Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Posted:
March 26, 2024

Contact this candidate

Resume:

EMMANUEL ADDO

+233-*********/020******* ad4k8q@r.postjobfree.com Accra- Ghana

PROFESSIONAL SUMMARY

A Certified Electrical Engineer with over 5 years of experience in oil and gas, manufacturing, and engineering. I have a demonstrated history of optimizing processes, managing electrical installations, troubleshooting, and maintenance. My ability to excel in demanding environments is supported by a wide-ranging technical skill set. Leveraging my electrical engineering knowledge to address interdisciplinary engineering challenges. KEY SKILLS

Project Management Equipment Repairs Quality Controlling Troubleshooting Electrical and Circuit Design Electrical Installation& Wiring Electrical Engineering Software Vendor Management Safety Compliance Innovative skills Organization Skills Critical Thinker

WORK EXPERIENCE

NOV 2021 - PRESENT QUANTUM TERMINALS PLC

ELECTIRCAL MAINTENANCE OFFICER

• Spearheaded a supplier performance evaluation project, implementing a data-driven approach and utilizing key metrics such as on-time delivery, quality, and customer satisfaction; resulted in a 25% improvement in supplier performance and a 20% reduction in supply chain costs.

• Re-installed Endress and Hauser Promass 83F flowmeters leading to a reduction in production and increased improvement in measurement accuracy post-reinstallation.

• Implemented a comprehensive monitoring system for tank levels, resulting in a 50% decrease in errors and deviations; saved 2 hours per week during Endress and Hauser tank side monitor configuration process.

• Tracked the decrease in downtime attributed to the restored 800kVA out-of-service transformer and measured improvements in the transformer's energy efficiency.

• commissioned a 100kVA Perkins generator, ensuring seamless integration with existing power infrastructure and uninterrupted operations throughout the facility, resulting in significant cost savings and increased operational efficiency.

• Influenced the installation and commissioning of 83kW grid-tied solar system:

• Monitored and measured power output from the solar system, resulting in a 50% reduction in reliance on the main power grid, reducing energy expenses for the company.

• Installed a central automatic transfer switch (ATS) for the facility to ensure reliable power supply.

• Orchestrated the restructuring and rescheduling of the company's equipment inspections checklists, introducing a more efficient workflow that reduced backlog by 50% and improved overall inspection completion time by 25%.

• Proposed and replaced high consuming lighting fixtures with LED fixtures to cut down power consumption.

• Carried out inspections and other preventive and corrective maintenance activities on equipment.

• Identified maintenance strategies based on historical data analysis, reducing the number of unexpected breakdowns by 30% and extending equipment lifespan by an average of 15%. NOV 2020 - OCT 2021 ACCRA BREWERY LIMITED

PROCESS OPERATOR

• Reduced equipment downtime by an average of 20% through timely repairs.

• Continued a 99% adherence to standard operating procedures, ensuring efficient production.

• Responded to alarms within 1 minute on average, minimizing production disruptions, troubleshot, and cleared 90% of faults without technician intervention.

• Recorded and reported an average of 5 maintenance activities per shift, contributing to a well- documented equipment history.

• Maintained a 100% accurate inventory of tools and materials, preventing production delays.

• Achieved a 98% product conformity rate by closely monitoring inputs and outputs.

• Finalized an average of 40 hours of training per year, enhancing skills and knowledge. JUN 2015 - AUG 2018 BEN K ELECTRICAL WORKS (CONTRACTOR AT ECG MAMPONG AKUAPEM) ASSISTANT ELECTRICAL ENGINEER

• Led a team of 10 individuals for prepaid meter replacement and installations ensuring project completion ahead of schedule by 15%.

• Administered and completed 5 electricity extension projects, increasing electrical coverage in the local area by 20%.

• Ensured 100% adherence to set standards and work schedules by field workers.

• Repaired and restored functionality to 95% of malfunctioning equipment, minimizing downtime, and increasing operational efficiency by 40%.

• Accomplished 50 domestic and commercial electrical installations, meeting safety and quality standards.

• Managed procurement processes, resulting in a 10% cost reduction in electrical item purchases.

• Reduced inventory waste by 15% through effective management practices. EDUCATION

2014 - 2018 KWAME NKRUMAH UNIVERSITY OF SCIENCE & TECHNOLOGY BSC. ELECTICAL & ELECTRONIC ENGINEERING

PROFESSIONAL ASSOCIATION/MEMBERSHIP

• Member, Ghana Institution of Engineering (Professional Engineer).

• Member, International Association of Engineers (IAENG). REFERENCE

Available upon request



Contact this candidate