Post Job Free

Resume

Sign in

Mechanical Maintenance Project Management

Location:
Lucknow, Uttar Pradesh, India
Posted:
March 28, 2024

Contact this candidate

Resume:

VINOD KUMAR RAI

Mobile: +91-772*******,+91-895*******(Whatsapp)

E-Mail: ad4mmw@r.postjobfree.com,ad4mmw@r.postjobfree.com

Valid Passport No. Z5843622 Valid 2030.

OBJECTIVE

Seeking assignments in Modern Cement Plant

• Mechanical Maintenance • Erection & Commissioning • Project Management

SYNOPSIS

Degree in Mechanical Engineering with 33 years of experience in Mechanical Maintenance, Erection & Commissioning, Process Engineering & Improvement, Project and Plant Maintenance Management.

Recently working in Dangote Cement PLC,Nigeria as Head of Department Mechanical, Maintenance.

Adept in Managing Mechanical Maintenance Operations and taking cost-saving initiatives to optimize efficiency of machines and enhance productivity.

Skilled in managing erection, commissioning activities as well as operations and maintenance; conversant with diagnosing the faults, rectification, planning & scheduling.

Exposure in managing technically advanced state of the art Maintenance systems and methods.

Proficient in operations & maintenance of Cement processing industries.

Vertical Roller Mills of Loesche, Pfeiffer and OK Mill and UBE JAPAN Raw meal grinding 46.2+2, Cement grinding 56.3+3, Coal Mill 28.2 & Ball Mills, Hydraulic and Pneumatic Systems, FLSmidth make Kiln, Cooler & Preheater systems,LIMESTONE IMPACT CRUSHER OF MAKE HAZEMAG, GERMANY 1500TPH, Pumps, Gear Boxes, Bucket Elevator, Packing plant and Belt Conveyors Open & OLBC.

Process Engineering & Improvement

Executing cost saving techniques/measures, and modifications to achieve substantial reduction in O&M expenditures and work within the budget.

Maintaining and ensuring stringent adherence to quality standards, norms & practices, identifying gaps and taking corrective action.

Project Management

Handling activities involving working out various requirements & monitoring overall project operations for ensuring timely completion.

Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.

Monitoring the activity at sites & reviewing project schedule, ensuring cost control within budget and planning for cash flow requirements, etc.

Three Green Field Cement Plant 6000TPD Engineering, Successfully Erection and commissioned the and handed over to O&M.

Plant Management

Managing activities right from the conceptualization stage to the execution; involving finalization of technical specifications, procurement, scheduling, progress monitoring, erection & commissioning and manpower planning.

Establishing project review, monitoring and reporting status procedures to accurately report progress of the project to the end user clients.

Coordinating projects for the set up standards with accountability for strategic utilisation & deployment of available resources to achieve organisational objectives.

Maintenance Planning, Major shutdown planning, Departmental Budgeting, MTBF,RCA, MPR Cost Reduction etc.

Since DEC - 2018 Till Now –Feb.2024,

Working as HEAD OF MECHANICAL MAINTENANCE in Dangote Cement PLC, OKPELLA, Nigeria

Leadership and Team Management: Lead and manage the mechanical maintenance team, fostering a culture of collaboration, accountability, and continuous improvement.Provide guidance, mentorship, and training to develop a high-performance maintenance team.

Maintenance Strategy: Develop and implement a comprehensive mechanical maintenance strategy aligned with overall plant objectives. Establish preventive maintenance programs to minimize unplanned downtime and maximize equipment reliability.

Equipment Reliability: Oversee the maintenance of critical mechanical equipment, including crushers, mills, kilns, conveyors, and other plant machinery.Implement predictive maintenance techniques and condition monitoring to identify potential issues before they result in equipment failures.

Budgeting and Cost Control: Develop and manage the mechanical maintenance budget, ensuring cost-effective operations. Implement cost control measures without compromising on equipment reliability and performance.

Safety and Compliance: Uphold and enforce strict safety standards, ensuring compliance with relevant regulations and company policies. Conduct regular safety audits and implement corrective actions as necessary.

Continuous Improvement: Identify opportunities for process optimization and efficiency improvements within the mechanical maintenance department. Stay abreast of industry best practices and technological advancements to enhance plant performance.

JUNE 2014-NOV 2018 UCWL,RAJASTHAN

Head of Department Mechanical

Erection and Commissioning In-Charge of KILN, Raw Meal & Coal grinding sections

Reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for erection & commissioning of the plant.

Handling installation & commissioning of Kiln, Clinker Cooler,Cement Mill’s, Packing Plant, Coal Handling Plant and its auxiliary equipment’s also handling facilities for completing the projects in stipulated time and cost parameters. Upgrading, renovating & modifying the existing machinery, equipment & manufacturing facilities.

SEP 2011 – MAY 2014

AGM Cement Project Obajana Line-4,

Erection and Commissioning In-Charge of Cement Mill VRM, Kiln, IKN Clinker Cooler, Roto Packer(H&B),Auto Pack(Beumer).

