Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Puntod, 9000, Philippines
Posted:
March 18, 2024

Contact this candidate

Resume:

NECEFORO PADEROG VENTURES

Purok **, Zone * Fuentes, Maria Cristina,

Iligan City, Lanao del Norte, Philippines

Mobile # : +639********* (Philippines)

+639********* (Philippines)

Tel. #: +636******** (Philippines)

Email Address: ad4e46@r.postjobfree.com

CARRIER HIGHLIGHTS :

Thirty-four (34) years and one (1) month of experienced in construction such as water system installations, erection of towers, rehabilitation & installation of plant equipment (includes piping lines, equipment, furnace, smoke stack, pumps, vessels, chiller, Air fin cooler, knock out drum, columns & etc. ), HVAC Installations, installation of fire water piping and sprinkler system, Filtration Unit Installation & experienced also in oil and gas refinery plant projects. With EPC & Oil and Gas Projects experienced . EMPLOYMENT HISTORY:

Oct 2020 – Jan 2022 : ABDUL RAHMAN AL BADER SONS COMPANY Position : Construction Manager

Client : Khurais Central Processing Facility, Saudi Aramco Project Title : Installation of Seawater Pre-Treatment Unit Contract # 651*******

Job description : Over-all in-charge in the installation process. Including fabrication of piping from tie-in 30’ diameter pipe to Filtration skid and all accessories.

Reporting to Project Manager.

Attend meeting with client (Saudi Aramco PMT) about the update weekly.

Update daily accomplishments.

Apr. 2020– Oct 2020 : ABDUL RAHMAN AL BADER SONS COMPANY Position : Engineering Manager

ABSCO Engineering Department

Job Description : Attend All job explanation and site visit for all Saudi Aramco Jobs proposed Projects (Long/Mid/Short Form Projects.) Distribute all the bid documents to concerned discipline for tendering, review all estimated proposals,finalized and submit to Saudi Aramco Before Bid Closing Date.

Oct. 2019-Mar. 2020 : ABDUL RAHMAN AL BADER SONS COMPANY Position : Construction Manager

Client : SAUDI ARAMCO Manifa, Kingdom of Saudi Arabia Project Title : Demolition Works @ Manifa Producing Facility

(Petrol Station/Lift Station (2Units)/ Evap. Ponds (10 Units)/ RHM Camp & Laydown Yard) BI-10-00450

Job Description/Role: Over-all in-charge in the demolition process and reporting to Project Manager any accomplishment and update.

Aug. 2016-Sept. 2019: ABDUL RAHMAN AL BADER SONS COMPANY Position : Project Engineer/Mechanical Engineer

Client : SAUDI ARAMCO, Kingdom of Saudi Arabia

Project Title : PIV Replacement Works @ Khurais Plant Replacement of Whole Plant Fire Water Post Indicator Valve

( 16” Dia. Butt and Wrapping of RTR Pipe)

Contract # 651******* (Completed)

Position : Mechanical Engineer/Piping Engineer

Project Title : Tie-in ABQQ-114 OB Well To ABQQ Gosp-3 (Completed) Contract # 651******* (Completed)

Position : Mechanical Engineer/Piping Engineer

Project Title : Tie-in ABQQ-563 OIL Well To ABQQ Gosp-6 ; 10” dia. Pipe

(BI-10-014**-****) (Completed)

Mar 2015 – Nov. 2015: JGC SP (M) SDN. BHD. /(JGC Singapore Pte. Ltd.) Position : Mechanical Supervisor (Static & Rotating Equipment, HVAC) Client : SHELL (MDS) MALAYSIA, Bintulu, Sarawak, Malaysia Project Title : SMDS Rejuvenation Project 2015 (EPCm) JOB DESCRIPTION/ROLE:

• Under direction of Construction Superintendent, perform the duties as instructed.

• Check and evaluate subcontractor’s status within his/her work area.

• Check the work progress status of responsible area and assure that the works conforms to all technical requirements.

• Coordinate work execution in his/her area with other concerned supervisor(s).

• Prepare and direct daily log, weekly construction schedule and monthly construction schedule within the area assigned.

