CURRICULUM VITAE
Name: Carlito Quito Tolentino
Nationality: Filipino
Temporary Country/Relocation: Indonesia/Jakarta
Telephone: +62-21-251-**-** ext. 153
Mobile: +62-811-***-****
Company name /address: PT. FLSmidth-Indonesia
Wisma GKBI 21st Floor-Suite # 2101
Jl. Jend. Sudirman No.28, Jakarta 10210
Email: *******.*********@********.*** / *****************@*****.*** Permanent Home Address: 3-2B Noli Metangere Street, Josefa Ville 1, Clark View Angeles City. Philippines.
Post Code: 2009
My Philippine Contact Numbers: +639********* –For my wife
+639********* –For my Daughter
PROFILE
A senior Registered Professional Mechanical Engineer / Local Service Unit Manager with extensive experience developed within the heavy industries (Cement, Lime & pulp/paper). With the ability to manage change effectively to ensure excellent business performance in terms of the quality and delivery of service reliability. Being a manager I have the exceptional a first class reputation for not only achieving but also exceeding targets of promised deliverables. An outstanding track records of developing, implementing and project management strategies.
My core competencies acquired thru learnings and gained experienced of 32 years of mechanical engineering practice in the field of project management, services development and business strategies. Strong knowledge and implementation of plant Computerized maintenance management system, condition based monitoring knowledge and controlled the application of reliability centered maintenance. Acquired skills in the quality controls of steel plate’s fabrication strong implementations of welding procedures functions as welding inspector, strong knowledge and application of NDT procedures and applications of ITP (inspection test procedures).
Excellent interpersonal skills, organizing and motivating people. In depth knowledge of analytic trouble shooting Techniques (ATS). Lubrication and bag filter specialists.
Kiln specialist for comprehensive hot kiln alignment (CHKA). Knowledge and experience in SAP Data Conversion -- handling and migration of SAP PM Data from a local template to a multi-national standard.
Knowledge and experience in Data Conversion- handling and Maximo 4i PM /MM module. Well verse in Microsoft project planning 2010 version. COMPUTER LITERACY
• Well verse and user of MS Project 2010 version and
• Primavera Planner P3 version.
• Computerized Maintenance Management Systems (MAC,
• SAP-R3 PM/ MM Module, Maximo 4i PM/ MM Module).
• Well verse in vibration monitoring, analysis and evaluation Using the vibration mechanical analyzer SKF - CMVA 60 Micro log and CSI machinery analyzer 2120.
Awareness of ISO 14000 / ISO 9001
• Microsoft word, excel and use of power point, Microsoft visio.
CAREER SUMMARY
2014 – Present Company Name: PT.FLSmidth-Indonesia JOB TITLE: Local Service Unit- Manager
Description – Customer Service / Field Service / Technical Sales on Cement, Lime and Pulp/paper industries.
2008 – 2014 Company: ThyssenKrupp Polysius Shanghai Co. Ltd JOB TITLE: Senior Mechanical Engineer / Project Manager Description – Project Management /Service Development/Quality Assurance/OEM on Cement and Lime industries
2007 – 2008 Company: Al CEM ApS
JOB TITLE: Technical Consultant
Description – Project Management / Technical Sales and Services on Cement industries and Pollution controls
2004-2007 Company: Tabuk Cement Mfg. Company, Kingdom of Saudi Arabia JOB TITLE: Preventive Maintenance Manager
Description: Preventive/Predictive /Condition Base Monitoring/ Shutdown Planning 1990 – 2004 Company: Union Cement Corporation now Holcim Philippines La Union Plant JOB TITLE: Head of Lube & Baghouse and Preventive Maintenance Planning Description: Preventive/Predictive /Condition Base Monitoring/ Shutdown Planning 1985-1987 Company: Saudi Kuwaiti Cement Mfg Co. now Eastern Province Cement JOB TITLE: Operation Supervisor in packing plant /bulk loading Description: Packing plant and bulk loading
1982 -1985 Company: Texas Instruments Philippines, Loakan Road, Baguio City JOB TITLE: Cadet Equipment Engineer
Description: Line support and set up
ACHIEVEMENTS
• On-going business development in order to surpass set budget and goals increase by 5~10 % sales volume in CY 2015 to 2016 with in FLSmidth - Indonesia to FLSmidth support global sales.
