PAUL HARDEN
**** ******** ** · 443-***-****
ad4mb0@r.postjobfree.com
Seasoned professional seeking a master scheduling and production planning opportunity in a manufacturing environment, where my skill sets will provide a positive impact on a growing organization.
EXPERIENCE
NOV.2022- CURRENT
PRODUCTION PLANNER/ INVENTORY CONTROL, ANTENNA RESEARCH ASSOCIATES
. PLANNER OF ALL PRODUCTION OF MICROWAVE ANTENNAS
. REVIEW DRAWINGS AND SEND UP REQUIREMENTS TO PURCHASING
. PROCESS OF MANAGER GOVERNMENT PROJECTS
. INVENTORY CONTROL / WORK WITH STOCK ROOM
JAN 2019 – NOV. 2022
ASST WAREHOUSE MANAGER / INVENTORY CONTROL, Tenax
Uses MRP (Material Report Programming) to track parts and create reports
Controls inventory levels by conducting physical counts; reconciling with data storage system.
Ensures product stock is adequate for all distribution channels and can cover direct demand from customers
Evaluate suppliers to achieve cost-effective deals and maintain trust relationships
Manages all aspects of shipping
APRIL 2018 – JAN 2019
INVENTORY/ SHIPPING COORDINATOR, t-ROWE PRICE
Communicated with clients and shippers and resolve any complaints.
Prepared shipping quotes for customers.
Negotiated shipping fees with couriers.
Prepared sales reports for senior management.
November 2015 – January 2018
LOGISTICS SUPERVISOR / INVENTORY MANAGER LOCKE INSULATOR
Managed all aspects of shipping
Managed all inventory and cycle counts
Organized shipping parts in Excel by due dates for prompt and well-
coordinated shipments
Used MRP (Material Report Programming) to track parts and create reports
Kept a meticulous record of shipment information.
MAY 2008 – JULY 2015
ELLICOTT DREDGE LLC, PRODUCTION CONTROL SUPERVISOR
Built dredges sold internationally
Coordinated all operations from release of work orders; solved all material issues, completed building of all assemblies that are placed on all dredges
Caught and corrected all mistakes by planning department
Maintained inventory of raw materials
Closed off all assemblies
Assisted engineering department with issues during the build cycle
Coordinated with all departments to see that all schedules are made and shortages are addressed
Track all relative ECN’s and see that they are addressed
Updated Profit Key ( MRP System) as to the timely loading of all machined parts by due dates
MARCH 2006 – APRIL 2008
MERCHANT TERMINAL CORPORATION, WAREHOUSE SUPERVISOR
Strategically managed warehouse in compliance with company’s policies and vision
Oversaw receiving, warehousing, distribution and maintenance operations
Setup layout and ensure efficient space utilization
Initiated, coordinated and enforced optimal operational policies and procedures
Adhere to all warehousing, handling and shipping legislation requirements
Maintained standards of health and safety, hygiene and security
Managed stock control and reconcile with data storage system
FEB 2005 – FEB 2006
MAINES PAPER AND FOOD DISTRIBUTION, INVENTORY CONTROLLER
Managed stock control and reconcile with data storage system
Managed all aspects of shipping
Managed all inventory and cycle counts
MARCH 2004– FEB 2005
GENCO DISTRIBUTION SYSTEM, WAREHOUSE SUPERVISOR
Directed employees as to what products are to be shipped
Ensured that products were on the preferred method of transportation
Shipped 25 to 30 Trucks daily
MARCH 2002– MARCH 2004
HMS HOST INC, assistant warehouse manager
Operated food, beverage and retail concessions in airport and toll road locations
Directed employees as to what products frozen or unfrozen are shipped to the 30 stores
located in BWI Airport
Coordinated all orders from release to shipping by way of company trucks to all locations
FEB 2001 – JAN 2002
PULSE SPECIALITY COMPONENTS, production control manager
Coordinated all orders from releasing to shipping
Controlled yield losses
Oversaw completion of all issues related to products that have to be approved by government inspectors.
Created and scheduled orders for satellite locations in China and Mexico.
Inventory management
Cycle counts
Reduced inventory level from $300,000 to $50,000 within a 6 month period
Changed production style of 100 parts to a just in time style of production, turning
inventory from a 90 day cycle to a 30 day cycle
MARCH 1998 – JAN 2001
ELLICOT MACHINE CORPORATION, Production planner/ master scheduler
Released manufacturing orders and checked for accuracy of engineering releases
Closed, scheduled and reported all orders for shipment
Blueprint experience
Reviewed and coordinated all work center production of all machined parts
EDUCATION
HIGH SCHOOL DIPLOMA, bALTIMORE POLYTECHNIC INSTITUTE
AAS, COMMUNITY COLLEGE OF BALTIMORE CITY
It’s okay to brag about your GPA, awards, and honors. Feel free to summarize your coursework too.
SKILLS
Microsoft Word
Profecient in Excel/ MRP Lotus
Syteline Symix Software System
Profit Key Software System (MRP)
Powerview Software System
Citrix ICA
Telesis (MRP)
Inventory Control