Contact this candidate

Resume:

Alejandro Guira Oril

JOB Title: Facilities MEP Supervisor

**** ****** **.

Pinagkaisahan Makati City

Home Landline: 02-88106552

Mobile Number: +974-******** / +974-********

Email Add: ad46b6@r.postjobfree.com

Objective: To develop full potential on my field of expertise and to contribute

Innovation for environment and society.

Work Experience:

Facilities MEP Supervisor

Darwish Interserve

Doha Qatar

October 7, 2020 to present

Site Assignment:

Milaha Headquaters

Zone 56 street No.100 Building No. 149

Qatar Navigation, East Industrial Area

9th August 2022 to Present

Job Description for: Facilities MEP Supervisor

Responsible for all major equipment / assets of Milaha such as Elevator, Generator, MV Panel, Transformer, Car park ventilation, Fire pump, All CWS pumps, FCU, Split AC unit, VRF split unit, Speed Lane, BMS, Access control, Ups, Central, Landscape, Fire alarm system, Fire Fighting System, CCTV, Gate Barrier, Paging system, Intercom system, Façade glass / Cladding, Sliding glass door, Speed lane, Façade lights, Signage (Logo),

Responsible for Manpower required for the operation schedule and emergency basis.

Responsible for assigning competent technician to do the job properly and safety manner Corrective & Preventive maintenance work.

Follow the Annual PPM chart and also give recommendation to improve the ppm

Prepare daily and weekly activity and apply PTW

Make sure all Sub-contractor will follow the PPM Plan schedule with PTW

Maintain the document for Air quality test and water test

Make sure all instrument is available and updated calibration.

Record daily events concerning maintenance operation, Activity and Un-plan schedule request by client

Prepare equipment forms for daily monitoring -Water, Electricity, Temperature

Prepare equipment checklist reports for documentation

Supervise post construction, post occupancy for newly renovated office space and show room

Assist building contractor and provide information they needed

Prepare all equipment are always ready to use and in good condition

Prepare Technical report, RCA thru SIR – Site inspection report

Monitor all building contractor activities

Coordinate to Facilities Manager all equipment concern related to maintenance issue

Perform electrical, mechanical, plumbing, civil and works activity in all Client area and

Common area

Prepare all document for Civil defense, ISO, safety audit, Client audit and Internal audit for the building

Ensure all materials require have stock always available and with records, coordinate to store keeper

Prepare for Monthly consumption reading for Electrical, water, readings

Prepare for Monthly Outsource contractor performance (KPI)

Prepare for Monthly schedule of Man power require for the building

Use FSIGO / CAFM system for releasing, closing, update for corrective and preventive work order. Through mobile and computer

Use EPMS CAFM system from computer and Mobile as required from MILAHA

Ensure the Annual PPM chart is conducted on time

Conduct Site inspections for the building daily basis

Conduct tool box talks and safety training

Monthly Inspection of hand tools from technician if always good condition

Monthly inspection of Power tools

Monthly Inspection for brazing set, scaffolding items

Responsible to provide Method of statement and risk assesstment in every CM and PPM required scope of work for maintenance in house.

Make sure in every maintenance work have wearing proper PPE

Make sure in every maintenance work have PTW

Make sure major maintenance work have (RAMS)

Conduct safety inspection with safety officer of the building

Provide Vacation Annual leave plan for all staff manpower

Check email from time to time and send reply.

Attend Monthly Meeting conducted by Site Manager and safety officer

Work Experience:

Facilities Maintenance supervisor

Darwish Interserve

Doha Qatar

October 7, 2020 to present

Site Assignment:

Almutahida tower

Viva bahariya 27-28

Pearl Qatar

April 2022 to 8th August 2022

Job Description for: Facilities MEP Supervisor

Monitor & Operate all building major equipment / assets of VIVA 27 & 28 such as Generator, MV Panel, Transformer, Car park ventilation, Fire pump, Lifts, All CWS pumps, Chilled water system, AHU, TFAU, FCU, Split ac unit, PACKAGE unit, BMS, Access control, Ups, Central battery system, Gym equipment, Water feature, Jacuzzi, Swimming pool, Garbage chute, Landscape, Fire alarm system, Fire Fighting System, Gate Barrier, Audio video system, Paging system, Inter come system, Water tanks, Façade glass, Envac, Revolving and sliding glass door,

Make sure all Sub contractor will follow the PPM in correct schedule plan with reports