• Introduced of Polscan and Polgrinding in Mainland China develop business strategy on Services In Thyssenkrupp Polysius Shanghai Co. Ltd in CY2012 -2013 after my hands on training in Germany.
• Increase reliability factors in Kiln and FM in Tabuk Cement Company in KSA. From 70 to 85 % by strict implementation of Condition Base Monitoring per major equipment’s. Streamlined classification of lubricants & strict implementation change oil intervals of major reduction gear boxes Crusher to packing plant.
• Reduced the emission levels in ESP, Bag Filters from 200 mg /NCM to below 50 mg /NCM in HOLCIM Philippines.
• Increase Kiln Capacity by retro fitting of our existing cooler of conventional type to fix inlet design by ABC type of FLS from 2200 TPD ~2500 TPD.
• Eliminated costly maintenance of Kiln due to vibration supervised in place machining of kiln tyre by Local contractor thereby we eliminated costly maintenance and saved 11 Million Php in HOLCIM Phils in 2000.
OBJECTIVE
To be able to impart my best practice lessons learned in my previous organization and able to impart my gain knowledge, experience and expertise to strengthen the roles that bestowed to me in organizing,planning scheduling and implementation to become a cost effective and profit centre organization. CAREER HISTORY
September 2014 to present Company: PT- FLSmidth -Indonesia JOB TITLE: Local Service Unit - Manager
Details of responsibilities and achievements
• Establish, Manage & Further Develop the Local Service Unit (LSU) offering of FLSmidth.
• Manage day to day Operations of the LSU facility & LSU personnel Achieve sales targets & established goals of the business.
• Ensure that the value adding of the LSU is realized.
• Coordinate activities between local key customers to the larger FLSmidth organization.
• Describe the work site, location, and where most of the time is spent.
• Develop a sustainable after sales service business.
• Drive our service offerings, within predictive and preventive maintenance with the goal of setting the industry standard in the area
• Pro-active customer contact and follow-up, both within ongoing maintenance projects including establishment of service agreements
• Market research and analysis – competitor benchmarking, stakeholder mapping – ensuring complete knowledge of the service value chain
• Drive sales leads and opportunities to the remaining organization through FLSmidth’s management systems.
• Develop internal relationships within FLSmidth’s regional & global network of sales and technical support personnel’s.
• Assist Customer Service Department management with business development plans, revenue Forecasting & financial reporting
• Engage & Manage suppliers & sub-contractors to progress business initiatives with beneficial outcomes for FLSmidth & customer alike.
• Hiring and training of LSU Service Engineers as well as continuous development of a proactive and technically competent team within the framework of FLSmidth’s service product portfolio
• Tracking of service offerings and follow-up; ensuring that customer required maintenance packages are available and procedures are strictly followed in the individual areas.
• Participate in industry-related conferences as well as establish a solid customer network in the local area
• Protect and grow revenue associated with local Customer Service activities.
• Identify new and existing key relationships within our customers operations; coordinate technical
& commercial communication regarding FLSmidth’s capabilities and overall competencies.
• Liaise with Regional Sales Team to efficiently & effectively coordinate FLSmidth activities.
• Evaluation & Realization of opportunities which lead best to the fulfillment of FLSmidth’s corporate Vision of “One Source”
• Engage and Manage all stakeholders across the many & varied management levels within our customers organizations (holistic customer relationship management).
• Cooperate & co-ordinate with regional authorities (as required) according to local regulations
• Plant visits on all potential clients presents value offerings concept.
• Present maintenance philosophy concepts on predictive and preventive of FlSmidth offerings to the market.