• Monitor sub-contractors on their delay accomplishments and report to Project Coordinator.

Aug 2009 – Feb.2015 : ABDUL RAHMAN AL BADER SONS COMPANY Position : Project Engineer/Mechanical Engineer

Client : SAUDI ARAMCO, Kingdom of Saudi Arabia

DUTIES AND RESPONSIBILITIES:

• Organize the site so that work is carried out to the required standard with minimum risk to men, equipment & materials.

• Know the requirements of Schedule ‘D’ & the company’s loss prevention policy.

• Be familiar with work permit procedures as per GI 2.100. Allowed only certified or trained operators for specific equipment/tools.

• Give precise instructions on responsibilities for correct work methods.

• Ensure that Weekly Safety meeting & Daily Tool Box meetings with subordinates are conducted.

• Investigate all accidents, injuries, property damage & other HSE related incidents & ensure required reports are promptly submitted to HSE Manager.

• Plan & provide for good housekeeping.

• Coordinate with sub-contractors & other contractors on site to avoid any confusion about areas of responsibility.

• Position equipment effectively & ensure that electricity supply is installed, used & maintained correctly.

• Check that equipment & tools (both power & hand tools) are maintained in good operating conditions & equipped with safety devices & passed the required testing & inspections.

• Make sure that all men know how to obtain & administer first aid properly & efficiently to all injured persons. They should also know how to summon assistance in case of emergency

& nominate others to act in your absence.

• Make sure that all suitable personal protective equipment (PPEs) are available and that it is used.

• Release employees when necessary for fire & all Safety trainings.

• Cooperate with the safety engineer & the fire department, by acting on their recommendations.

• Determine the resources required for the purpose of production and keep preparing status reports and presenting them to the higher managing authorities for scrutinizing.

• Set a personal example.

HANDLED SAUDI ARAMCO COMPLETED PROJECTS:

Project Title : Installation of Crude Oil Metering Unit and Meter Prover @ KRT JB2 Receiver Trap, Jubail 2 Interface (Minimum Flow 20,000 barrel/hr) Contract # 651*******

Date Covered: March 20, 2014 – February 2015

Project Title : Upgrade Mud Plant @ Shedgum ( BI – 00811 ) Contract # 660*******

Date Covered: December 2013 – March 2014

Project Title : Tie-in, PDHMS, Fence and Surface Equipment for UTMN Wells Contract # 651*******

Date Covered: May 2012 – November 2013

Project Title : Upgrade Wastewater System In Southern Area Oil Operations (BI-10-00209) Contract # 660*******, 660*******, 600019259 (37 GOSP Plant) Date Covered : July 2010 – April 2012

Project Title : QUU 1 & 2 Pipeline Rehabilitation – PHASE I (60 in. dia. @ 30 km.) Date Covered: August 2009 – December 2009

Jan. 2007 – Dec. 2008: RAHABCO ENG’G. AND CONST. SDN. BHD. Position : Project Engineer/Mechanical Engineer

Client : MLNG-PETRONAS, Bintulu, Sarawak, Malaysia JOB DESCRIPTION:

• Project Control, overall work site planning, schedule reporting, update progress report, update extra works, manpower report, Engineering works (like as built drawing), RFI enquiries to owner, control of material/drawing/engineering & attend all meeting (owner & internal).

• Coordination work between owner-superintendent-QA/QC Supervisor-Work Leader- Manager.

• Supervised in the fabrication and installation of Module 6, 14 inches LPS pipeline, natural gas line, N2 gas line, HC Vapor line, high and low pressure steam line.

• Installation of Compressors, Compressor Shelter & AFC Working Oil Coolers.

• Supervised during the fabrication and installation of various oil and gas refinery pipelines, such as LPS pipeline, Natural Gas Line, N2 Gas Line, HC Vapor Line High and Low Pressure Steam Line.

