Post Job Free

Resume

Sign in

Structural Welder Industrial Maintenance Pipefitter

Location:
Mesa, AZ
Posted:
March 19, 2024

Contact this candidate

Resume:

SEAN CLANCY

**** ***** ********* ** ****, AZ ****9 850-***-**** ad4f18@r.postjobfree.com

A skilled industrial maintenance and construction professional with 20+ years of experience in pipefitting, welding, safety, organization and management. Outstanding ability to adapt to various work environments from managing tools for 200+ workers to being a single rigger for crane operations. Extensive safety training including OSHA 10 and 30 Construction.

KEY SKILLS ASSESSMENT

Pipefitter – Able to read ISO Blueprints, lead fabrication and prep work, install pipe in racks, bolt up flanges and install various types of valves, torqued to any specification. Significant experience with chain falls and come-a-longs, and operate scissor lifts, boom lifts and rough terrain forklift.

Boilermaker – Prep and mill water wall tubes, extract supply tubes and re-install supply tubes for gin banks (mud drum and steam drum), repair superheat tubes, re-build economizers, cut tubes and membrane for water walls.

Tool Room Manager/Material Coordinator – Inventory and de-mode jobsites, call to order supplies for jobs, organize a multitude of different tools, order different types of gases for cutting and welding operations, pick up ISO print material from warehouse, delivered materials around jobsite, and expedite material from lay down yard.

Structural Welder – Stick weld 6010, 7018, 8018, 308, and 309 Stainless Steel. Expansion joints, plates up to 2” thick, peanuts for water walls, pad eyes for rigging, Structural Steel.

Certified Rigger – Set up 40/80 ton crane up, manage crane picks, rig to pipe/pvc/pipe racks, and give crane signals, bull rig, set up wire cable air hoist, knowing limitations and distances for crane picks.

WORK EXPERIENCE

Prolift Rigging

10/23-Present

Rigger

Rig and Install AC units

Rig to and install Generators

Anchor plates

Operate forklift and load Semi’s

Leopros/Karbor Corporation

08/23-10/23

Lead Pipefitter

Fabricate pipe spools

Layout and cut penetrations

Install all pipe and mechanical lines for Generators

Bolt flanges

MEI Crating & Rigging

05/22-08/23

Certified Lead Rigger/NCCER Structural Welder

Fabricate crane platform in steel

Welded over 300+ open root joints with 0 rejections

Mentor new employees

Demo presses

Skate heavy equipment

Bragg Crane & Rigging

05/21-03/22

Heavy Machine Mover/Certified Rigger

Removed Paper machine presses

Made 50+ Crane operations

Demo injection molds

Skate heavy machinery

Operate 40/60 Versa/Hoist lifts

MEI Rigging & Crating

04/20-05/21

NCCER Structural Welder

Welded over 800 joints 3/8-1/4 thickness

Skated and installed over 100 unit sections

Built/tripped/installed canmakers, presses, decorators for Ball Corperation

Brown & Root Construction

09/15-01/20

Lead Journeyman Pipefitter/Rigger/Material Coordinator/Mentor

Executed work for Exxon as a mentor/job site leader; led training for permitting process and ensured regulatory and job site safety processes were adhered to for 100+ employees on a 15 million dollar job. Resulted in zero incidents and on time completion.

Executed work for Koch Fertilizer as a material coordinator; maintained multi-million-dollar parts inventory for 200+ employees and delivered the project 2 weeks ahead of schedule.

Lead Rigger/Pipefitter for Vandelay Project; successfully led over 50 crane operations with a perfect safety record.

BE&K/Kellogg Brown & Root

12/03 – 09/15

Tool Room Manager/Pipefitter/Boilermaker/Mentor

Tool Room Manager for $100 million tool and parts inventory on the multi-billion dollar Archer Daniel Midland project for >2K employees; spearheaded tool room safety initiatives by enforcing PPE standards; Perfect OSHA safety record upon implementation of improved safety standard

Boilermaker/ Structural Welder for Georgia Pacific project; helped safety implement “TAKE 5” (take 5 minutes before each shift to inspect work environment) resulted in fewer incidents; Mig welded over 750 linear feet of skin casing for Water Walls and Economizer for Boilers; 100% pass rate the first time resulted in on-time job completion.

Structural Welder on the Kentucky Utilities project; installed 2 Stainless Steel Expansion Joints and re-enforced carbon steel I-beam with cross members; 100 Pass Rate saving over 100 man hours with a perfect safety record

Performed work at Marathon as the only NCCER (National Center for Construction Education and Research) Structural Welder; welded 50 Galvanized Structural Steel Joints and 80 pipe guides; Saved >$10K in material cost and 2 weeks labor with my design improvements

Lead pipefitter, installed over 3k linear feet of pipe and over 250 makeup’s; system function test passed first time with a 100% pass rate; saved man hours, material, and re-work costs as it was done correctly the first time.

EDUCATION

2010-2011 Locklin Tech Milton, FL Weld Cert

2000-03;-2005-07 University of West Fl Pensacola, 45 credit hours

1996-2000 Milton High School Milton, FL Diploma

Training & Professional Development

OSHA Standard and Inspections Procedures

OSHA Safety Programs and Subpart C

OSHA Safety and Health Programs for General Industry

OSHA Health Hazards in Construction

OSHA GHS & Hazard Communication

OSHA 30 Construction

OSHA 10 Construction

Rough Terrain Forklift Certification

NCCER Structural Welder



Contact this candidate