Post Job Free

Resume

Sign in

Quality Control Safety Training

Location:
Atyrau, Atyrau Region, Kazakhstan
Posted:
March 17, 2024

Contact this candidate

Resume:

NAME: MUHAMMAD SHABBIR

Email : ad4d9c@r.postjobfree.com

Cont : +974******** +92-305-*******

Add : Pakistan, Punjab, District Bahawalpur Tehsil Hasilpur chak # 164/m P/o 143/m

PERSONAL NATIONALITY : Pakistani

DATE OF BIRTH : 01-04-1982

GENDER : Male

MARITAL STATUS : Married

COMPUTER LITERACY

MS Office, Windows xp/10, Auto Cad 2000.

ACADEMIC QUALIFICATION: B.A (BACHELOR DEGREE) & MEHENICAL DIPLOMA

(Islamia University Bahawalpur)

Mechanical Engineering Diploma (Pits) Reg No:TC-M-01-06-00772

CERTIFICATIONS:

CSWIP 3.1 LEVEL II CRT NO 89994/2

ASNT LEVEL- II VT, MPT & DPT.

LANGUAGES : English, Urdu.

CURRENT EMPLOYER : TEKFEN CONSTRUCTION ( QATAR LNG GAS PROJECT)

PROPOSED POSITION : QA/QC Welding / Mechanical Inspector

SAFETY TRAINING : JAZAN ECONOMIC CITY- REVERSE OSMOSIS DESALINATION PLANT

& SEWAGE TREATMENT PLANT.

TEKFEN AZFEN Alliance (Sangachal Terminal Shah Deniz II.Azerbaijan BAKU

QA/QC Ethics Descon Engineering ADNOC GASCO Safety induction.

JGC and Technimount (JVC) Safety inductions.

Safety training in AMW, Descon Engineering Abu Dhabi.

Safety training and induction at DEW, Descon Engineering Pakistan.

Safety training and induction at TSJ. (Tecnimount & Samsung)

Safety Training Gasco Shutdown H2S

Work History

Over 12 years of experience in piping, Pipeline and Tanks fabrication, welding inspection, Quality Control and Nondestructive Testing on piping and API Storage Tanks. Welding inspection of oil and gas plants (Witnessing WQT, & QA/QC on Production) RT, MT, PT, VT, as well as in SHUT DOWN Projects.

Dates From / To

Employer

Client

Project Description

Position

Roles & Responsibilities

Nov-30-2023 To till now

April 2021 to Jan 2023

April 2018 to 09-Jan 2020

06-Jan-2018 to April 2018

07-Oct-2017 To-26-Oct-1017

27-Sep-2015 To 28-April-2017

20- July-2015 To 25-Sep 2015

16-Dec-2014 To 31-Jan-2015

Oct-2014 To 16-Dec 2014

Oct-2012 To 30-Sep- 2014

Feb-2010 To Oct-2012

March-2009 to Jan-2010

TEKFEN CONSTRUCTION NFE QATAR

GATE CONSTRUCTION Tengiz KAZAKHSTAN

ABDULLAH ALZAMIL METAL WORKS(KSA)

ABDULLAH ALZAMIL METAL WORKS(KSA)

DESCON ENGINEERIN(Pakistan)

TEKFEN AZFEN Alliance (AZERBAIJAN BAKU)

New Tech Mechanical Engineering(Pakistan)

Descon Engineering Abu Dhabi.

Descon Engineering Abu Dhabi.

Descon Engineering Abu Dhabi.

Descon Engineering. Abu Dhabi (UAE)

Descon Engineering. Lahore (PAKISTAN)

QATAR GAS OPERATING COMPANY Ltd.

THE CHEVRON CORPORATIN (TCO) Tengiz

SAUDI ARAMCO JIZAN KSA (SSCM)

SAUDI ARAMCO BASE OIL COMPANY (YANBU REFINERY)

OGDCL

British Petroleum (BP)

PAKISTAN STATE OIL(PSO)

BOROUGE

GASCO

TSJ(Tecnimont & Samsung)

JGC & Tecnimont

Descon Engineering

North Field East Project Onshore LNG Facilities.

(FGP) Piping & Pipe Line Project (HPHT)3GI TO DPs & Conventional line 3Generation Plant to 3Generation Injection.

Jizan Economic City- Reverse Osmosis Desalination Plant & Sewage Treatment Plant.

Bottom Replacement of Tank F-8003 & F-9001

UCH Gas Plant Shutdown

Shah DENIZ 2 Onshore Terminal Facility Construction Works Project.

Tanks Repair Work Shell Repair Bottom & Maintenance of Roof.

PO FLARE GAS RECOVERY GAS PROJECT

Gasco shutdown train 1 & 4.

Borouge Polyolefin’s

IGD HABSHAN 5

Various projects in workshop (LMW) Lahore.

Senior Inspector Welding & Mechanical

Senior Mechanical & Welding Inspector

QC Welding Inspector

QC Mechanical / Welding Inspector

QA/QC Welding piping Inspector

QA/QC Welding Inspector

QA/QC Welding Inspector

QA/QC Welding Inspector

QA/QC Welding Inspector

QA/QC Welding Inspector

QA/QC Welding Inspector

Assist QC Welding Inspector

Fabrications & Erection (Piping/Tanks/Structure)

Material inspection as per project specification and material test certificates.

Inspection of pipe spool marking, pipe cutting, and joint fit-up as per approved construction drawings, WPS joint details and ASME B31.1/B31.3/API 650

Dimensional Inspection of pipe spools prior to welding and after welding.

NDT control as per specification requirements.

PWHT control for Low Alloy Steel Materials.

Control of blasting and painting activities.

Review and prepare of hydro test Packages.

Line check prior to hydro testing and preparation of punch listing for piping test package and verification as well.

Witnessing piping hydro testing, flushing as per procedure.

Inspection of steel structural marking, cutting and fabrication per approved construction drawing.

WELDING

Inspection of welding consumable as per approved WPS.

To verify the required equipment for welding, like welding machine, baking equipment, welding torch or holder, clamping, etc.

To inspect backing of low hydrogen electrodes and handling of consumables.

Witness of joint preheating, post heating and purging as required.

Witness the welding activities.

Visual inspection of completed weld joints.

Issuance of inspection reports and arranging client inspection and NDT as required.

Non-Destructive Testing

Performance and witnessing the,

Penetrant Testing, Magnetic Particle Testing and Leak Testing as per ASME SEC V and project specifications.

Witness the hydro testing for piping, tanks and exchangers.

Preparation and review of NDT reports.



Contact this candidate