Post Job Free

Resume

Sign in

Marine Engineer Civil Engineering

Location:
Saudi Arabia
Salary:
20,000 SAR
Posted:
March 18, 2024

Contact this candidate

Resume:

i

Muhammad zaman (Aramco Approved)

Lead Marine Engineer/Technical superintendent.

Dry Dock specialist.

Cell: +966-**-*******

Email: ad4ep1@r.postjobfree.com

Location: Al Jubail, Kingdom Saudi Arabia

OBJECTIVE: A competent experienced individual seeking a challenging environment. Enhancement of the organization has always remained my priority with enthusiastic communication skills in engineering & management. Professional Summary

An experienced Civil professional with 14 years of experience including “12 years in the GULF Sector. Extensive industrial experience as a Construction Management and Project Control Management professional. Highly expert in planning, execution & quality control aspects of the project life cycle. Expert in estimation & scheduling with additional independent experience in Quantity survey, Civil survey, AutoCAD, Revit and Navis Works. I worked at independent positions in various organizations and controlled numerous multi-disciplinary engineering projects especially Marine Structures, Dry Dock, Pumphouse, Winch house, Fender Platform, flap gate, finger piers, concrete bored piles, Steel piles, Quay walls, Wharfs, cut-off walls, dredging & reclamation, dewatering of dry dock, utility works, Steel Structure and ship lift system including shoplift piers, ship lift platform, hauling in system and transfer system.

Furthermore, I have worked on numerous Mega Housing Project & High Rise Tower project, Substations, Transmission lines, Pre-engineering / Steel Structure Buildings, Precast Building and Primary & secondary level Infrastructures Construction. I also have past experience in organizing projects with emphasis on execution, quality control, engineering, planning and coordination of interfaces. QUALIFICATION:

Degree Name: Bachelor of Technology

Department: Civil Engineering

Institution/Board: Preston university Islamabad

Degree Name: Diploma of Associate Engineer (DAE)

Department: Civil Engineering

Institution/Board: Government University of Technology Rasul, Mandi Bahauddin, Pakistan. Degree Name: Matriculation

Major subjects: Science Group

Institution/Board: Govt. Higher School Jokalian, Mandi Bahauddin, Pakistan. Professional Membership

Associate member of the American society of Civil Engineering ACI Certified

ISO Certified 900*-****-***

ii

Linguistic, IT Skills & Courses

Oracle Primavera P6 – Expert to use P6

Sketch up – Expert to prepare 3d sketch.

Ms. Office – Extensive experience of all tools

Auto Cad – Extensive experience of all tools, 2D & 3D Revit – Medium Level

Navis Works – Expert- Extensive experience

Surveying – Expert to use Auto level, Total station & GPS. Project Summary -

Lead Marine Engineer (Aramco Approved) – From October 2019 to date. Company: Consortium of SEPCO Arabia and Sino hydro company Ltd. Client: ARAMCO - Saudi Arabian Oil Company

Project: King Slaman International Complex for Maritime Industries and Services - at Ras Al Khair. The Project is Construction of Maritime Yard Project (MYP) Package 4,5,6.

Project Engineer – From Nov 2018 to Oct 2019

Company: Olayan Descon.

Client: ARAMCO - Saudi Arabian Oil Company

Project: VRU (Viper recovery Unit) north Jeddah bulk plant, The project is construction of buildings, utility work, foundation, and blower foundation.

Civil Engineer –

Company: ASAS CONTRACTING COMPANY PRIVATE LIMITED

• Project: Qurayyah Independent Power Project

• Client: Samsung & Saudi Electricity Company, KSA.

• Duration: Sep 2017 to Oct 2018

The project is construction of independent power Project for Saudi Electricity Company at Al Qurayyat,

• Project: YASREF Housing Project. Yanbu

• Client: ARAMCO - Saudi Arabian Oil Company

• Duration: Sep 2016 to Sep2017

The project is the construction of 150 residential villas. The main contractor is KIC.