Conduct monthly testing of Generators,

Record daily events concerning maintenance operation

Prepare equipment forms for daily monitoring

Prepare equipment checklist reports for documentation

Supervise post construction, post occupancy for newly renovated Apartments space

Assist building contractor and provide information they needed

Prepare all equipment are always ready to use and in good condition

Monitor all building contractor activities

Coordinate to Facilities Manager all equipment concern

Perform electrical, mechanical, plumbing, civil and works activity in all Client area and

Common area

Prepare all document for Civil defense, ISO, safety audit UDC and Internal audit for the building

Ensure all materials require have stock always available and with records coordinate to store keeper

Prepare for Monthly consumption reading for Electrical, water, BTU readings

Prepare for Monthly Outsource contractor performance (KPI)

Prepare for Monthly schedule of Man power require for the building

Use CRM / CAFM system for releasing, closing, update for corrective and preventive work order. Through mobile and computer

Ensure the Annual PM chart is conducted on time.

Make KPI for all subcontractors

Make sure Site inspections for the building is conducted daily

Conduct tool box talks safety training weekly

Make sure in every maintenance work have wearing proper PPE

Make sure in every maintenance work have PTW

Make sure always Conduct safety inspection on the building

Provide Vacation leave plan schedule for all staff manpower

Check email time to time and send corresponded email

Attend Monthly Report Meeting conducted by General Manager

Facilities Maintenance supervisor

Darwish Interserve

Doha Qatar

October 7, 2020 to October 31 2021

Site Assignment:

Qatar Petrolium Tower

St. west bay

October 8, 2020 to October 31 2021

Job Description for: Facilities Maintenance Supervisor

Operate all building major equipment, generator, MV Panel, Transformer, Car park ventilation, Fire pump, Lifts, All pumps, Cradle machine, Chilled water system, AHU, TFAU, FCU, Split ac unit, PACKAGE unit, Access control, Ups and Central battery system.

Conduct monthly testing of Generators, fire Pumps

Record daily events concerning maintenance operation

Prepare equipment forms for daily monitoring

Prepare equipment checklist reports for documentation

Supervise post construction, post occupancy for newly renovated office space

Assist building contractor and provide information they needed

Prepare all equipment are always ready to use and in good condition

Monitor all building contractor activities

Coordinate to Facilities Manager all equipment concern

Perform electrical, mechanical, plumbing, civil and works activity in all Client area and

Common area

Prepare all document for Civil defense, ISO, and Internal audit for the building

Ensure all materials require have stock always available and with records coordinate to store keeper

Prepare for Monthly consumption reading for Electrical, water, BTU readings

Prepare for Monthly Outsource contractor performance (KPI)

Prepare for Monthly schedule of Man power require for the building

Use FSIGO system for releasing, closing, update for corrective and preventive work order. Through mobile and computer

Ensure the Annual PM chart is conducted on time.

Make KPI for all subcontractors

Make sure Site inspections for the building is conducted daily

Conduct tool box talks safety training weekly

Make sure in every maintenance work have wearing proper PPE

Make sure in every maintenance work have PTW

Make sure major maintenance work have (RAMS)

Make sure always Conduct safety inspection on the building

Make leave plan schedule for all man power

Check email time to time and send corresponded email

Attend Monthly Report Meeting conducted by General Manager

Maintenance supervisor

Alfardan Properties

Doha Qatar

December 15, 2019 to present

Site Assignment:

Burj Al Qassar Tower

Majiswoon St. west bay

December 15, 2019 to June 11, 2020

Job Description for: Maintenance Supervisor

Operate all building major equipment, generator, MV Panel, Transformer, Car park ventilation, Fire pump, Lifts, All pumps, Cradle machine, Chilled water system, AHU, TFAU, FCU, Split ac unit, Access control, Ups and Central battery system.

Conduct monthly testing of Generators, Generator exhaust fan and fire Pumps

Record daily events concerning maintenance operation

Prepare equipment forms for daily monitoring

Prepare equipment checklist reports for documentation

Supervise post construction, post occupancy for newly renovated office space

Assist building contractor and provide information they needed

Prepare all equipment are always ready to use and in good condition

Monitor all building contractor activities

Coordinate to Building engr. all equipment concern

Perform electrical, mechanical, plumbing and civil works activity in all tenants and

Common area

Prepare all document for Civil defense, ISO, and Internal audit for the building

Ensure all materials require have stock always available and with records

Prepare for Monthly consumption reading for Electrical, water, and Qatar cool

Prepare for Monthly Outsource contractor performance (KPI)

Prepare for Monthly schedule of Man power require for the building

Use Oracle system for releasing, closing, update for corrective and preventive work order.

