Post Job Free

Resume

Sign in

Start Up Project Manager

Location:
Bucharest, Romania
Salary:
5600 Euro
Posted:
March 22, 2024

Contact this candidate

Resume:

Curriculum Vitae

Personal Details

Name: MICU

Surname: GHEORGHE

Date / Place of Birth: 17.09.1978 BUCHAREST.ROMANIA

Nationality: ROMANIAN

Marital Status: MARRIED

Address: St. Florin Ciungan#3. BL67. flat #15. District 3 - Bucharest

I have - Covid 19 vaccine certificate.

Mobile: +4-076*-***-*** - ROMANIA

E-mail: ad4h3z@r.postjobfree.com ad4h3z@r.postjobfree.com

Executive Summary

A skilled engineer with 27 years of experience in performing commissioning and operation in steam & gas turbines, boilers, start-up, shutdown, performance test.

rotating equipment, compressors, pumps, heat exchangers etc.

Pre-commissioning, and erection procedures. Process & BOP.

Excellent interpersonal, communication, presentation & facilitation skills especially with the customers and project engineer teams.

Excellent team leadership and team building skills.

Project Manager - Diploma

Career Objective

Secure a challenging technical position where in my team player attributes, experience, and communication skills can be utilized in obtaining personal career goals and those of the employer.

To advance technically in the science of Plants facilities and contribute to industry by participation as a skilled Operation Manager – Commissioning Manager

Bio Data Dominican Republic - Iraq – France – Belgium - Denmark

Countries Worked In: Romania - Libya - Panama - Chile - Saudi Arabia

Countries Lived in: Romania

Foreign Languages: English (Good reading, writing, and speaking)

Spanish (Good reading, writing, and speaking)

WORK EXPERIENCE:

Period: February 2023– up to date

COMPANY: Spie

LOCATION: Denmark - Offshore

PROJECT: HalfDan B & A – Oil & Gas Platform

POSITION: Gas Turbine Coordinator

2 GTG X 8MW Solar Taurus 70 / Solar Turbines Titan 130 IP/HP Gas Compressor

2 GTG X 4.6 MW Solar Centaur 50 / Solar Turbines Titan 130 IP/HP Gas Comp.

Distributed Control Systems Siemens TT4000, Power Management System and distribution.

Responsible for Process Operation start-up & shutdown of Gas Turbines

Responsible for the safe, proper, and efficient operation of all machinery and related equipment

Diagnose equipment problems, report abnormal conditions to management, and prepare detailed work requests for plant defects.

Inspect plant and equipment, including carrying out scheduled plant checks, and prepare necessary reports and log entries; ensure maintenance requests are completed to a satisfactory standard; assist in planning, organizing, and executing unit outages for inspections, overhauls, repairs, and cleaning.

Assist with preparation and administration of Operations, Maintenance, and HS&E procedures and reports. Maintain accurate records while monitoring and maintaining Plant equipment and systems.

Monitoring of process engineering software systems. HMI, PLC.

Opening Permit to Work, Toolbox Talks, final checks, and hazard identification.

Period: November 2021– August 2022

COMPANY: Elecnor

LOCATION: Belgium

PROJECT: Biomass Fuelled Power Plant, Ghent

POSITION: Control Room Shift Supervisor

Biomass Power Plant - 21MW - Distributed Control Systems T3000

Duties and responsibilities:

Coordinate activities of the Commissioning and Operation Team.

Responsible for supervising and operating process activities and tests.

Evaluating processes and equipment to ensure compliance with environmental and safety regulations. Prepare and write daily report.

Ensure the performance and record keeping of required daily plant activities.

Perform all the process testing automation and all systems, As:

Trial Run I & II, Performance Test, Availability and Enthalpies Test, etc.

Monitor systems to ensure proper operations, perform routine equipment safety checks and inspections, Commissioning activities on Boiler, Turbine, ACC, Fuel Handling, Dry Ash & Fly Ash, Furnace, and Combustion Air Distribution Systems

Work in the control room and operate the Distributed Control Systems T3000

Period: May 2021 – November 2021

COMPANY: SIEMENS

LOCATION: France

PROJECT: CCPP Landivisiau

POSITION: Commissioning Shift Charge Engineer

1 Unit - 446MW Landivisiau Power Plant - Combined-Cycle

SGT5-4000F Gas Turbine, a SST5-3000 Steam Turbine, a SGen5-2000H Generator, a Heat-Recovery Steam Generator (HRSG), and a SPPA-T3000 Control System.