• Project: Muhayil-West & Namerah North 380kV BSP Project

• Client: Altukhi & Saudi Electric company

• Duration: July 2014 to Sep 2016

This project is the Construction of substation and transmission lines.

• Project: Jeddah Northwest 380KV/110KV/13.8KV s/s BSP

• Client: Saudi Electric company

• Duration: Dec 2013 to July 2014

This project is the Construction of substation and transmission lines.

Site Engineer – From July 2012 to Dec 2013

Company: Integrated Technical Solution CO LTD)

Project: Residential Building in Royal Commission, Client, RC Yanbu.

Site Engineer – From Jan 2011 to May 2012

Company: Amanat Hussain & CO. (PVT) LTD)

Project: Parking Plaza Fawara Chowk, Rawalpindi. Client, Defense Development Authority.

Trainee Sub-engineer – From July 2009 to Dec 2010 Company: Muzaffar Khan & Son Pvt Limited Wah Cant. Project: Construction of Artificial Limb Centre at Fauji Foundation Hospital iii

Details about Roles and Responsibilities as Lead Marine Engineer. Saudi Arabia 14 Years’ Experience

Project Name : King Salman International Complex for Maritime Industries and Services Maritime Yard construction project – (MYDP) Package 4,5,6 at Ras Al Khair.

Client : Aramco - Saudi Arabian Oil Company.

Company name : Consortium of SEPCO Arabia & Sino hydro Company Ltd. Position : Lead Marine Engineer (dry dock-2)– (Aramco Approved) Duration : from Oct 2019 to date.

Responsibilities as lead Marine Engineer:

• Led all marine design issues for dry dock, pump house, winch house, diaphragm wall, cofferdam, dredging, and reclamation, JIB crane beam, Fender Platform, flap gate, finger piers, concrete bored piles, Steel piles, Quay walls, Wharfs, dewatering of dry dock including utility works, Steel Structure, and ship lift system shiplift piers, ship lift platform, hauling in system and transfer system.

• Being lead marine engineer, I was involved in formwork design for Dry dock, pumphouse and winch house. The complicated formwork design was a project itself. I invited the world’s well-known formwork design companies like DOKA, PERI, RMD and Manar Al Omran and chose DOKA for Dock wall, PERI for cope structure and RMD for Pumphouse and Winch house.

• I was Responsible for preparing construction plans, arranging resources (Manpower, Equipment, Tools etc), managing and executing the site construction activities. Construction supervision and civil engineering execution including marine, Onshore, utilities, and infrastructures.

• Responsible for managing and executing the civil construction works. Construction supervision and civil engineering execution including marine, Onshore, utility, and infrastructures.

• Review drawings, specifications, standards and make sure to implement at sites to fulfill design requirements.

• To attend weekly management & construction meetings, weekly walk-throughs with SAPMT, to attend meetings with all vendors to sort out the material and equipment issues. Also, attend meetings with Jacobs and Design consultant RH to resolve design issues.

• Prepared site proposals that are suited to site within the arrangement of design requirements.

• Modified (CEP) construction execution plan and closed all comments raised by Aramco prior to start construction at sites.

• Monitor the schedule and execution of civil construction activities.

• Day-to-day management at the site, including supervising and monitoring the site labor force and the work of any contractor /sub-contractor.

• Preparing and verifying the Bar Bending Schedule (BBS).

• To prepare Method statements, formwork designs & execution plans. Prepare technical queries, and field clarification notes to solve any design issue.

• Marking red line various types of field changes on drawing.

• Executing tasks according to contract specifications and drawings.

• Ensure that the Head of Construction is kept fully informed at all times of progress, versus the Contractor's schedule, and given advance notice of any significant issues requiring resolution.

• Ensure that company HSE Policies and Procedures are followed.

• Resolving any unexpected technical difficulties and other problems that may arise.

• Resolving any unexpected technical difficulties and other problems that may arise.

• Liaise with the Construction Manager on technical issues as and when required.

• Liaise with the other disciplines of Construction Supervisors on a continuous basis to ensure smooth execution of the construction activities and management of construction interfaces.