HANDLED COMPLETED PROJECTS:

Project Title : MDD-MLNG DUA DEBOTTLENECKING PROJECT Client : MNLG-PETRONAS, Bintulu, Sarawak, Malaysia Date Covered : June 2008 – December 2008

Project Title : MLNG 3 Project (Shutdown)/ Module 6 EEFU Project Client : MNLG-PETRONAS, Bintulu, Sarawak, Malaysia Date Covered: January 2008 – May 2008

Project Title : LPS Pipelines, Natural Gas Line, N2 Gas and HC Vapor Lines Client : SMDS- Malaysia, Bintulu, Sarawak, Malaysia Date Covered: January 2007 – December 2007

Apr. 1996- Dec. 2006: TUBOD ENGINEERING WORKS & IND’L. SALES Position : Project In-charge (Mechanical Engineer) Client : AMS Steel Corporation, Davao City, Philippines JOB DESCRIPTION:

• Complete rehabilitation, modification & installation of Hand Mill Plant such as piping works, lubrication system & fabrication of some plant equipment.

• Installation of Fire Piping System based on IFC Drawings as per approved by National Fire Protection Association (NFPA).

• Installation of 8” dia. PVC pipeline from reservoir to loading area @ MVC pier (1.5 km.)

• Installation of various fire protection requirements such as: piping for fire water supply source, pumps suction piping, fire water pumps, discharge piping, fire water distribution piping, branch piping and other associated fixed fire protection equipment, valves and fittings.

• In charge in fabrication, dismantling and installation works including cladding, piping installation and alignment.

• Complete fabrication & erection of 1600 mm dia. X 18 meters spiral pipe pylon.

• Complete erection of 8 segments x 10 ft. triangular smart Telecommunication tower. Includes painting, guying & installation of communication signal apparatus and grounding system.

• Complete installation of settling tanks including piping; Dismantling of acid tank; Dismantling of damage 25MT boiler stack & economizer; Dismantling of dilapidated diaphragm cells & chipping of foundation.

• Complete cleaning, servicing & alignment of Hot Mill 1 Plate finishing line side trimming Electro-Mechanical Machineries.

• Installation of equipment such as mill stands, table rollers, cooling bed, reducers, drive motors & other Electro - Mechanical parts.

• Preparation of foundation, sandblasting & bending of plate;

• Welding preparation & painting for complete erection.

• Complete installation of dryer compressor, installation of Pipelines.

• Complete fabrication & installation of pendant type 3 MT capacity OHTC including control installation.

• Prepare order for consumables, materials, tools & equipment & make listings of some missing Bar mill parts.

• Inspect the proper painting preparation & application

• Check the proper LPG Piping Line installation procedure. HANDLED TUBOD ENGINEERING COMPLETED PROJECTS:

Project Title : Rehabilitation, Modification & Installation of 12,000 MPTY Hand Mill Plant; Installation of Fire Water Piping System and Installation of Sprinkler System in Whole Hand Mill Plant.

Client : AMS Steel Corporation, Davao City, Philippines Date Covered : April 2006 – December 2006

Project Title : Installation of Caustic Soda Pipeline at the Newly Constructed MVC Pier; Installation of Fire Water System.

Client : Mabuhay Vinyl Corporation (MVC) Iligan City, Philippines Date Covered: November 2005 – March 2006

Project Title : Fabrication of Two (2) units Mouring Bouy Tank; Removal & Installation of New Economizer, and Replacement of Heating Chamber # 1 Client : Mabuhay Vinyl Corporation (MVC) Iligan City, Philippines Date Covered: May 2005 – October 2005

Project Title : Fabrication & Erection of Jollibee Pylon Four (4) Branches in the Philippines Client : Jollibee Philippines

Date Covered: September 2004 – April 2005

Project Title : Erection of Smart Telecommunication Tower @ Bacolod, LDN., Philippines Client : Smart Philippines

Date Covered: August 2004 – September 2004

Project Title : Installation of Two (2) units Settling Tanks; Removal of two (2) units Acid Tank; Removal of 25MT Boiler Stack & Economizer; Removal of Six (6) Cells & demolition of foundation.

Client : Mabuhay Vinyl Corporation (MVC) Iligan City, Philippines Date Covered: May 2004 – July 2004

Project Title : Rehabilitation of Hot Mill 1 Plate Finishing Line Side Trimming Electro- Mechanical Machineries.