Duties and responsibilities:

Fully in charge of power plant Commissioning and Operations for duration of duty period, shift from Control Room,

Responsible for Process Operation start-up & shutdown of Plant and all associated auxiliaries as well, coordinating the field and troubleshooting. Execute a power plant test program based on the contractual requirements of the project.

Responsible for overall plant operation activities in shift. Ensure that all the activities in the plant are performed in a safe and efficient manner in accordance with the approved Standard Operating Procedures, quality standards, time schedules, and other operating requirements.

Coordinate with all other departments all activities that are related to plant operations during the shift and comply with safety rules and regulations.

Write a daily report.

Period: May 2018 – May 2020

COMPANY: Tecnimont S.p.A.

LOCATION: Dominican Republic

PROJECT: Punta Catalina Power Plant Project

POSITION: Commissioning Shift Supervisor

2 x 375 MW Coal Fired Power Plant

GE Turbine 375MW – Boiler Babcock & Wilcox 1200 t/h – 172bar

SPPA-T3000 Control System - Mark VI GE.

Duties and responsibilities:

Responsible for Process Operation start-up & shutdown of Power Plant and all associated auxiliaries as well, coordinating the commissioning and operations team, troubleshooting and normal function, execute a plant test program based on the contractual requirements of the project Commissioning and Start-up. Tests. Organize and Manage the DCS Operators and Field Operators of the assigned team by controlling their job and the implementation of Plant Safety procedures in case of emergency. Participate end responsible for all Pre-commissioning and Commissioning activities all Process Test:: Pumps Functionally, Boiler Blow-Down, Mill Auto Mode, Boiler Master Controller, Boiler Follow Mode Efficiency Test, Performance Test, Reliability Run Test, Load Rejection and Island Mode Test, Enthalpy Drop Test, Overloud Turbine Generator, Overspeed Turbine Test, Synchronized, Turbine Flow. LP&HP Heaters Auto Mod Test, etc

Optimizes process by designing, implementing, and testing new procedures. Check logic controls and interlock; troubleshooting; tuning; Loop checking.

Period: March 2017 – May 2018

COMPANY: First Quantum

LOCATION: Panama

PROJECT: PACO POWER PLANT PROJECT

POSITION: Commissioning Start-up Operation Engineer

2 x 150 MW Coal Fired Power Plant in Panama

2 x 150 MW – SKODA Turbine & Boiler t/h 451 - Hansol SeenTec

Duties and responsibilities:

Manage and Lead Commissioning and Operations Group.

Assesses compliance with applicable safety and quality standards.

Contributes to departmental efforts by accomplishing related tasks as needed.

Involved in turnover check and Quality business process engineering.

* Ensure a safe and efficient start up and commissioning of the entire plant.

* Coordinate commissioning operations personnel in support of start-up activities as requested.

* As start-up work progresses assume operational responsibility for systems as they are brought online and placed in normal operation. Check, monitor and adjust where necessary.

* Take overall responsibility for the operation of all plant equipment. Review and test commissioning operational procedures and good industry practices to help ensure that the highest possible levels of safety, availability and reliable output are maintained by the power plant facility.

* Assist and provide hands-on training to the operations personnel.

* Monitor plant equipment and operations personnel performance daily.

Involved in pre-commissioning and commissioning activities: flushing/blowing, leak test, check and verify all the turnover after construction, punch list and data sheets. piping components and local instruments. Functional Test of all equipment’s, compressors, pumps, rotating equipment, compressors, heat exchangers, Boiler Blow-Down, Turbine Synchronization, Fuel and Gas system test, Pulverizes Test, LP & HP Test, BFP & CEP System. Performance Test, Reliability Test etc.

Water Treatment Plant, Desalination Plants Units,

Commissioning & Operation DCS activities as: Check logic controls and interlock.

troubleshooting; tuning; Loop checking; DCS Delta – Emerson on Utilities,

DCS - Ovation Distributed Control System – Emerson on Boiler & Steam Turbine

Responsible for Process Operation start-up & shutdown of Plant and all associated auxiliaries as well, coordinating the operations team and troubleshooting. Execute a power plant test program based on the contractual requirements of the project. Issues PTW (permits to work) and responsible for the safety condition to workplace also check the safe conditions for maintenance teams before issuing the Permit to Work. Issues, Log Out, Tag Out procedures for LOTO Officer.