Ensure the Annual PM chart is conducted on time.

Attend weekly meeting conducted by General Manager

Make Monthly report and submitted to Operation Manager.

Work Experience:

Senior Hvac

Hamad and Mohamad Alfuttaim

Doha Qatar

April 13, 2015 to September 14, 2019

Site Assignment:

Pearl Qatar tower 1-2

Manage By: Alfardan Properties

Pearl Qatar

April 21, 2015 to September 14 2019

Job Description for: Hvac Supervisor

Operate all building major equipment and lighting through BMS

Primary Concern in Centralized air- conditioning operation, Air- handling units, Fan coil unit, TFAU, Split ac unit, Carpark ventilation,

Attend all tenants concern, conduct on site trouble shooting

Conduct monitoring of all operations equipment. Chilled water system, Condenser water pumps, Booster pumps, Transfer pumps, Submersible pumps, Exhaust Fan and Fresh Air Fan, FCU

Record daily events concerning maintenance operation

Prepare equipment forms for daily monitoring

Prepare equipment checklist reports for documentation

Assist building contractor and provide information they need

Prepare all equipment are always ready to use

Coordinate to Building engr. all equipment concern

Perform electrical, mechanical, plumbing and civil works activity

Prepare for man power schedule

Prepare Monthly report and submit to Management

Prepare document for Civil defense, ISO, and Internal Audit

Work Experience:

Electro Mechanical Technician

Polystar General Services

82 Bernabe St. Better Living Subd.

Paranaque City.

March 1, 2010 to present

Site Assignment:

Accra Law Tower

Manage By: Ascendas

32ND St. cor 2nd Ave.

Global Taguig City.

Nov 16, 2011 to present

Site Assignment:

Ayala Life- FGU Center

6811 Ayala Ave. Makati City

March 1, 2010 to Nov. 5, 2011

Job Description for: ELECTRO MECHANICAL TECHNICIAN

Operate all building major equipment and lighting through BMS

Primary Concern in Centralized air- conditioning operation,

Chiller, Cooling Tower, Air- handling units, Fan coil unit

Attend all tenants concern, conduct on site trouble shooting

Conduct monitoring of all operations equipment.

Chiller, Chilled and Condenser water pumps, Booster pumps, Low voltage switch gear, Transformers, Transfer pumps, Submersible pumps, Chiller Exhaust Fan and Fresh Air Fan, Elevator Machine Room, FCU

Conduct weekly testing of Generators, Generator exhaust fan and fire Pumps

Record daily events concerning maintenance operation

Prepare equipment forms for daily monitoring

Prepare equipment checklist reports for documentation

Conduct post construction monitoring for newly renovated office space

Assist building contractor and provide information they need

Monitoring of CCTV, CAR RAMP, ELEVATOR CONTROL,BMS,FDAS

Prepare all equipment are always ready to use

Monitor all building contractor activities

Conduct meter reading of buildings daily electric, water and btu meter

Coordinate to Building engr. all equipment concern

Operate gondola equipment to check glass leakage and repair

Perform electrical, mechanical, plumbing and civil works activity

Maintenance / Shifter

Jardine Energy Control,

JM Compound

Faraday St. Cor. Osmena Highway

Makati City

June 16, 2007 up to February 28, 2010

Site Assignment:

Ayala Life- FGU Center

6811 Ayala Ave. Makati City

Dec. 23, 2007 up to February 28, 2010

Job Description for: BMS and CHILLER OPERATOR

Operate all building major equipment and lighting through BMS

Primary Concern in Centralized air- conditioning operation

Chiller, Cooling Tower, Air- handling units

Attend the tenants concern, conduct on site trouble shooting

Conduct hourly monitoring of all operations equipment.

Chiller, Chilled water pumps, Low voltage switch gears, Transformers

Transfer pumps, Submersible pumps, Generators Exhaust and Fresh Air

Fans, carbon monoxide monitoring.

Conduct weekly testing of Generators and fire Pumps

Record daily events concerning maintenance operation

Prepare equipment forms for daily monitoring

Prepare ISO reports for documentation

Conduct post construction monitoring for newly renovated office space

Assist building contractor and provide information they need

Make sure all the tools and special equipment are always ready to use

Prepare all equipment are always working and in good condition

Perform equipment preventive maintained on schedule.

