Post Job Free
Sign in

Start Up Document Control

Location:
Sumter, SC, 29150
Posted:
April 16, 2024

Contact this candidate

Resume:

Valerie Vaughn

** ****** ******

Sumter, SC, ****0

803-***-****

Objective Summary: 15+years of work experience in the production Industry. Dedicated to maintaining company policies and standards for producing quality parts. Work Experience:

Inspector/Sorter, at Metal Finishing Services.Sumter,SC July 2011- August 2020

● -All nuts are inspected for imperfections such as no thread, bad cut off.

● -Nuts (different sizes) are loaded into metal racks,racks are sent

● down a processing line in which all nuts are chemically nickeled

● coated inside, then through a rinse cycle.

● -Next nuts are dried in a timed heat cycle,at the end of the cycle

● all nuts are inspected for proper coating,free of peeling or blisters

● Inside the thread.

● -Nuts are wired brushed to remove burrs leaving a smooth surface,

● packed and labeled to identify quantity and nut size. Weld Operator/Packer, at Midwest Stamping. Sumter,SC November 1999 - April 2011

● -All Parts are 100% inspected to be free of rust.lamination. edge damage,

● and surface imperfections, before start up of operation.

● -Weld and check 1st piece of every part type on calibrated gages and thread

● gage,for production approval.

● -Fill out and complete Quality Process Form for every part type, before start up

● of production.run.

● -Inspect labels for accurate information, customer part number and quantity.

● -Always met or exceeded production quotas.

● Packer Shipping Area

● -Verify scale weight at start up of shift.

● -Parts are packed in proper containers, boxes,etc.

● -Verify part number and quantity on labels, before attaching label to container or box.

● -All part numbers are documented on the document control log.

● -All parts are 100% inspected, with zero defects to meet all customer satisfaction.

● -Following procedures, allows for the production of good quality parts

● sent to the customer every time.

Caterpillar Hydraulics Manufacturing Facility

Sept 2021- April 2023

Medium Thread

● At the start of shift check off OPM sheet, make sure gages, scissors and all other

● tools are visible in the work area.

● Floor is free of tripping hazards.

● Check to make sure the head and piston part number match.

● All components are checked for dirt, rust,gouges.

● Head and pistons are demagnetized and washed.

● Follow the standard work procedure for applying all proper seals

● onto the heads and pistons.

● Packing parts

● Follow the packing procedures.

Bolten-Kitting

● All parts materials are gathered for assembling onto cylinders.

● Each operation number has its own materials for completion of a cylinder.

● Head and piston

● Rod built

● Group built

● Test stand

Caterpillar Precision pins Facility

April 2023 - Oct 2023

Packer

Pins are oiled and packed into proper crates or boxes according to customer order and sent to shipping.

Education:

August 1988 - March 1990 Central Carolina Technical College Studied Office Systems Technology.

Personal References:

Frances Smiling

377 Wyoming Dr.

Sumter,SC 29150

803-***-****

Destyni Burgess

336 West Hampton

Sumter,SC 29150

803-***-****

Denise Lemmon

189 Wall Street

Sumter,SC 29150

803-***-****



Contact this candidate