Period: March 2015 – March 2017

COMPANY: BONATTI

LOCATION: Iraq

PROJECT: WEST QURNA 2

POSITION: Process Board Operator

Distributed Control Systems - Mark VI GE

DCS Operations Power Plant of GE Gas Turbine 3X42MW

Simple Cycle Power Generation Plant and Power Distribution. GIS switchgear.

Fully responsible of power plant operations during duty shift period. Manage and lead Operations Shift Group. Responsible for, Start-up, Shut-down, Troubleshooting, Emergency Situations & load of 3 GTG General Electric – 3x42 MW DCS Mark VI

Three Fuel Gas Compressor Cameron (FGC) - 18000 kg/h Gas - DCS Delta V

All utilities in service. Demi Plant - Demi Water System, RAW WATER System.

Air Compressors System, Diesel System, Fire Fighting System. Nitrogen System

Fuel & Gas detectors System on MOS (Maintenance Override Switch).

Power Management System (PMS) - Siemens DCS,132 kV, 33kV,11kV,6.6 kV.

Black Start Diesel Generator, Load Shedding System.

Period: March 2014 – January 2015

COMPANY: Saudi Aramco, Jal International

LOCATION: Saudi Arabia

POSITION: Industrial Operations Skill Trainer I - Saudi Aramco ITC

Jeddah Industrial Training Center

Process, BOP and Operation. Fallow P&ID - P&FD, Start-up, Shut-down, Refinery, Oil & Gas Plant. Power Plant, HYDROCARBON FRACTIONATION, NATURAL GAS FRACTIONATION & PROCESSES, CRUDE OIL FRACTIONATION DISTILLATION, LIGHTER LIQUID HYDROCARBONS, DISTILLATION COLUMN, DESCRIBE HYDROCRACKING CRACKING & REFORMIN, (PMS) Power Management System

Describe Plant Safety Hazards and Protection, Describe Plant Safety Equipment.

DESCRIBE ROTATING EQUIPMENT, STEAM TURBINE ENGINE & GAS Turbine Engines, DIESEL ENGINES, CLOSED LUBRICATION SYSTEM, CENTRIFUGAL PUMPS, ROTARY PUMPS, RECIPROCATING PUMPS, Pumps & Pump Operation, CENTRIFUGAL COMPRESSORS, RECIPROCATING COMPRESSORS, Axial Compressors. - Describe the Operation of Valves. Describe Tanks, Vessels and Columns, Refinery Columns, DISTILLATION Column PROCESS, RERUN COLUMNS, VACUUM COLUMNS, STRIPPING COLUMNS, FURNACES, MAJOR PARTS AND THEIR FUNCTION, BOILERS, MAJOR PARTS OF A FIN-FAN COOLER AND ITS OPERATION, COOLING TOWERS, Heat Exchangers,

PFD’S (PROCESS FLOW DIAGRAMS), PROCESS FLOW DIAGRAM SYMBOLS, TRACE PRODUCT FLOW THROUGH THE PROCESS, PFD : BUTANE TANK VAPOR RECOVERY, IDENTIFY P&ID SYMBOLS & ABBREVIATIONS, (PIPING & INSTRUMENT DIAGRAMS ),EXAMPLES OF INSTRUMENT IDENTIFICATION, OPERATION AND FUNCTION, IDENTIFY COMPONENT SETTINGS AND LIMITS, PROCESS FLOW ON P&ID’s, BASIC CONTROL LOOP INSTRUMENTS,COMPONENTS & FUNCTION OF A CONTROL LOOP,

Process Simulator, use basic Process Control Loops whit operate similar to those in: Refineries’, Oil & Gas Plant, Power Plant, Bulk Plants, Terminals etc.

Period: April 2011 – November 2012

COMPANY: Tecnimont S.p.A.

LOCATION: Chile

PROJECT: Bocamina II Project, Coal - Fired POWER PLANT

POSITION: Commissioning DCS Operator

350MW - GE Turbine & Boiler SES Tlmace 1200 t/h

Distributed Control Systems – Foxboro – Mark VI GE

Desk Operator at Coal Fired stations.SES Tlmace Boiler 1200 t/h x 350MW Steam Turbine General Electric units with biomass additional firing FGD & Fabric Filters. Responsible for Process Operation start-up & shutdown of Plant and all associated auxiliaries as well, coordinating the field operations and troubleshooting. Execute a power plant test program based on the contractual requirements of the project.