• Ensure that all construction and pre-commissioning activities are documented to provide a smooth handover to the Site Commissioning Team and or Operation team.

• Liaise closely with the Site Commissioning Team to ensure that any Construction rectification required during the pre-commissioning and commissioning phases is promptly implemented.

• Support the construction manager in the preparation/review of construction plans. iv

• Coordinating with mechanical and electrical engineers, design department, QA/QC dept. and safety Department.

• Measurements of the work and final submission to the client for the payments.

• To prepare complete document for material approval from Aramco.

• Site visit every day and close all technical issue and give solution to execution team.

Project Name : Construction of Viper Recovery Unit at North Jeddah Bulk Plant. Client : Saudi Aramco Oil and Gas Company

Company Name : Olayan Descon

Position : Project Engineer

Duration : Sep 2018 to Oct 2019

Responsibilities: -

• Define and clarify project scope and Develop policies and procedures to support the achievement of the project objectives.

• Assigning work to team members and motivating the team to monitor and control the work progress as per the project baseline.

• Prepared the Technical query and made proposals as per actual site conditions.

• Supervise the work of subcontractors and proponents.

• Day-to-day management at the site, including supervising and monitoring the site labor force and the work of any contractor /sub-contractor.

• Ensure that the Head of Construction is kept fully informed at all times of progress, versus the Contractor's schedule, and given advance notice of any significant issues requiring resolution.

• Coordinating with mechanical and electrical engineers, design department, QA/QC dept. and safety Department

• Submitted two two-week plans to the Quality control department and SAPMT.

• Preparing weekly and bi-weekly inspection ahead schedules and Inspection reports.

• Construction works as per IFC and approved method statement.

• Prepared the change order for additional work and claim from SAPMT.

• Measurements of the work and final submission to the client for the payments.

• Monitoring all activities and materials of construction in accordance with the IFC and specifications.

• Preparing Bar Bending Schedule (BBS)

• Preparation of requests for inspections with all necessary attachments.

• Coordinating with the construction engineers and PID for clearing designated inspections (Hold and Witness Points).

• Review of the contractor's and supplier schedule.

• Preparing master schedule by compiling up the individual schedule received from different contractors and suppliers.

• Liaise with the other discipline Construction Supervisors on a continuous basis to ensure smooth execution of the construction activities and management of construction interfaces.

• Attending weekly meetings as required

• Monitoring and updating the master schedule (biweekly or monthly) during the construction phase of the project.

• Review Time & Extension claims from contractors.

• Preparing and resolving site work queries with SAPMT.

• Preparing test schedules, frequency of test and sampling related to approved Quality control program Raising Non Conformance Reports for any violation.

• Co-coordinating with PID for clearing logbook entries and closing NCR copies with proposed corrective actions.

• Marking red line various types of field changes on drawing.

• Preparing daily inspection reports on field activities.

• Quality field such as soil testing & compaction prior to concrete pouring for load bearing and Non load bearing foundations.

v

• Follow up all quality functions as per approved quality records, inspection typical test plan, check list etc. Conduct inspection of all materials received at site and ensure materials to be used confirming to contract plans and specifications.

Project Name : Qurayyah Independent Power Project Client : Saudi Electricity Company, KSA.

Company Name : Asas Contracting Company (Pvt) Ltd

Position : Civil Engineer

Duration : Sep-2017 to Oct-2018

Specific Duties and Responsibilities/Scope of Work:

• Planning and preparation of daily inspection schedule as per project specification.

• Clear information to client as per Site condition and arranging the inspection as per approved ITP.

• Preparation of the RFI& MRI as per project’s construction & procurement procedure.

• Inspection of structure and give instruction to Construction team prior to call Client for Inspection.

• Clearance & co-ordination inter discipline (Electrical, Mechanical and Piping).

• Conduct layout and level survey inspection with surveyor before and after the concrete.