• A maintenance strategy in that will help client in optimizing their spare parts inventory thereby increasing the plant efficiency and minimizing maintenance costs.
• Bringing all different specialists with their respective competencies to cater the needs of our clients in cement, minerals and pulp & paper industries. ACHIEVEMENTS:
• Open opportunities for services in Fertilizer industries and able to supply parts.
• Able to open opportunities to supply services into Non FLS equipment’s in Cement and Pulp paper industries in CY 2014 -2015.
• Develop a strategy plan with in the coordination of major service provider. October 2008 - June 30, 2014 Company: Thyssenkrupp Polysius Shanghai Co. Ltd. JOB TITLE: Project Manager
Details of responsibilities and achievements
1. My main responsibilities as a Project Manager;
Plan, execute, and finalize projects according to strict deadlines and within budget. This includes acquiring resources, coordinating the efforts of team members and third-party Contractors Chinese local manufacturers, logistics, control projects according to plan. Define the project’s objectives and oversee quality control throughout its life cycle. Main task is to coordinate and control of the whole contract execution;
• Project Controls, Project execution plan (PEP).
• Review and ensure of detailed scope work and supply as according to frame work agreements.
• Planning (Time scheduling and delivery date).
• Claims and variations.
• Expediting and progress reporting.
• Interaction with purchasing, quality assurance and engineering. Project Handled:
Project Manager for PFR (Parallel Flow Regenerative Lime Kiln by Maerz) project for Lima PERU supervised and managed the manufacturing of panel claddings and roofing’s. Project Manager for the fabrications of kiln housing ventilations for PFR same client in Lima, PERU.
Project Manager - Service Development Department (January 2011 up to July 2013) Review client’s requirements on Services, submit proposals and quotations. Project Manager for POLSCAN –Kiln Geometry services and POLGRINDING surface Grinding of support rollers and Kiln tyres.
Responsibilities:
• Conduct research on all prospective clients in all heavy industries where we can apply prospective product services.
• Communicate with the prospective clients and introduce services and conduct evaluation on their existing production lines.
• Demonstrate best practises where they can optimize their machineries by retro-fitting the state of the art technology using Thyssenkrupp Polysius Shanghai,Co. Ltd.s products.
• Monitoring of equipment rehabilitation services and evaluates the services implemented.
• Develop new services concept for new service product of Thyssenkrupp Polysius Shanghai,Co. Ltd.
• Develop Technical write up for the new services launched in Thyssenkrupp Polysius Shanghai,Co. Ltd. For Polscan – Kiln geometry, determination of kiln axis and center line 2. Temporary assignment as SENIOR QA Engineer November 2010 – January 2011 (3 months)
Definition of responsibilities and preparation
• Represent and assist the Departments in project meetings related to quality matters and evaluations.
• Request, organize and follow-up all necessary documents as per DOCUMENT TRANSMITTAL list prior to signing of contract and manufacturing schedule.
• Review of requirements for project organizational chart. Maintaining and displaying the latest organizational chart reflecting reporting routes and responsibilities of key personnel on the project.
• Ensure that material substitution list (MSL) is in compliance to Polysius request. Quality Assurance Manager to confirm.
• Discuss Material Substitution Lists related question at supplier and coordinate with material engineer (ME).
• Check manufacturing sequence plan (MSP) and discuss with Quality Assurance Manager QAM to confirm.
• Inspect incoming material and quantify according to purchase order. Collect and file readable copies of purchase order together with a report.
• Perform raw material inspection, collect and file material certificates. Ensure readable copies and furnish report.
• Review and check painting list. Collect painting certificates and coordinate with ME. Organize painter trainings together with service engineer of paint supplier.
• Collect and file WPS, WCL and WPQT. Coordinate to welding engineer (WE) on these documents. Quality Assurance Manager and Welding Engineer must confirm.
• Check and file welder certificate (Welding Procedure Qualifications). Ensure only the trained and certified will perform welding works. Check the performance frequently.
