Post Job Free

Resume

Sign in

Transmission Lineman Erector/Assembler (or) Material Controller clean)

Location:
San Pablo, Tarlac, 2300, Philippines
Salary:
$55 per hour
Posted:
March 16, 2024

Contact this candidate

Resume:

PRIMARY

Maligaya Elementary School

**** - ****

SECONDARY

Capas National High School

(Formerly Capas High School)

**** - ****

COLLEGE

Saint Paul College of Tarlac

* **** - ********* ** *******r Science

(Graduate)

2004 - 2006

Steel Works

Steel Bending

Masonry

Painter

Bulldozer Operator

RELEVANT SKILLS

Siegfred CONTACTS

F. Perez

Assembler/Erector/Lineman

WORK EXPERIENCE

+639*********/+639*********

ad4ddv@r.postjobfree.com

309 Anonas St. Brgy.

Maligaya, Tarlac City, Tarlac,

Philippines

EDUCATION

TRAINING ATTENDED

TOWER-TECH

Professional Height Safety Training and Fall

Arrest Equipment.

: Safe working at heights.

: Mast and tower climbing.

: Tower rescue

: Inspection and Maintenance of PPE

.CERT. NO – 595********

ISSUE DATE – 8-20-2014

EXPIRY DATE – 8-20-2016

TESDA (Technical Education and

Skills Authority)

BULLDOZER OPERATION D6R3

COURSE

No. 4 Lily Hill Plaza, C.M. Recto Hi-way, Clark Freeport Zone, Pampanga Telephone: 045-***-****

: 0DWHULDO &RQWUROOHU

: 'HFHPEHU WR 'HFHPEHU

Position

Date

Position

Date

Mepcon Philippines Incorporated

ISSUE DATE – 10-05-2023

EXPIRY DATE –10-04-2028

MTP Enterprises

(Formerly MTP Construction)

Transmission Line/Communication Contractor 412 Anonas St.Brgy.Maligaya, Tarlac City, Philippines Cell No: 095******** /Email: ad4ddv@r.postjobfree.com

: Assembler/Erector

: August 14, 2019 WR Present (On Call )

: Lineman/Assembler/Erector

: January 3, 2007 to February 4, 2012

Position

Date

Job Description

Hauling and segregation of tower parts according to part number and sizes.

Setting up of a ginpole followed by tying of rope in shackle to the lower and upper part of ginpole.

Engine puller settings (improvised)

Attaching of pulleys on the top of ginpole followed by pulling rope connected to the pulleys going to engine puller used to lifting tower parts.

Perform tower assembly by using blue print of tower.

Perform tower erection 69KV, 230KV, 500KV portion by portion from primary legs,waist

body,cage,bottom cross arm,middle cross arm,upper cross arm,etc.

Assisting in lifting of ginpole using square rigging method.

Climbing safely with complete PPE with a pack of bolts and nuts, lock washer, spud wrench, sling, wrench,extra carabiner.

Bolts tightening and correction.

REFERENCES

MANOLITO T. PEREZ

General Manager

MTP Enterprises

Phone:

Email :

095********

ad4ddv@r.postjobfree.com

DANIEL D. CALDERON

Lineman

Catalpa Energy pty ltd.

North East Terrace Morgan SA

Phone: 041*******

MTP Construction

Transmission Line/Communication Contractor 412 Anonas St. Maligaya, San Miguel, Tarlac City Cell No. 091********

Email: ad4ddv@r.postjobfree.com



Contact this candidate