Construction Manager Project

Location:
London, Greater London, United Kingdom
Salary:
2500 pounds
Posted:
March 29, 2024

Contact this candidate

Resume:

Mr CHRISTOPHER GATHERUM

Email – ad4non@r.postjobfree.com Mobil +44 - 077******** . CONSTRUCTION PROJECT MANAGER / SITE MANAGER AN OUTSTANDING AND DEDICATED ENGINEER (BSc) CONSTRUCTION ENGINEER TRAINED IN THE UK. I AM LOOKING FOR A POSITION IN AFRICA OR ASIA, AND I HAVE 30 YEARS WORKING IN THIS INDUSTRY.

Hinckley and Bosworth City Council UK. Construction Manager. June 2019 to March 2022.

Building Houses in Hinckley and Bosworth full control of the Houses going on.

C, R, J, D. Investments Company, Harare, Zimbabwe.

Construction Manager. Date Jan 2016 to May 2019.

I been out to Zimbabwe building 130 houses there and a small shopping Centre. This is dealing with the Constructors on the site as well as the Clients, and the Architects.

KHARIS MEGA INVESTMENTS LTD, ABUJA, NIGERIA.

Construction Project Manager. Date 03-02-2013 to 01.10.2015.

I have just completed a contract in Nigeria on the 01-September 2015. This was for a construction company in Abuja Nigeria, Building of 50 residential developments in Gundu Abuja on a raft foundation., of three buildings five story high each. My duties were to liaise with the Architect’s and clients and overseeing the project. I am looking for Accommodation, Mobil phone, laptop, Car, etc.

POWER FLEX, ZAMBIA, KITWE, ZAMBIA. GENERAL MANAGER. Date 07-01-11 to 08-02-13.

Direct control all departments of Power Flex, to establish all viable and profitable business i.e. construction, markets, etc. extensive knowledge of fixed and mobile plant crushers and batching plants on copper mine and using coal power from crushing plant .and the complete generator work for all the machinery and building which are being used. Key Achievement. Established effective cost control system resulting in a huge reduction in wastage and other inefficient practices. Outstanding negotiation skills resulted in driving profits.

BENTON BAU, NIGERIA PVT LTD, LAGOS, NIGERIA.

STRUCTURAL CONSTRUCTION SPECIALIST. Date 20-09-08 to 02-11-10.

Building of 12 store high rise and full control of the site, all health and safety matters on site, built on Rafts foundation, site meeting with architects and clients and overseeing construction of the structure, and all the facilities power plants, water, sewer systems and water disposal units etc. Key Achievement to make sure project was on time and profitable.

SEA BAY DEV.COY.LTD. Lekki Phase 1, Victoria Island, Lagos, Nigeria.

Contract Manager. Date 1-2-08 to 5-7-08.

Fabrication of jetty including all pilling structural steel work, liaising with architects, and clients.

Key Achievement. To make the Jetty was completed on time.

A A. Recruitment, Birmingham.Contract Manager. Date 03-04-06 to 28-01-08.

Day to day running off all 6 building sites around the Birmingham area on high rises, sorting out drawings, all men on site, curtain walling, ordering all site materials, Key Achievement. Making sure that all sites were running properly.

Cogim, S, P, A Rottofreno, Piacenza, Italy.

Contract Manager. Date 1st Sep 2005 to 2nd Jan 2007.

ARMY- CAMP IN (IRAQ) The day to day running of the company site, company men and sub-contractors on site, running 3 generators 2 on 1 off, also liaising on site with architects and clients, clarifying drawings and office work including Microsoft, word and project. Key Achievement. Making sure that the project run to design.

Construction Kaiser Limited, Nigeria. Site Manager. Date I3th Oct 2001 to 10th Aug 2005.

Duties included the day to day running of two sites (Banks) supervision of all men on site supervision of subcontractors on site, ordering all and chasing up all site materials, curtain walling, cladding,

generation, liaising with the architect on site, word.2000.and excel, or micro soft project, and make sure all site rules and records are up to date . Key Achievement making sure that the project was to the Architect design.

HARARE CONSTRUCTION JOBBING SERVICES, ZIMBABWE.

(M/D) Date January 1990 to Sep 2000.

This was a company owed my me (MD) which had 60 employees in it, I was doing work for CALTEX Services Stations all over the country which included demolitions and building the services stations all over the country from start to completion. This was building them and putting in the tanks etc., I was having site meeting with the Architects and make sure that the building was going to drawings, I run this company for about 10 years until I moved back to the UK. Quotations, buying materials, Wages, and running the company by myself and making sure that the company made a profit. This was running a small building company of over 60 employees.

International Construction, Zimbabwe. Contact Manager. Date 1987 to 1989.

Management and company workers as well as the sub- contractors on the site on High Rise building, plan and manage construction maintain site records, and to assist site quantity surveyor, cladding and curtain walling, generation, make sure all workmanship was to standards and to make sure the contract was profitable and completed on time. Word 2000. Excel Key Achievement. Making sure that high rises are completed on time.

Prestige Homes Harare, Zimbabwe. Contact Manager. Date 1983 to 1987.

Full control of running several housings and a flat site and a very large shopping complex in Harare called SAM LEVYS VILLAGE, building. Generation, roadways, drainage, curtain walling, cladding. Etc. Word 2000. Excel. Key Achievement.

Making sure that Sam Levy was happy with the work done.

Cementation Pvt Ltd Harare, Zimbabwe. Concrete General Foreman. Date 1980 to 1983.

Complete running of construction site, raising up dam wall as well as raising intake tower and install new intake pipes and new valves in the pumping stations, generation, etc., managing all the staff on site .and sub-contractors on the site, and the running of the batching plant. Key Achievement. Making sure the Dam wall was up and all pumping stations running. the sub-contractors on the site,

and the running of the batching plant. Key Achievement. Making sure the Dam wall was up and all pumping stations running.

RHODESIA corps of Engineers. Date 1980 to 1976.

Bomb disposal unit, light infantry.

British corps of Engineers. Date 1976 to 1964.

Solider 3 Para unit. Bomb disposal unit, light infantry. building Bridges.

Education and Qualifications. Loughton boys’ school, Loughton Essex.

Degree of Civil Engineering BSc. Oxford. 1972 to 1976.

Courses Microsoft Word, Project Management. HOLD FULL DRIVING LICENCE.