• Read, interpret and understand Polysius requirements including specification, work instruction and approved drawings to assure supplier’s compliance. Manufacturing
• Conduct shop/field in progress inspection works. Ensuring that all materials and parts are Identified based on working plans and specification proceedings.
• Develop procedures for project inspection and implementation.
• Conduct seminar, teach-ins and training for further development of the supplier.
• Inspect and monitor welding works. Check welding consumables, ensure the supplier are creating reports on weld tracing.
• Review and confirm hole drilling plan and procedures.
• Witness and record de-burring activities for cutting and hole drilling. Make sure that the supplier creates a reports.
• Perform supervision on mixing of paint and painting works.
• Witness, perform and record dimensional check activities.
• Witness tests and ensure that works are in accordance with the technical documentation such as parts lists and drawings and the manufacturing and inspection instruction.
• Write “Non Conformance Reports” for not conforming parts if necessary.
• Check and prepare progress reports.
• Organize and maintain all quality assurance documentation and files (ITP).
• Perform other duties that maybe delegated and agreed by his/her superiors (Project Manager, Contract Manager, additionally hired chief inspectors etc) Final Inspection
• Inspection of painting works. Ensuring the paint is in accordance with the partslist and finished items are properly stored.
• Ensure completeness of documents prior to inspections. Review Purchase Orders, Scope of Supply and Packing List.
• Carrying out inspection on all supplier and client. Prior to final inspection with client, supplier and Polysius will conduct a joint pre-inspection. Final inspection will be conducted with the client after all deviations, discrepancy and reworks are done.
• Communicate with Project Team and client about packing and tagging of supply parts and ensure supplier is following the instruction.
Project Handled relative to QA responsibilities;
• Conduct quality inspections for Quadropol steel plates, Liner plates for Itaver and Irpaver Projects supplied in Brazil.
• Quality inspections on conformity of Belt Conveyors at BEUMER supplied at Europe.
• Conduct quality inspections for bag filters steel plate works for Tuban projects supplied at Indonesia.
• Conduct quality inspections for liner plates supplied by magotteaux for Tabuk Cement Co. in Kingdom of Saudi Arabia
• Steel plates fabrication inspection for Quadropol supplied in Mexico. Thyssenkrupp Polysius Shanghai Co., Ltd October 2008 – April 2010 (1 year 7 months) 3. Project Manager - Balance of Plant Equipments
• Received tender documents from clients and review scope of work and drawings and technical specifications and engineering prior to implementation of project execution.
• Site Project Manager for the Belt Conveyors manufacturing supplied at Ohorongo Cement
• Plant in Namibia. Visited erection site in Namibia, Africa help in Technical clarifications of supplied steel plates by Polysius Shanghai.
• Site Project Manager for hoists and overhead crane manufacturing supplied in Namibia.
• Site supervision of hoists and overhead crane manufacturing supplied in Tabuk Cement Co. in K.S.A
Achievements:
to finished the project in Ohorongo Cement in Namibia two(2) months earlier ahead of the schedule the success is the joint effort of my Team which I stayed in the erection site help them sort out and Technically clarified delivery and missing parts issue for that we expedite and speed up the concerns just right on time.
• Have successfully launched the product services in Mainland China on Polscan or Hot Kiln alignment we pioneered the service in cement and also developed the Technical write up for Insitu grinding.
June 2007 – September 2008 Company : AL CEM ApS, Valby Denmark JOB TITLE: Technical Consultant (Middle East assignments) Head of Maintenance Engineering and Services
Details of responsibilities and achievements;
Cement plants evaluation, modernization of pollution controls and retro-fitting services Evaluation of pollution control /ESP/Bag filters / Plant Evaluation for possible improvements and modernization of pollution controls of the following as part of my job as Technical Consultant at the following;
Plant Evaluated in the Middle East regions;
1. Gulf Cement Co. Ltd, Grinding Plant in Qatar.
2. Arabian Cement Plant in Rabigh, KSA.
3. Yamama Cement Plant Co. in Riyadh,KSA
4. Amran Cement Plant in Sanaa,Yemen
5. Al Barh Cement Plant in Taiz, Yemen
6. Bajel Cement Plant in Taiz, Yemen
Job Description;
• Visit clients in the Middle East that AL-CEM ApS accounts and conduct evaluation of All pollution control equipment’s like ESP, GCT and bag houses.