Erection of Mechanical Equipment of Cement VRM Loesche LM56.3+3, H&B make ROTO PACKER,AUTO PACK(BEUMER) & Packing Plant accessories, Raw Mill VRM Pfeiffer MVR 6000 R, Coal Mill Pfeiffer 3350 and HAZEMAG make Impact Crusher 1500 TPH.

Erection of KILN,IKN COOLER

JULY 2008 - DEC 2011 (3 years) RAHINO CEMENT,KENYA.

Detailed Engineering, Procurement, Erection and Successful commissioned Grinding Unit.

Handling Fabrication and erection of Structural.

Project and Commissioning done within the schedule for both the Projects and got the appreciation from the Top Management.

SEP 2004- MAY 2008 (4.5 years)Working as Mechanical Head in Heidelberg Cement Ltd, Madhya Pradesh.

Identifying areas of obstruction or breakdowns and taking steps to rectify the equipment through application of troubleshooting tools.

Scheduling and planning predictive, preventive maintenance for process plants, and root cause analysis including budgeting and cost control activities.

Strategic Planning: Develop and Implement maintenance strategies and plans to optimize the reliability and performance of Mechanical equipment and systems. This includes long term planning and Budgeting for Maintenance activities.

Maintenance Scheduling: Create and manage maintenance schedules to minimize downtime and production disruptions while ensuring that maintenance tasks are performed at appropriate intervals.

Team Management: Oversee and lead a Team of maintenance professionals, including mechanical, technicians and Engineers. This includes setting performance goals, conducting performance evaluations, and providing coaching and Mentorship.

Equipment Inspection: Regularly inspect and assess the condition of Mechanical equipment to identify issues or potential problems. Develop procedures for inspections and audits to ensure compliance with safety and maintenance standards.

Budget Management: Develop and manage the maintenance budget, allocating resources efficiently to meet maintenance goals .Monitor expenses, control costs and seek opportunities for cost savings.

Vendor and Supplier Management: coordinate with external service providers, suppliers and contractors for specialized maintenance tasks. Evaluate vendor performance and negotiate contacts.

Asset Management: Maintain records and documentation of all mechanical equipment, including its history, maintenance and performance implement asset management strategies to extend the lifespan of equipment.

Emergency Response: Develop and Implement emergency response plans for unexpected equipment Failures or breakdowns .Ensure quick and effective responses to minimize disruptions.

Continuous Improvement: Continuously assess and improve maintenance processes and Procedures to enhance equipment reliability and efficiency. Identify Opportunities for automation and predictive maintenance.

Training and Development: Provide training and development opportunities for maintenance staff to enhance their skills and knowledge.

Communication: Collaborate with other departments, such as operations and Engineering to ensure seamless integration of maintenance activities with overall organizational goals. Communicate maintenance status and issues to senior management.

Documentation: Maintain detailed records of all maintenance activities, equipment specifications and maintenance history. This documentation is essential for auditing and regulatory compliance.

AUG 1991 – JUN 2004 (13 years)

Working at various positions as Graduate Engineer Trainee to Deputy Manager in J. K. Udaipur Cement Limited, Rajasthan.

As a Section In charge in Kiln, VRM, and Utilities Material Handling System etc.

Frequent failures of Classifier dynamic blades prevented by introducing additional fixing arrangements and retainer arrangement.

Air slides problems overcame by incorporating individual air chambers for every chambers.

Coal Mill LM28.2 Feeding system Paddle Conveyor replaced with Rotary Air Lock there by benefiting enormous energy saving by avoiding false Air entry into all the feeding equipment’s of the Mill.

Modification of Coal Mill water spray system & Mill Feeding for the grinding of Pet coke.

Reliability of the equipment increases by making necessary modifications in Linear Stacker & Re-claimer and Coal Transport System.

Optimization of Vertical Raw Mill.

Electrical Energy conservation improved through arresting false air in the Mill grinding systems and Kiln & Preheater systems and Compressed Air usage optimisation.

ACADEMIA

1987 -91 BE Degree in Mechanical Engineering, Passed in I-st Class from Government Engineering College,Gulbarga, KARANATAKA

2015-16 MBA from NIBM, Chennai

TRAINING COURSES

Developing supervisory skills by Trichy productivity council.

Kiln Alignment,RTC, Nembhera,RAJASTHAN

Clinker Cooler Optimization..

Developing Communication and Interpersonal skills.

Present Scenario in Plant Maintenance Management techniques.

RCM Techniques.

Safe working practices in Cement Industries.

Optimization of Roto Packer.

5’s House Keeping Techniques.

IT SKILLS

Package : MS Office.

ERP : SAP Champion.

PERSONAL DOSSIER

Date of Birth : 08th April 1969.

Present Address : H.NO:194,Manas City, Indira Nagar, LUCKNOW-226016

UTTAR PRADESH,INDIA

Languages : English and Hindi.

Declaration

I hereby declare that the above written particulars are true to the best of my knowledge and belief.

VINOD KUMAR RAILucknow, India

Date: 20/03/2024

Plant Operations

Maintenance

Erection & Commissioning

Project Management



Contact this candidate