WORK EXPERIENCE:

MARKETECH INTERNATIONAL CORPORATION, PHX, AZ

Project Coordinator CVD/PVD Tool Hookup February 2023 to Present

The PVD/CVD PC will report to the Program Manager

He or she will be onsite making sure all safety rules are being followed while reporting back any timeline issues, contractor status, and TSMC requests.

He or she will send out a report of daily activities including what tools were worked on that day as well as giving a detailed status on where the tools stand. In addition to this, he or she will make sure contractors are implementing the 8395 rules, per TSMC.

Execute construction projects by organizing, planning, and overseeing project tasks.

Ensure all safety, quality, and health standards are met.

Complete quality inspections and supervise all project members, including staff and subcontractors.

Communicate with contractors, making sure they are executing their jobs adequately.

Work directly with sub-contractors and crews to ensure construction tasks are completed on time.

Work side by side with tool vendors and make any changes the vendor needs.

Track project progress.

Supervise staff and provide constructive feedback.

Monitor and report on project progress.

SILENT-AIRE USA INC, Mesa, AZ

Technical Auditor, September 2019 to Present

The Technical Auditor will conduct production/field installation audits and work with PM/FE to ensure ECR/NCR/IWO scopes are completed and reduce additional cost expenditures to projects.

Collect and analyze QA/QC, NCR/ECR and IWO documents to detect deficiencies, non-compliance with customer standards.

Report to management about asset status and audit results, and recommend changes in operations, design, material delivery etc.

Prepare detailed reports on audit findings.

Inspect assets in production and in field for efficiency, deficiencies and use of installation procedures, providing training on site, if necessary, to support field install of ECR’s

Supervise auditing of vendor repairs and commissioning to evaluate potentials cost and time savings • Examine inventory with ship loose procedures and fabricated parts to ensure compliance and scope

Examine whether the organization's objectives are reflected in installation activities, and whether employees understand the objectives, design modifications and process to change if needed

Conduct pre-implementation audits to determine if systems and programs under development will work as planned.

Complete weekly technical audits on MDC's in production and in field installations from IWO and ECR modifications.

TA will be responsible for weekly reports to PM's from the field and production on ECR completion/validation on new installs.

TA will communicate and coordinate all IWO reports with PM on parts allocation.

TA will work with FE to facilitate and field ECR discussions to ensure production changes meet ECR expectations.

TA will work with director on reduction of costs for field installations and evaluate IWO/NCR/ECR corrections.

TA will work weekly with production on schedule, IWO, EPMS, Vendor Gear and align with QA/QC on reporting and field identified risks

Conduct project postmortems to identify areas for improvement; make recommendations based on findings • Assist with report and presentation preparation

Maintain a professional image and demeanor with all employees, management, executives and visitors.

Maintain a high level of confidentiality

Phoenix Area Project Coordinator, September 2019 to December 2020

Create Non-Conformance Requests for parts needed or parts of the unit that are ineffective.

Electrical hook-up: wired all 480volt onsite units with power cables to the disconnects

Facilitate Project Managers for cross-department initiatives.

Scheduling and scribing kickoff/recurring meetings, developing meeting agendas, and managing stakeholder communication by following up on status to ensure deliverables and milestones are met.

Compile data from numerous sources based on project scope and progress; summarize data and prepare recommendations to management based on findings.

Administer the schedule of assigned projects and tasks from inception to closeout to ensure results are achieved.

Organize, track, and communicate information critical to the operations and manufacturing departments to help ensure goals are met and important items are monitored and addressed in a timely manner.

Organize files on the server for Projects.

Organize and coordinate all aspects of the “Ship Loose” shipments for projects.

Use analytical abilities, team building and motivation skills to help organize resources, meet tight deadlines, manage simultaneously occurring tasks and shifting priorities, and control project change.

Communicate with program managers, project directors, other departments and trades. Works directly with clients and handles sensitive situations and flow of information.

DAIFUKU AMERICA CORPORATION

Commissioning Engineer July 2018 to September 2019

Perform equipment modifications and commissioning

Assist and provide on-the-job training to other Daifuku employees as well as to contractors or customers

Follow all safety and protocol guidelines and work with safety coordinators

Prepare for paperwork including Pre-Task Plans daily prior to work, commissioning check sheets

Troubleshoot and recover errors

Read mechanical and electrical drawings

Load/install and analyze software and hardware

Conduct running tool performance tests and verify results

Configure tools to specific customer demands

Communicate project progress and take directions from Project Manager to stay on schedule and provide constructive feedback as warranted

Prioritize tasks based on the commissioning check sheets

Communicate work expectations with co-workers daily and interact with customer regularly

SILENT-AIRE USA INC, Mesa, AZ

Field Service Engineering Technician, June 2016 – June 2018

Read and interpret electrical, control and mechanical blueprints, drawings and other specifications

Electrical hookup; wired all 480volt onsite units with power cables to the disconnects

Wired all motors inside units with 480v power

Measure and lay out reference points for installation

Assemble and install refrigeration or air-conditioning components using hand and power tools