Client : Global Steelworks Int’l Inc. Iligan City, Philippines Date Covered: February 2004 – April 2004

Project Title : AMS 60,000 MTPY Bar Mill Plant

Client : AMS Steel Corporation, Davao City, Philippines Date Covered: January 2001 – January 2004

Project Title : Fabrication & Installation of Two (2) units Denaturated Alcohol Tanks

(150,000 MT & 30,000 MT Capacity)

Client : AA Aqua-Agri Corporation, Ormoc City, Philippines Date Covered: January 2000 – December 2000

Project Title : Installation of Dryer Compressor & Piping of Acetylene Bottling Plant Client : Maria Cristina Chemical Industry (MCCI), Iligan City, Philippines Date Covered: July 1999 – December 1999

Project Title : Fabrication & Installation of 3MT capacity Overhead Traveling Crane (OHTC) Client : Mabuhay Vinyl Corp. (MVC), Iligan City, Philippines Date Covered: March 1999 – June 1999

Project Title : Rehabilitation of AMS Bar Mill Plant (whole plant) Client : AMS Steel Corporation, Davao City, Philippines Date Covered: November 1998 – February 1999

Project Title : Installation of LPG Pipeline from Jetty area to Spherical Storage Tank & Whole Bottling Area.

Client : Petronas Energy Philippines Inc. (PEPI)

Date Covered: April 1996 – October 1998

Jan 1993-Dec 1995 : PROVINCIAL PLANNING & DEVELOPMENT COORDINATOR (PPDC)

Position : Mechanical Supervisor

Client : Central Visayas Water Sanitation Project (CVWSP) Job Description : Supervise the installation of pipelines from potable Water reservoir to consumers.

Jan 1987-Dec 1992 : DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Position : Project Inspector

Project Title : Construction of Water Reservoir & Installation of 800 mm. Diameter Main pipe line.

Job Description : Inspect the proper water reservoir construction & Installation of pipe line whether it conforms as per plan. PERSONAL BACKGROUND:

Date of Birth : February 25, 1964

Place of Birth : Maribojoc Bohol, Philippines

Civil Status : Married

Name of Wife : Jessica N. Ventures

Nationality : Filipino

Name of Father : Mamerto F. Ventures (Deceased)

Name of Mother : Isabel P. Ventures

Their Address : San Roque, Maribojoc, Bohol, Philippines Blood Type : O+

Philippines Address : Prk. 20, Zone 8 Fuentes, Maria Cristina, Iligan City, Lanao Del Norte,Philippines

Driver’s License : Code # 1238- Professional Driver’s License Passport No. : P4677814C ( Expiry: 11 Jul 2033)

Special Skills : Computer literate, Heavy Equipment Operator (Telescopic Crane)

KSA Driving License : Expiry Date : 30/08/2024

KSA Iqama # : 242*******

EDUCATIONAL BACKGROUND:

Education : BSME – Bachelor of Science in Mechanical Engineering University of Bohol – Tagbilaran City

Philippines

TRAININGS/SEMINARS :

1. MLNG – MDD Training Courses:

1.1 Lock Out & Tag Out (LOTTO)

1.2 Job Safety Analysis (JSA)

1.3 Total Safety Task Instruction (TSTI)

1.4 Incident/Accident Investigation & Reporting

1.5 MDD HSE Procedure Preview

1.6 HSE Sampling/Audit

1.7 Leadership Course

2. NIOSH- Petronas Safety Passport Orientation & Seminar 3. Confine Space Induction – Conducted by NIOSH Malaysia 4. Permit To Work Course (PTWC)

5. Confined Space Training Course – Conducted by NIOSH Malaysia 6. Saudi Aramco Safety Orientation # 40033717 (Date: 08/03/2010, Expire : 07/03/2013) 7. Saudi Aramco H2S Safety Awareness Course Expiry Date: 11/26/2018 8. Confined Space Safe Entry Supervisor – Cert. # AS0062556 (Exp. 17-Oct.-2020) 9. Others as per attached.

References available upon request.



Contact this candidate