• Provide technical support to delivery partners and customers in the Middle East. Managed system of evaluation and assess environmental concerns associated with Pollution controls and engineering applications.
• Conduct problem solving, analysis and proposed solutions to the problems related to Pollution control equipment’s.
• Discussed to clients the problem discovered on their pollution control systems and Come-up with recommended solutions.
• Reports and Coordinate in AL-CEM ApS main office in Denmark the Technical Documentations and results of the visit with clients.
• Modify and retro-fitting / modernization of pollution control equipments ESP, Bag Filters and GCT into FLSAirtech design.
Achievements:
Able to open opportunities retro fitting works in Saudi Cement Co. in Kingdom of Saudi Arabia Open opportunities in Qatar in Gulf Cement Company. Open opportunities in Bajel Cement and Amran Cement in Yemen March 2004 – May 2007 Company: TABUK CEMENT MFG Co. Duba, Kingdom of Saudi Arabia JOB TITLE: Preventive Maintenance Manager
Detailed Responsibilities and Achievements
PROJECT HANDLED:
• Erection of new parallel bag filter for alkali by-pass projects.
• Erection of New pre-grinding mill of clinker, turnkey project from KHD.
• Supervised / monitor regeneration and repair of pre grinding rollers (Fix / movable).
• Supervised the Kiln hot alignment and In placed machining of thrust roller Job description:
• Supervising the engineers and subordinates to ensure the quality, standards & control of works /budgets that has been performed and in accordance to the company’s standards
& requirements on preventive maintenance department.
• Validate maintenance programs in collaboration with the mechanical, electrical and civil engineering chiefs.
• Conducts studies at improving equipment reliability and maintenance performances.
• Responsible /ensure vibration monitoring of major equipments and minor equipments.
• Conduct dynamic balancing of all process fans using CSI 2120 mechanical analyser.
• Ensure the sustainability and implementation of Maximo 4i, CMMS (Computerized Maintenance Management System) in accordance with ISO 9001.
• Responsible in the handling projects and maintenance planning, scheduling for preventive and scheduled periodic shutdown of the whole plant machineries from Crusher to Pyro-processing lines.
• Responsible in the special projects, research and development in improving equipment Life reliability factor.
• Managed and control preventive maintenance department.
• Managed and control condition base monitoring and plant periodic shutdowns.
• Managed and control in-house commissioning prior to acceptance and handover to operation of newly installed and newly rehabilitated equipment’s.
• Managed and controls equipment reliability factors from Crusher to packing plant.
• Managed and control department KPI.
• Coordinate and interface to the cross functional Team in Maintenance Department. ACHIEVEMENTS:
• Increase reliability factors in Kiln and FM in Tabuk Cement Company in KSA. From 70 to 85 % by strict implementation of Condition Base Monitoring per major equipment’s. Streamlined classification of lubricants & strict implementation change oil intervals of major reduction gear boxes Crusher to packing plant.
March 1990 – February 2004 Company : Union Cement Corporation now HOLCIM La Union Philippines,Bacnotan
JOB TITLE: Head of Lube & Baghouse and Preventive Maintenance Planning
In my early years stay in Bacnotan Cement Plant now Holcim Philippines I worked and handled several positions in Maintenance (Mechanical, Preventive as well as Project and retro fittings in Cooler, VRM,CM and Crusher.
Direct management controls.
Responsible and managed preventive maintenance planning and controls department budget on capital expenditures (CAPEX and equipment upgrading). Controls and ensure equipment lubrication and bag house maintenance section. Ensure and implement the condition base monitoring system of the whole plant from crusher to packing plant.