• Monitor the required tests for grouting such as: fluidity test, bleeding test and compressive Strength

• Inspect the materials before use such as: re-bar, checked plates, anchor bolts, concrete, grout materials and Embedded items as per IFC Drawing and Project Specification

• Control log Record for all Test Results, daily Pouring Details and all test, Compressive strength result such as 7 days, 28 Days

• Inspection and supervision of piling works such as survey location, reinforcement work, concreting and witness the pile integrity test.

• Inspection of excavation, compaction, and Field Density Test (FDT) prior to lean concrete work.

• Execution for the concrete pouring work including air content test, slump test and temperature of concrete and also ensure that enough number of vibrators are used for concrete work.

• Rectification and inspection of honey comb rectification on concreted area prior to surface preparation.

• Location and Elevation inspection of tank & equipment foundations which includes anchor bolts and embedded plates including ring wall foundation, back filling with the approved materials.

• Review all construction drawings to ensure that they contain the necessary quality related requirements prior to release for construction.

• Responsible for checking the materials & works to confirm that everything as per approved method statement

& approved construction drawing.

Project Name : YASREF Housing Project. Yanbu

Client : ARAMCO - Saudi Arabian Oil Company

Company Name : Asas Contracting Company (Pvt) Ltd

Position : Civil Engineer

Duration : Sep 2016 to Sep 2017.

Specific Duties and Responsibilities/Scope of work;

• Drawing review, Supervision and progress monitoring of Steel Structure/Pre-Engineering buildings.

• Monitoring the subcontractors works and provide issue solving support on daily basis by coordinate with technical department, QC team leader and HSE.

• Preparation of submittals, MS Concrete, Formwork /Scaffold load calculation and Bar bending Schedule.

• Maintaining & updating of report and document project activities and data as related requirements

• Prepare weekly and monthly Contraction, Manpower and Materials schedule.

• Report to Project Manager and responsible for period area or package construction work with civil construction team consists of several civil engineers and terms of workers

• Confer with supervisors to determine project details, such as plan preparation, acceptance testing, and evaluation of field conditions .

• Assign to engineers and supervisors with calculated work quantities after analyzing detailed dimensional drawings and design layouts for projects and to ensure conformance to specifications .

• Prepare report and document project activities and data as related requirements.

• Ensure that project construction activities are conducted in accordance with quality system vi

Project Name : Muhayil-West 380kV BSP Project

Client : Altukhi & Saudi Electric company

Company Name : Asas Contracting PVT Limited.

Position : Civil Engineer

Duration : Jul 2014 to Oct 2016.

Responsibilities: -

• Define and clarify project scope and setting team direction

• Develop policies and procedures to support the achievement of the project objectives

• Assigning work to team members and motivating the team

• Responsible for checking the materials & works to confirm that everything as approved method statement & approved construction drawing.

• Preparation of submitting Technical Queries, Method of Statement for Concrete works; Form- works

/Scaffold load calculation and Bar bending Schedule and data as related requirements.

• Maintaining & updating of report and document project activities and data as related requirements

• Prepare Contraction, Manpower and Materials Plan as per schedule.

• Assign to engineers and supervisors with calculated work quantities after analyzing detailed dimensional drawings and design layouts for projects and to ensure conformance to specifications .

• Report to Project Manager and responsible for period area or package construction work with civil construction team consists of several civil engineers and terms of workers.

• Coordinate with HSE and QA/QC Manager and team.

• Confer with engineers to determine project details, such as plan preparation, acceptance testing, and evaluation of field conditions .

Project Name : Jeddah North West 380KV/110KV/13.8KV s/s BSP Client : Saudi Electric company

Company Name : Asas Contracting PVT Limited.

Position : Field civil engineer.

Duration : Dec 2013 to July 2014.

Responsibilities: -

• Execution of civil works including study and review of technical specifications.

• Implementing and assuring the quality of work at the site.

• Ensuring project runs smoothly and structures are completed within budget and time.

• Preparing Bar Bending Schedules (BBS).

• Handling major site works like casting of footing, columns, slab and beams.

• Execution of the layouts of column and lifts.

