CURRICULUM VITAE
Name : Ali Priyadi
Place, Date of Birth : Bandung, January 12th, 1979
Qualification : Piping Designer
Religion : Moslem
Marital Status : Married
Nationality : Indonesian
Address : Jl. Gang Rain Rt 003/02 No.47
Pondok Karya Pondok Aren– Tangsel 15225
Mobile : +628**********
E-Mail : **********@*****.***
Education
Formal Education : - Senior high school 3 Cimahi Jawa Barat, 1994-1997.
- Junior high school PASUNDAN 3, Cimahi, 1991-1994.
- Elementary school Sudirman 3, Cimahi, 1985-1991. Course and Training : - Piping & Mechanical Drafter Course at Rekayasa Engineering Drafting School
- Auto Plant Isometric at PT. Rekayasa Engineering
- Microstation Course at PT. Rekayasa Engineering
- PDMS Training at PT. Reka Patria Ekaguna
- Autocad Plant 3D at PT. Rekayasa Engineering
- SP3D at PT. Rekayasa Engineering
- E3D Training at PT.Aneka Bina Citra
WORK EXPERIENCE
COMPANY :
PT. Aneka Bina Citra
Year : 2023 – Present
Project : WWT-WWTP
Project Type : Engineering/Piping Designer
PT. Rekayasa Engineering
Year : Sep 2021 – 2022
Project : PLTU SULUT
Project Type : Engineering
Project Duration : 2 years
Project Value :
Location : Timor
Client : PP
Plant Owner : PP
Position Held : Piping Designer
My Responsibility : 3D Design SP3D
Year : April 2020 – Aug 2021
Project : PLTU TIMOR
Project Type : Engineering
Project Duration : 2 years
Project Value :
Location : Timor
Client : PP
Plant Owner : PP
Position Held : Piping Designer
My Responsibility : Autocad Plant 3D
Year : Jan. 2020 – April 2020
Project : PK SOYBEAN EXTRACTION PLANT
Project Type : Engineering
Project Duration : 2 months (May 2019 – Aug. 2019) Project Value :
Location : Gersik, East Java
Client : Wilmar
Plant Owner : Wilmar
Position Held : Piping Designer
My Responsibility : Autocad Plant 3D
Year : Aug. 2019 – Sep. 2019
Project : Geothermal Muaralaboh
Project Type : Field Engineering (site)
Project Duration : 1 months (Aug. 2019 – Sep. 2019) Project Value :
Location : Padang, West Sumatra
Client : PT Rekayasa Industri
Plant Owner : PT Supreme
Position Held : Field Engineer
My Responsibility : 3D Design SP3D
Year : May 2019 – Aug. 2019
Project : Isometric Project RDMP RU V
Project Type : Engineering
Project Duration : 3 months (May 2019 – Aug. 2019) Project Value :
Location : Balikpapan, East Kalimantan
Client : PT Rekayasa Industri
Plant Owner : PT Pertamina
Position Held : Piping Designer
My Responsibility : Autocad 2D
Year : 01 Feb 2019 - May 2019
Project : Pembuatan FEED PK SOYBEAN EXTRACTION PLANT & FEED COPRA DIRECT EXTRACTION PLANT
Project Type : FEED Engineering
Project Duration : 3 months (February 2019 – May 2019) Project Value :
Location : Gersik, East Java
Client : Wilmar
Plant Owner : Wilmar
Position Held : Piping Designer
My Responsibility : Autocad Plant 3D
Year : 19 Sep 2018 - 31 Jan 2019
Project : Pembuatan FEED Untuk HCU, HMU, dan SRU Unit Proyek RDMP RU V
Project Type : FEED Engineering
Project Duration : 4 months (September 2018 – January 2019) Project Value :
Location : Balikpapan, East Kalimantan
Client : PT Rekayasa Industri
Plant Owner : PT Pertamina
Position Held : Piping Designer
My Responsibility : 2D Piping Drawing with Autocad COMPANY :
PT. AMEC Berca Indonesia
November 2014 – March 2016
Study :
• Pipe Support Design Modeling using AVEVA PDMS MDS.
• Pipe Support Draft using AVEVA PDMS Draft.
Continuing August 2014 – November 2014
Assignment at Qatar, Doha office Amec Blackcat.
Responsibility:
• Pipe Support Design Modeling using AVEVA PDMS MDS.
• Pipe Support Draft using AVEVA PDMS Draft.
Project:
• AMEC BLACKCAT for OXY Brownfield Platform Area PS1K, IS28, IS26, IS37,
• PS1B.
April 2014 – July 2014
Assignment at Qatar, Doha office Amec Blackcat.
Responsibility:
• Pipe Support Design Modeling using AVEVA PDMS MDS.
• Pipe Support Draft using AVEVA PDMS Draft.
Project:
• AMEC BLACKCAT for OXY Brownfield Platform Area PS1K, IS28, IS26, IS37. January 2014 – April 2014
Responsibility:
• Pipe Support Design Modeling using AVEVA PDMS MDS.
• Pipe Support Draft using AVEVA PDMS Draft.