Invensys Coal Fired Boiler DCS Foxboro– Mark VI GE Steam Turbine DCS-DCS DeltaV

Responsible for all tests included Boiler Operation and Steam Turbine Operation as :

Steam Turbine: Efficiency Test, Reliability Run Test, Performance Test, Load Rejection and Island Mode Test, Enthalpy Drop Test, Overloud Turbine Generator, Overspeed Turbine Test, Synchronized, Turbine Forward Flow, Turbine Follow Modemed.

Boiler: Boiler Coal Firing – To reach 100% of load burning coal.530 C-172bar

Automatic Boiler Stabilization – coal & diesel oil firing control system

ZGM113 Mill load - 1600 kN (Static Load) / 4800 kN (Dynamic Load)

start-up & emergency shutdown/ functional testing of, Mill Auto Mode, Boiler Master Controller, Boiler Follow Mode Circulating Boiler Pumps Air & Flue Gas System/FDF/IDF/PF&RAH.SAH all in normal operation. Coal Handing & Silo, Bottom Ash System, Flay Ash & pout the FGD & Fabric Filters in Service.

BOP: putting into operation all BOP systems as Power Plant normal operation 1200t/h x 350MW, Master Controller Fallow, LP&HP Heaters Auto Mod Test, Vacuum System/Condenser & LP/HP Bypass. Auxiliary Steam & Gland Sealing.

Condensate Recovery System, CEP System/Deaerator/BFP & Boiler Feed Water

IA/PA compressor unit and Air dryer system, Sea Water System.

Sea Water Intake & Filtration System, Hypochlorite System. Fire Fighting System, Closed Cooling Water System, Demineralized Water Unit, All storage tanks.

RAW WATER System, Demi Water System, Wastewater Treatment Unit

And all utilities system and Demi Plant.etc

Responsible for all Commissioning Operation project program:

Mil start-up, First COAL on Boiler, First Synchrotron STG, Steam Turbine Synchronization – start with the rolling of the steam turbine and synchronization of the plant with the national grid.

First Steam to Turbine, Bypass Operation Test, Condenser Vacuum Test

Steam Blowing: following next steps of the plant commissioning starting with the Steam Blowing Piping as: Main Steam Piping System, Hot Reheat Piping system, Cold Reheat Piping system, Auxiliary Steam Piping, HP Bypass Valve, Extraction Steam piping system for HP Heaters, Extraction Steam piping system for LP Heaters, Clean Drain System, Process drains & vents HP Turbine, IP Turbine, LP Turbine, Condensing System, Steam Turbine by-pass System

Steam Generator Blow-Down (Boiler Blow-Down) Boiler Dry Out, Boiler First Firing, Boiler Leak Test, Boiler Preservation, Boiler - Chemical Cleaning, Permanent Energization

First Energization - Back-up transformer.

POSITION: Commissioning Shift Supervisor - Coal Fired POWER PLANT

In the period September 2011 – January 2012, I worked as a replacement - Commissioning Shift Supervisor :Responsible for all Commissioning activities flushing/blowing, reinstatement of piping components and local instruments, leak test, motor run, machinery run, static equipment inspections, cleaning, internals installations, box-up according whit the procedures, in conformity with the safety rules and the instructions of Commissioning Manager .Fully responsible for the Operations of Power Plant during duty shift periods, coordinating the DCS Operator and all the Field Operators. Issues PTW (permits to work) and responsible for the safety condition to workplace also check the safe conditions for maintenance teams before issuing the Permit to Work. Log Out, Tag Out procedures LOTO Officer.

Period: Aug 2010 – November 2010

COMPANY: SADELMI S.p.A. Busi Power

LOCATION: Panama

PROJECT: Bahia Las Minas Repowering Project, Coal-Fired POWER PLANT

POSITION: Commissioning Operator Shift in Charge

Summary:

Reporting to Power Plant Project Manager and Commissioning Manager, fully responsible for the Operations of Power Plant during duty shift periods.

Responsibilities:

Fully in charge of power plant operations for duration of duty period Manage and lead Operations Shift Group

In conjunction with the Operations Superintendent ensuring the safe, reliable, environmentally, and commercially efficient operation of the plant.

Proactively promote the continuous development of Operations Shift Group technical knowledge and competencies during the mobilization, commissioning, and operational phases of the power plant.