Coordinate and seats with the cross functional team for the integration of master planning schedule on shutdown during Scheduled periodic shutdown (SPS). Managed and control department KPI.
Ensure proper planning of scheduled periodic shutdown, consolidation of major repairs . Coordinate / interface with civil, electrical and instrumentation to tie-up to the major Maintenance planning during long shutdown and major repairs from Crusher to pyro processing. Full implementation of CMMS (Computerized Maintenance Management System in SAPR3and using the MS Project and Primavera Planner P3 version. PROJECT HANDLED:
• Erection of new bag filter for Top pre-heater tower.
• Conversion / up grading of Fuller Vertical Roller Mill into LV – Technology.
• Conventional cooler of Fuller up graded into FLS fix inlet design to improve cooling Efficiency by at least 30% thereby increased the production volume.
• Designed of auto lubricator system for clinker cooler, coal mill master gear and pinion.
• Installed multi stage pump for main water source plant cooling system and domestic need of the plant. Design new piping lay-out for main source power supply.
• Conversion of mechanical bag filter to jet pulse design.
• Supervised the repairs In place grinding of Kiln tyres, support rollers and thrust roller. Job descriptions:
Conceptualize, evaluate and manage the implementation of improvement projects that;
• Generated savings and reduced maintenance costs,
• Improved overall equipment efficiency O.E.E (both rate and availability).
• Sustained plant’s Occupational Health & Safety program.
• Helped reduce the maintenance of equipment.
• Sustained and improved condition of plant facilities. Managed the provision and implementation of program for Condition-Based Maintenance System that supported the production and maintenance through;
• Increased equipment availability and performance,
• Effective Root Cause Failure Analysis.
• Supervises and ensure the set KPI are met (i.e. the plan attainment and over all equipment efficiency O.E.E @ KILN, RM and CM.
• Supervises and ensure proper planning maintenance programs of the plant are implemented on lubrication system and bag houses, equipment base monitoring of production plant machineries in accordance to the standard and requirements of HOLCIM.
• Supervises and ensure the route inspection and vibration monitoring of Major and auxiliary equipment’s are followed.
• Supervises and conduct dynamic balancing of all process fans from Crusher to packing plant using CMVA 60 micro log of SKF.
ACHIEVEMENTS
Major accomplishments while handling the position involved plant capacity up-grade of Union Cement Plant clinker production line from 2200 tons per day to 2500 tons per day of clinker. Spearheaded the planning and implementation of retrofit projects on raw mill classifier, clinker cooler inlet system, and clinker dust collection system which achieved such a peak in production volume.
Able to reduce the emission levels in ESP, Bag Filters from 200 mg /NCM to below 50 mg /NCM in HOLCIM Philippines.
April 1985 – February 1987 Company: Saudi Kuwaiti Cement Mfg Co, Now Eastern Province Cement Kingdom of Saudi Arabia
JOB TITLE: Operation Supervisor
My first Cement plant career a Krupp Polysius Equipments
.
Job description;
• Responsible in Packing Plant operation, cement loading dispatching and bulk loading
• Responsible in the operation of packing plant, cement mill and control room.
• Handled control room operations and packing plant operators makes inventory Controls of cement bags pack and loaded in the shift.
• Prepare status report of equipment performance and coordinate with maintenance group Regarding the abnormality incurred in the shift.
• Prepare production report and interface with my control room operation reliever. December 1982 – March 1985 Company: Texas Instruments Phils Inc. Loakan Road, Baguio City –Philippines
JOB TITLE: Equipment Cadet Engineer
• Responsible in Line support and Maintenance repairs at Finish area.
• Mold / die installation and repairs.
• Symbolizer machines and Trim/ form press repairs.
• Installation and set-up of Mold press / Trim & form press, hydraulic press
• Assist in the pneumatic installation of all symbolizer machines.
• Responsible in line trouble shooting repairs and maintenance of Mold press, Trim/Form press and symbolizer machines in finish area.