Prepare preventive maintenance report for documentation.

Perform in house equipment repair such as replacement of motor bearing, pillow Block, water pump mechanical shaft seal and bearing, cooling tower blower shaft seal bearing, replace magnetic contractors and circuit breaker.

Perform electrical, plumbing and civil works.

Perform the entire task assigned by the supervisor concerning building operation.

Perform trouble shooting on telephone communication

Refrigeration / Air-conditioning Technician

Team Leader / Servicing

Gain Appliances Service Center

24 Libertad St. Highway Hills

Mandaluyong City

Jan. 02, 2002 to May 27, 2007

Job Description for: Team Leader

Perform trouble shooting, repair and replace defective parts such as compressor motor, fan motor, contactor, capacitor, condenser and evaporator coil on field

Perform Pump down, System reprocessing, installation of window type and split type air conditioning, All Panasonic product at field works.

Can work one-man team without supervision

Assign in servicing and workshop for repair and maintenance

Can make a decision and immediate response for the customer concern

Estimator, Installer, testing and commissioning

Report all the problem and concern regarding in work assign for customer

Satisfaction

Refrigeration and Air-conditioning Technician

OJT1 and OJT2- 1420 Hrs

Assignment: Servicing / Workshop

Project Assignment:

City Land Tower

Pasong Tamo Ext. Makati City

THERMOMETRIC

Washington St. Makati City

Job Description for: Refrigeration and air-conditioning technician

Perform trouble shooting, repair and replace defective parts

Perform Pump down, System reprocessing, installation of window type and split type air conditioning at field works.

Assign in servicing and workshop for repair and maintenance

Installer, testing and commissioning

EDUCATIONAL ATTAINMENT:

1996-2000 Bachelor of Science Industrial Technology(BSIT)

Major in Refrigeration and Air-conditioning

PAMANTASAN NG MAKATI

J.P Rizal Ext. Makati city

1992-1996 MAKATI HIGH SCHOOL

Gen. Luna st. Poblacion Makati city

Certificate of Recognition - Best in Ref. and Aircon 3rd year level

Pamantasan ng Makati C.O.T 2nd Semester 1998-1999

Certificate of Achievement - Refrigerator Servicing Seminar-Batch IV

Matsushita Electric Philippines Corporation (MEPCO) March 4-8, 2002

Certificate of Participation - Job Attitude and Values Enrichment Seminar

CSD-Shaw Boulevard August 15, 2004

Certificate of Attendance - First aid and Basic life Support/Emergency Rescue and Transfer Raffles Institute Seminar Room March 23, 2012

18th flr ACCRALAW TOWER, Bonifacio Global, Taguig City

Tesda Passer;

3rd Class License- 1997

Certificate of Basic first Aid with CPR – Q-Safe facility Doha Qatar / Date Issue 18th August 2022

Certificate of Fire Warden – Q-Safe Facility Doha Qatar / Date Issue 23rd August 2022

Certificate of Scaffolding Inspector – Q-Safe Facility Doha Qatar / 25th August 2022

Certificate of Confined Space Entry – Enertech Qatar safety Training Centre / 24th October 2022

Certificate of Authorize Gas Tester – RCS International Doha Qatar / 19th October 2022

Special skill:

Trouble shooting and Repair in electrical, Plumbing, Refrigeration and Air conditioning, Civil works, Chiller and BMS, EMS operator, building management system, managing for manpower, Computer literate.

AGE: 44

SEX: MALE

BIRTH DATE: MARCH 25, 1979

BIRTH PLACE: LLORENTE, EASTERN SAMAR

STATUS: MARRIED

WIFE NAME: GILARMI BARQUERA ORIL

DAUGTHER NAME: ATIYA GILIAN BARQUERA ORIL

FATHER NAME: LEONARDO AMADO ORIL

MOTHER NAME: AURELIA GUIRA ORIL

NATIONALITY: FILIPINO

RELIGION: CATHOLIC

LANGUAGE: ENGLISH and FILIPIN

PASSPORT number: P7904080B

PASSPORT Expiry: 17-10-2031

QID Number: 279********

QID Expiry: 11-04-2024

I hereby certified that all information herein is true and correct to the best of my knowledge and belief. I authorize the firm to verify the data herein provide.

Alejandro G. Oril