Responsible for load Ansaldo Coal Boiler BMCR 500t/h. 95bar. 516 C – Alstom Mills - DCS Symphony 7 ABB

Responsible for load of 3 STG – 46 MW, 91 bar MAIN STEAM, 120 flow – per STG. Implement the preparation for BOP & Auxiliaries, signals check to DCS, interlocks test. Boiler Start up & Turbine synchronized until 30% of load (permissive condition to start coal firing) Alstom SM 18/11 Bowl Mills with static classifier 23t/h. Instrument &signals to DCS check interlocks, manual & auto start/shut down by sequence. Boiler starting and testing with mixed firing,15% up to 100% of mill load. Mixed firing and transfer from liquid fuel to coal fuel,3 mills in service. Running interlock manual & sequence test for mills at minimal load. Full mills load testing & measurements.

Adjusting the parameters of equipment’s, testing, and adjusting the parameters of process control according with logic description &diagram in collaboration with DCS software engineers for BPS, BMS, Plant Coordinator system 3 modes (Turbine follow, Boiler Follow, Coordinate), etc.

Period: Mar 2010 – Aug 2010

COMPANY: SADELMI S.p.A. Busi Power

LOCATION: Panama

PROJECT: Bahia Las Minas Repowering Project, Coal-Fired POWER PLANT

POSITION: Commissioning Control Room Operator

3 X 46 MW GE Turbine

Ansaldo Coal Boiler BMCR 500t/h. 95bar. 516 C – Alstom Mills - DCS ABB.

Check logic controls and interlock according logic diagram and modification.

Check all logic controls and interlock from DCS.

Confirm correct function of the system .Test for Protocol-Box-up : Air Compressors, Cooling Water Pumps,Light Oil System Pumps, .BFP, Burners, ID Fan, FD Fan, Primary Fan, Sealing Fan – Mills, Flame Detector Cooling Fan, Coal Mills, Coal Feeder,lubrication and cooling pumps Mills system, Hydraulic Pumps Mills System. Coal Handing, Bottom Ash System, screw, chain & rubber conveyors, Over belt Electro Magnetic Separator, Dedusting System,Flay Ash System, Electro Precipitator System. Cooling Water Pumps for Webcam. Steam Air Heater, Dumpers Test %. All Control Valves Test %.

Dynamic effects during Blowing out. Boiler Start up for Blow Out procedure several times according to the plate test result. Boiler Preservation, Start-up and Shut-down Boiler procedure. DCS Symphony 7 ABB Coal Fired Plant

Boiler Start up with Light Fuel Oil firing in manual mode by sequence step by step. Shift operation coordinator & training the client’s DCS & Field Operators step by step according with the project planning.

Period: Feb 2009 – 2010 Feb

Position: Turbine Board Operator

Company & Location: BONATTI - DIETSMANN; Mellitah Gas Plant - Libya

Responsibilities:

-WORKING AS A SHIFT INCHARGE ON STEAM TURBINE, Verta-Pro DCS; DCS DeltaV

Operating three Steam Turbine Nuovo Pignone: 25 MW - capacity of 270 t/h – 41 BAR – 345 ‘C MAIN STEAM; OUTLET STEAM FLOW 270 T/H – 6 BAR – 158 ‘C. Verta-Pro DCS

Ensuring the start up operations for the steam turbine s block after shutdown for repairing or accidental breakdown. Through knowledge of the start up and shut down procedures in normal and emergency situations. Ensuring the good functionality of the auxiliary installations: feed water, fuel, steam units, etc. Controlling, during the shift, the entire plant, checking status of the equipment, adjusting process parameters according to the products quality. Start up designated equipment items to achieve normal operating conditions, receiving instructions from shift supervisor to perform field tasks. Regularly patrolling work area, observing operation and performing routine and non-routine checks, inspections, instrument readings, watching for irregularities such as leaks. Monitoring rotating machinery, regularly checking bearing temperatures, vibrations, lubrication, and noting standby machines in operation, reporting and correcting abnormal startup and operating conditions to prevent damage to equipment.

Period: 2007 FEB – 2009 FEB

Position: Turbine Control room operator

Company & Location: BUCHAREST - SOUTH POWER PLANT - ROMANIA

Responsibilities: at Oil & Gas Fired Plant

Monitoring and recording the operating parameters, follow the normal operating procedures FOR SKODA STEAM TURBINE 125 MW, 140 BAR, 530' C MAIN STEAM,25 BAR HOT REHEATER,530 TEMP,-0.8 CONSENSSER VACC -DOING START UP & SHUT DOWN TURBINE OPERATIONS FROM CONTROL DCS ( Ovation-Power plant DCS),MAINTAINING PARAMETERS FOR GOOD OPERATION TURBINE IN LOAD, FOR ALL EQUIPMENTS IN SERVICE AND STAND BY.SUPORT all emergency situations.

