initiate materials requirement & spares of all equipment’s to meet the operational requirement of future rig operations.

Develop Rigs and its ancillary’s schedule, predictive, preventive, and corrective, break down maintenances. Arrange & monitor major overhauls of Engines / Generators, Mud pumps, Electrical system, Accumulators, BOPs etc.

Ensure rig logistics for mobilization, rig-up, rig down operations within scheduled work program for PPL and Joint venture areas within allocated time frame and budget.

Prepare refurbishment plan of company owned porta camp and appliances to run the camp smoothly.

2001-2006 Deputy Engineer Maintenance Pakistan Petroleum Limited Karachi, Pakistan

Supervise the Major overhaul of mechanical rig outfits (IDECO H-725) and accessories with own sources and staff to rectify the observations / recommendations of 3rd party inspections and manufacturer recommendations.

Remained deputed at various well sites and managed mobilization of rig, logistic, schedule / preventive maintenance of Generator, diesel engines, Mud pump, agitators, electrical and hydraulic systems, draw works, mast etc. to make the equipment in operative condition during drilling / work over wells.

Provision of support services to off-shore Rig operations (ANSCO-95) responsibilities included management of the onshore basecamp for the supply of materials, diesel, service company’s equipment’s transportation thru boat and visit to offshore Rig for quick response in emergencies at offshore Well.

2000-2001 Assistant Engineer Maintenance Pakistan Petroleum Limited Karachi, Pakistan

Supervision of Generators, Mud pumps, Electrical systems / Motor control centers, hydraulic & pneumatic systems, mud equipment’s to make sure smooth operations during drilling/work-over.

Maintaining logbooks of engine hours and arrange maintenance as per schedule.

Plan and execute upkeep of Oil field fleet and mobile plants (i.e. Cranes, Welding plants, wheel loader, fork Lifter etc.).

Execution of miscellaneous fabrication jobs at rig site and porta camp for upkeep of equipment and office cum residential cabins.

Maintaining standards of excellence on site with responsibility for ensuring all HSE & QMS guidelines.

1994-1999 Assistant Engineer (Garage & Machine-Shop) Pakistan Petroleum Limited. Karachi, Pakistan

To manage Garage & machine shop facilities at Sui Gas Field for the repairs of vehicles and Gas purification plants equipment and major overhauls of fleet vehicles, mobile plants, cranes, wheel loaders, earth moving machines.

Shop floor management of staff in the Garage and machine shop including promotion plans and training of staff.

1991-1993 Foreman (Garage & Machine-Shop) Pakistan Petroleum Limited. Karachi, Pakistan

Supervision / Monitoring of machine shop operations to carry out the reconditioning / refurbishment of multistage centrifugal pumps, steam turbine rotors and miscellaneous fixture and fittings of purification plant at Sui Gas Field.

Workshop floor management, maintenance of the machines and coordination with all concerned / departments to carry out the desired repairs.

1986-1990 Foreman (Garage & Machine-Shop) Pakistan Petroleum Limited. Karachi, Pakistan

Supervision of shift for the operation of water pumping station for supply of water thru 20 inch pipeline to 50 km away installed water storage tanks at Sui Gas Field.

Supervision and lead maintenance of dual fuel Engines (2000HP) and Multistage centrifugal pumps. Generators, Compressors, Water storage tanks etc.

Participate in the major overhaul of dual fuel operated gas engines at location.

1985-1986 Supervisor Quality Assurance Allwin Engineering Industries Karachi, Pakistan

Inspection of master gauges (go/not go type) used for the quality check of auto Parts in machines shops of auto parts industry (Piston, liners, and other engines parts manufacturing industries).

1984-1985 Supervisor Die-Casting Baluchistan Engineering Works Ltd. Karachi, Pakistan

Supervision of night shift for die casting machine operations for the casting of Aluminums parts of YAMAHA motorcycles.

Education

1981-1984 Diploma of Associate Engineer, Government College of Technology, Karachi, Pakistan

Relevant Skills

Computer skills: Microsoft Office,

Soft skills: SAP (R3P), Tejari (e-procurement)

Technical Skills: Maintenance (mechanical, electrical, civil, woodwork, air conditioning and housing) welding, fabrication, machine shop operations, contract.

Driving skills: car, small trucks, fork-lift, wheel loaders for loading / off loading

Financial skills: Annual Budget preparation and monitoring.

Languages: Urdu (Native) & English (Fluent in listening, writing, speaking)

Professional Certifications

Attended various professional trainings / refresher sessions over the period of 37 years during service at various positions and departments.

Visa Status:

USA Visit Visa (M) valid up to 19/03/2028

Canadian visit visa (M) valid up to 16/01/2025



Contact this candidate