• Responsible in the machine set up and installations, maintenance of centralized conditioning unit.
• Prepares daily works schedule and weekly preventive maintenance plan.
• Responsible in the tool and die machining of trim / form press dies used in cutting of lead frames.
QUALIFICATIONS
College: Saint Louis University, Baguio City-Philippines Degree: Graduated Bachelor of Science in Mechanical Engineering(B.S.M.E) LINSENCURE EXAMINATIONS PASSED;
1. Registered Mechanical Engineer Board examinations held in April 1982 in Philippines Lic. No. 23228
2. Registered Professional Mechanical Engineer for Senior License Board examinations held in April 2003 Lic. 4005.
3. Registered ASEAN Engineer screen /passed the criteria for Mechanical specialization Lic. No. 417 conferred in Singapore December 2009. 4. Registered APEC Engineer –Philippines screen /passed the criteria for Mechanical specialization with in the Mutual agreement of Washington accord. Lic. ME-51 given February 2013 in Philippines. OTHERS:
1. Certified Program Leader for KEPNER/TREGOE a concept rational for Analytic Trouble Shooting( Problem Solving and Decision Making) awarded by Manila Executive Consultants and Kepner Tregoe international of Princetown New Jersey U.S.A. November 1996.
2. Certified Junior Kiln specialist for Hot Kiln Alignment on Cement, Minerals and pulp and paper industries March 2015.
PROFESSIONAL MEMBERSHIPS:
1. Life Member: Philippine Society of Mechanical Engineers (PSME). 2. Life Member: Association Federation of Asean Engineers Organizations (AFEO). 3. Regular Member: Association of APEC Engineers Registers – ASEAN /APEC Region SEMINARS AND TRAININGS ATTENDED;
• CONFERENCE OF ASEAN FEDERATION OF ENGINEERING
ORGANIZATIONS 2009( Cafeo 27) - Attended in Singapore – Theme Engineering for Sustainable Environment on 30 November – 2 December 2009.
• CEMENT PLANT EQUIPMENT AND PROCESS KNOW-HOW a training program sponsored by Polysius Academy – held in Polysius Head Quarters in NeuBeckum, Germany on December 08-12, 2008.
• GRINDING TECHNOLOGY- MECHANICAL DESIGN AND OPERATION OF GRINDING PLANTS a training program sponsored by Polysius Academy – held in Polysius Training room in Polysius Shanghai, China on October 20-31. 2008.
• CEMENT TECHNOLOGICAL SEMINAR a training program sponsored by ALCEM ApS / FLSmidthAirtech held in Sanaa Republic of Yemen on May 20-23, 2008.
• SAP R3 - SYSTEMS ANALYSIS ON DATA PROCESSING Held at Union Cement Corporation, La Union plant on September 21-27, 2001.
• MACHINE FAILURE ANALYSIS AND PREVENTION Held at Don Felimon Rodriguez, Training Center, Tagaytay City on April 26, 2001.
• PREVENTIVE MAINTENANCE AND REPAIR WELDING TECHNOLOGY IN CEMENT TECHNOLOGY IN THE CEMENT INDUSTRY Held at Union Cement Corporation, Bo. Quirino, Bacnotan La Union on November 09, 2000.
• MAC AWARENESS TRAINING SEMINAR Held at Union Cement Corporation, Bo. Quirino, Bacnotan, La Union on August 31- September 01, 2000.
• INTRODUCTION TO PREDICTIVE MAINTENANCE Held at Union Cement Corporation, conducted by SKF Philippines on August 14-16, 2001.
• MAINTENANCE COURSE SEMINAR ON CEMENT MANUFACTURING Held at Union Cement Corporation-Davao Plant, Bo. Ilang Davao City on August 14-16, 2001.
• PYRO-PROCESSING OPTIMIZATION SEMINAR Held at Union Cement Corporation, La Union on March 28-31, 2000.
• THE FULLER INSTITUTE