Period: 1996 DEC-2008 JUN

Position: Commissioning Turbine Operator

PROJECT: REVAMPING/REENGINEERING

Company & Location BUCHAREST - SOUTH POWER PLANT- ROMANIA

Responsibilities:

1996-2008 – DURING THE SUMMER, I ALSO WORKED AS DETACHED IN CAPITAL MAINTENANCE & REVAMPING/REENGINEERING, ACHIEVING EXPERINCE IN MECHANICAL, MAINTENANCE, PRE-COMMISSIONING, COMMISSIONING, STARTUP, AND OPERATION IN POWER PLANT FACILITIES: Involved in pre-commissioning, commissioning, startup in power plant equipment’s.

Period: 1996 DEC-2007 FEB

Position Turbine Operator

Company & Location BUCHAREST - SOUTH POWER PLANT- ROMANIA

Responsibilities:

OPERATOR FOR - STEAM TURBINE SIDE TYPE SKODA 125 MW - 140 BAR - 530' C MAIN STEAM,25 BAR HOT REHEATER,530 TEMP, -0.8 CONSENSSER VACC,

DAILY ROUTINE CHECK AND READINGS OF EQUIPMENT FUNCTIONING AND STAND-BY, LIKE- Boiler feed pump (BFP), CONDESSATE EXTRACTIONS PUMPS, COOLING WATER PUMP, CONDENSSER VACUM PUMPS &GLAND STEAM SEALING, HP & LP STEAM BY-PASS VALVES, ALL AUXILIARES EQUIPMENTS.

TRAINING: BUCHAREST SOUTH POWER PLANT

1997 - LOW PREASSURE BOILERS HEATING WATER – 1 year

2002 - MECHANICAL MAINTENANCE FOR VALVES (gland sealing), PIPES LINE CONNECTIONS HP & LP, PUMPS GLAND SEALING, LUBRICATION OIL STRAINERS CLEANING OF BFP’s – 1 year

Polytechnic University of Bucharest,

Faculty of Mechanical Engineering and Mechatronics.

Construction and Operation of Boilers to alternative fuels.

QA/QC - Operator responsible for the supervision and technical inspection of facilities

National Company for Control of Boilers and Hoisting

Operator for high pressure Boilers Diploma, Authorization Boiler license Class A Group3

2023 -Ce-Tec Training - Course Electrical Personal Isolation

2023 - Training - Course - Confined Space Entry-Certificate

2023 - Basic Offshore Safety Induction & Emergency Training (BOSIET)

2023 - H2S Training - Course

2024 Maersk Training- Total Energies - Electrical Isolation Low and high Voltage

EDUCATION Upway Consulting Group Bucharest – Project Manager Diploma2013

SPIRU HARET UNIVERSITY OF SOCIOLOGY-PSIHOLOGY - BUCHAREST 2003-2008

ENERGETIC TECHNICAL PR University - BUCHAREST 1999 – 2001

SPECIALIZATED IN ELECTROENERGETICIAN POSITION IN THE MINISTRY OF EDUCATION PROGRAM EU PHARE – VET RO 9405

ENERGETIC Technical College - BUCHAREST 1996 – 1999

HIGH SCHOOL - GRATUATED DIPLOMA 2000

ENERGETIC Technical College – BUCHAREST 1993 – 1996

PROFESSIONAL SCHOOL - GRATUATED DIPLOMA 1996

DURING THE YEARS OF PROFESSIONAL SCHOOL, I DID TRAINING FOR 3 DAYS/WEEK IN SEVERAL POWER PLANTS

SPECIALIZATED IN MECHANICAL MAINTENANCE OF STEAM & GAS TURBINES

Computer Literacy

Operating Systems: General & Graphics Applications, PowerPoint, Microsoft Office Word, Microsoft Excel, Verta -Pro DCS, Ovation-Power,

Symphony 7 ABB, Invensys Coal Fired Boiler Foxboro – Mark VI GE,

Activin spire. Delta V Emerson. Siemens SPPA - T3000 & TT4000

SAP Unisol. Work Permit Total Energies system., AVEVA, Pims,

Dynamic, team worker as partnership, seeking to improve skills experience in any workplace.

SIGNATURE OF CANDIDATE. Micu Gheorghe



Contact this candidate