Measure and cut piping, and connect piping using welding and brazing equipment

System start up and testing for leaks using testing devices

Recharging system with refrigerant, check and test regulators, calibrate system and perform routine maintenance

Troubleshoot, diagnose and repair a wide variety of heating and cooling/refrigeration equipment/systems

Troubleshoot diagnose and repair PLC Based Custom Controls designed and built by Silent-Aire

Travel to customer locations domestically and internationally (approximately 50%)

Working independently on varied assignments requiring a broad and/or specialized knowledge of refrigeration and HVAC

Applying standard procedures and making modifications of procedures or use methods developed in previous assignments

Required to communicate technical issues to technical and non-technical staff

Maintain a high level of communication with both internal and external stakeholders, customers, contractors and industry peers

Working in highly sensitive or mission critical facilities, Industrial, Manufacturing Facilities and Field and office environments

HONEYWELL INTERNATIONAL, Phoenix, AZ

Software Configuration Management Analyst, May 2015-June 2016

Use of Automated Configuration Management (ACM/CM21) tool.

Supporting SW CM activities including generation, and verification

Implementation of software changes

Excellent Microsoft Office Skills - Word, Excel, Outlook, and PowerPoint

Software Builds using the Dimension Tool

Utilization of best practice to manage software baselines

Ability to track and control management changes during the software life cycle, including deviations and waivers in software configuration control

Manage software releases and deliveries, including versioning control

Recording and reporting of processes to maintain accurate management of software configuration

VERSATEK SOLUTIONS, Mesa, AZ

Shipping and Receiving Lead, Jan 2015-Apr 2015

Verify and keep records of all incoming and outgoing shipments

Prepare items for shipment

Utilization of EVSPI, Wasp Inventory tools and excel spreadsheets

Determine method of shipment, utilizing knowledge of shipping procedures, routes, and rates

Unpack and examine incoming shipments, reject damaged items, record shortages, and correspond with shipper to rectify damages and shortages

Receive part request from vendors and send price quote

GT ADVANCED TECHNOLOGIES, Mesa, AZ

Mechanical Maintenance Technician IV, Jan 2014 - Oct 2014

Install and maintain mechanical and hydraulic equipment within the plant’s facility

Perform emergency repairs of equipment during production

Perform mechanic skills including, but not limited to, mechanical and hydraulic, troubleshoot and repair of production machines

Maintenance and component replacement

Detect faulty operations on all Sapphire growth tools

Read and interpret equipment manuals and work orders to perform required maintenance and service

Diagnose problems, replace or repair parts, test and adjust

Perform regular preventative maintenance

Use a variety of hand and power tools

ROBERTSON FUEL SYSTEMS, Tempe, AZ

Quality Control Inspector/Document Control Specialist, Nov 2011 - Jan 2014

Responsible for receiving documentation and inspection of product from customers to ensure specifications are properly met

Initiate and maintain document implementation and engineering change notices and archiving

Updating of engineering change notices

Inspection of incoming parts and inspection of product at various stages of completion

GENERAL DYNAMICS C4S, Scottsdale, AZ

Configuration Management Analyst, Sep 2008 - Oct 2011

Project Management of major system contracts managing the outcome of government contracts

Collaborate in an efficient manner with engineers and customer representatives to obtain necessary approvals to guarantee project schedules are met

Develop project timeliness and organize/lead deliverable status meetings

Manage and control Third Party Software

Hardware configuration by updating parts lists and creating parts within the TeamCenter tool

Use of ClearCase/ClearQuest tools to perform software configuration

DoD Security Clearance was obtained to work on a NASA project

Managed 6 different projects including one from NASA called TDRS-K

MOTOROLA/FREESCALE, Chandler, AZ

Production/Document Control Specialist, Mar 1992 - Aug 2008

First 13 years on the production line, certified in a wide range of production processes such as, Diffusion, Etch, Photo, Cleans and Implant. All using various metrology tools.

Was an equipment maintenance tech for 4 years specializing in Diffusion, Etch and Implant.

Initiate all production/engineering materials for the production line

Management, storing and controlling versions and publishing of specification documents.

Track and prioritize materials to meet delivery schedules

Maintenance of all incoming and outgoing inventory from the die cage area, as well as organize and prepare die for shipping

Responsible for training new associates

Crucial member of the Emergency Response Team, CPR and Hazwoper certified

UNITED STATES MARINE CORPS BLT 1/4 COMPANY B, Camp Pendleton, CA

Corporal Squad Leader, Jul 1987 - Aug 1991

Served in Desert Shield/Storm - Trained and led a squad of Marines for combat operations in an infantry unit

Special Weapons Security - Secret Clearance for the safety and security of special weapons aboard the USS America CV-66

ADDITIONAL SKILLS:

Certified forklift operator

Certified Scissor lift operator

Expert operating and repairing DCM and Abwood Grinding tools

Expert operating and repairing Meyer Berger Cutting/Cropping tools (650, 750, and Brickmaster)

Expert operating and repairing Lapmaster polishing tool

OSHA 30 certified

Swagelok tube fitting and VCR installation training

Education:

Rio Salado 2008-2010

Public Administration

Mesa Community College 1994 and 1997

General Studies



Contact this candidate