Project:
• AMEC BLACKCAT for OXY Greenfield Platform Area IS28B, Q08B, IS29B, IS04. January 2013 – December 2013
Responsibility:
• Pipe Support Fabrication Drawing using AVEVA PDMS Draft, MDS and ABA. Project:
• Knightbridge ENQUEST (modeling MDS pipe support)
• BRYNHILD TIE-IN DEVELOPMENT PROJECT (DRAFT pipe support with PDMS) Starting December 2012 – January 2013
Responsibility:
• Pipe Support Fabrication Drawing using AVEVA PDMS Draft, MDS and ABA. Project:
• Knightbridge ENQUEST (modeling MDS pipe support)
• BRYNHILD TIE-IN DEVELOPMENT PROJECT (DRAFT pipe support with PDMS) Starting March 2012 – December 2012
Responsibility:
• Pipe Support Fabrication Drawing using AVEVA PDMS Draft, MDS and ABA. Project:
• Britannia Long Term Compression Project – CONOCOPHILLIPS
• Forties Alpha Satellite Platform - APACHE
• Pipe Support Fabrication Drawing using AVEVA PDMS and AutoCad. Project:
• Chirag Oil Project – West Chirag PDQ Platform
BP/AIOC - AZERBAIJAN INTERNATIONAL OPERATING COMPANY Responsibilities - Produce piping documents/drawings: Equipment Location Plan, Piping Plan, Section & Details, Pipe Support, Isometric and Calculate MTO. Piping Design & Support Modelling, 2D Draft Modelling and Review Modelling & Ensure All Design data are clash free
& consistent using PDMS 3D and PDMS DRAFT.
Projects involvement:
• BRITANNIA LONG TERM COMPRESSION
(Periods: Des-11~Des-12)
• COP-AMEC Baku workshare
(Periods: Apr-11~Des-11)
COMPANY : PT PREMIUM CONSULTING
Jakarta – Indonesia
Periods : Jan-11~ Mar-11
Project : Re-routing Piperack L-4, make it Tie-in to L-5 & L-6 Assignment: PT. SOUTH PACIVIC VISCOVE Purwakarta
(INDONESIA)
Position : As Piping/Mechanical Designer
Job Description : - Prepare the piping plan drawings, demolition plan drawings, Tie-in schedules, constructional isometrics and Material Takeoff for the materials constituted the design package.
Periods : June-10~ Des-10
Project : Expansion Project for Line-4 210 TPD (Spinning Area) Assignment: PT. SOUTH PACIVIC VISCOVE Purwakarta
(INDONESIA)
Position : As Piping/Mechanical Designer
Job Description : - Prepare the relevant mechanical / piping plan drawings, demolition plan drawings, Tie-in schedules, constructional isometrics and Material Takeoff for the materials constituted the design package.
- Preparation of a demolition scheme in the phase
manner so as to keep the system alive and available at all times by parallel laying of the new assembly
COMPANY : PT REKA PATRIA EKAGUNA
Jakarta – Indonesia
Periods : January-10~ April-10
Project : Babo Pantoon Trestle and Marine Passenger Terminal Assignment: BP Berau (INDONESIA)
Position : As Piping Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : Desember-09~ January-10
Project : VLP Compression Installation
Assignment: KANGEAN (INDONESIA)
Position : As Piping Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : November-09~ Desember-09
Project : As-Built
Assignment: CNOOC (INDONESIA)
Position : As Piping Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : August-09~ November-09
Project : VLP Compression Installation
Assignment: KANGEAN (INDONESIA)
Position : As Piping Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : January-09~ August-09
Project : Modification for Wellhead Platform
Assignment: HESS (INDONESIA-PANGKAH)
Position : As Piping Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : October-08 ~ January-09
Project : Gelam Compression (GC-1) Projects
Assignment: Conoco Phillips
Position : As Piping Junior Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
COMPANY : ELECTROWATT-EKONO Sdn. Bhd
(Kuala Belait) Brunei Darussalam
Piping / Process Designer
Periods : July-08 ~ October-08
PROJECT : For Brunei Shell Petroleum
New Onshore BOG Compressor – BDEP Preparations
SC 4 - West Facility Integrity & As-built AP-06
Design Portable & Industrial Water Tanks for MSB
SCOT Facility audit ARFU 26.2 (new HAC drawing)
JOB DESCRIPTION :
Design activities comprised the replacement of existing firewater system (CS) with the new GRE piping, upgraded to cover the extended process facilities on all the platforms. The study of the existing piping arrangement, preparation of a demolition scheme in the phase manner so as to keep the system alive and available at all times by parallel laying of the new assembly, except for a minimum shutdown period as required for the hook-up of the new assembly, was conducted at site. The relevant piping plan drawings, demolition plan drawings, Tie-in schedules, constructional isometrics and Material Takeoff for the GRE / Non- GRE materials constituted the design package.
COMPANY : PT. REKAYASA ENGINEERING
(Engineering & Construction)
Jakarta – Indonesia
Periods : April-08 ~ June-08
Project : Engineering & Construction
Assignment: VICO Project
Position : As Piping Junior Designer
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : March 2008 ~ April 2008
Project : BOETHANOL PLANT FOR GASOHOL PROJECT
PT. MEDCO ETHANOL LAMPUNG
Lampung South Sumatra
Position : As Field Engineer on Site
Job Description : - Line Check
- Prepare Layout As Built
- Prepare Isometric As Built
- P&ID As Built
Periods : January 2008 ~ March 2008
Project : DURI AREA-4 (TRAIN-C)
PT. CHEVRON PACIFIC INDONESIA
Position : As Piping Draftsman
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : October 2007 ~ January 2008
Project : Engineering & Construction
Assignment: SMI and MEDCO Project
Position : As Piping Draftsman
Job Description : - Prepare Piping Plotplan drawing
- Prepare Isometric Drawing
- Isometric sketch
Periods : August 2006 ~ October 2007
Project : BOETHANOL PLANT FOR GASOHOL PROJECT
PT. MEDCO ETHANOL LAMPUNG
Lampung South Sumatra
Position : As Piping CAD Draftsman
Job Description : - Prepare Piping Layout drawing
- Prepare Isometric Drawing
- Isometric sketch