• Check the shuttering and bar binding works as per the approved drawing.

• Preparing detail site report as per the work progress.

• Liaise with the client and verities of professionals including architect and sub-contractors.

• Supervise the work of subcontractors.

• Test of cement, sand, brick and concrete on the site

• Measurements of the work and final submission to the client for the payments.

Project Name : Natural Engineered Wastewater Treatment Plant, FLOUR

(GHGHS)

Client : Royal Commission for Jubail (RC). KSA

Company Name : Integrated Technical Solution CO LTD). Position : Field Civil Engineer

Duration : July 2012 to Dec 2013

• Responsibilities: -

• Maintaining & updating of report and document project activities and data as related requirements

• Prepare weekly and monthly Contraction, Manpower and Materials plan as per schedule.

• Report to Construction Manager and responsible for period area or package construction work with civil construction team consists of several civil engineers and terms of workers vii

• Confer with supervisor to determine project details, such as plan preparation, acceptance testing, and evaluation of field conditions

• Assign to engineers and supervisors with calculated work quantities after analyzing detailed dimensional drawings and design layouts for projects and to ensure conformance to specifications

• Prepare report and document project activities and data as related requirements

• Execution of requirements of Construction as per IFC drawing and Project Specification.

• Monitoring the Construction activity and Supervise the Construction as Per IFC Drawing and Project Specification.

Pakistan 2 Years’ Experience

Project Name : Parking Plaza Fawara chowk, Rawalpindi Company Name : Amanat Hussain & co. (Pvt) Ltd

Client : Defense development

Position : Site Engineer

Duration : Jan, 2011 to May, 2012

Specific Duties and Responsibilities/Scope of work:

• Primary responsibilities of site work with different site management departments for most efficient planning, cost effective, quality assured and safety complied manners with each construction team from the beginning to actual completion of the project

• Determine labor requirement and dispatch workers to construction sites down to different disciplines and departments

• Inspect and review project to monitor compliance with building and safety codes, and other regulations of “CDM” as well as CM company

• Report to Project Manager and managing director, interpret and explain plans and contract terms to administrative staff, workers, and clients.

• Prepare contracts, tender filling B.O.Q and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.

Project Name : Construction of Artificial Limb Centre at Fauji Foundation Hospital. Company Name : Muzaffar Khan & Son Pvt Limited Wah Cantt Client : Fuji Foundation

Position : Trainee sub-Engineer

Duration : July 2009 to Dec, 2010

Specific Duties and Responsibilities/Scope of work:

• Execution of civil works including study and review of technical specifications.

• Implementing and assuring the quality of work at the site.

• Ensuring project runs smoothly and structures are completed within budget and time.

• Preparing Bar Bending Schedules (BBS).

• Handling major site works like casting of footing, columns, slab and beams.

• Execution of the layouts of column and lifts.

• Check the shuttering and bar binding works as per the approved drawing.

• Preparing detail site report as per the work progress.

• Liaise with the client and verities of professionals including architect and sub-contractors.

• Supervise the work of subcontractors.

• Test of cement, sand, brick and concrete on the site

• Measurements of the work and final submission to the client for the payments. viii

PERSONNAL INFORMATION:

Name : Muhammad zaman

Father’s Name : Muhammad Arshad

Date of Birth : December 25, 1989

Nationality : Pakistani

Marital Status : Married

Religion : Islam

Iqama : Valid/Freelancer/Transferable

Driving license : Valid up-to 2027

Languages Known : English, Arabic and Urdu

City : Al Jubail, Kingdom of Saudi Arabia

Declaration:

I do hereby declare that the information furnished above is true to the best of my knowledge, and I will work regularly for the constant development of the organization. References:

1- Name: Jawad Ali.

Company: Saudi Aramco.

Position: Project engineer (Package #4).

Project: King Salman International Complex for Maritime Industries and Services Maritime Yard construction project – (MYDP) Package 4,5,6 at Ras Al Khair.

Email: ad4ep1@r.postjobfree.com

Phone: 009***********



Contact this candidate