Post Job Free

Resume

Sign in

Construction Site Student Activities

Location:
Qibla, 14, Kuwait
Posted:
April 15, 2024

Contact this candidate

Resume:

FADI CHACCOUR

Mobile :+974-********

+965-********

ad40px@r.postjobfree.com

Experience

August 2016 – Till Now Societe d’Entreprise & de Gestion (SEG) Kuwait, Kuwait Position: Survey Manager

Project Description:

Sabah Al Salem University City – Kuwait University - SAAF Project (Student Activities & Athletic Facilities

Athletic recreational and aquatic center.

Grand stadium and outdoor sports facilities.

Indoor tennis court.

Student union.

Public transportation station.

Package 1 – Student Activities and Athletic Facilities ( 9 Buildings ) Package 2 – Grand Stadium and Tennis Center

Value of Contract: (162,617,478.624 KD)

The works comprises construction,completion test & commission .

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using CIVIL 3D Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other February 2014 – August 2016 Societe d’Entreprise & de Gestion (SEG) Doha, Qatar

Project Description:

Construction of Kahramaa New Tower (Kahramaa)- Doha,Qatar Construction of Boulevard Mall- Doha,Qatar

The works comprises construction,completion test & commission .

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using CIVIL 3D Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other February 2013- till August 2014 Societe d’Entreprise & de Gestion (SEG) Doha, Qatar FADI CHACCOUR

Mobile :+974-********

+965-********

ad40px@r.postjobfree.com

Project Description:

Construction of Four New Schools (Ashghal)- Doha,Qatar The works comprises construction,completion test & commission .

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using CIVIL 3D Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other January 2012 – November 2015

Project Description:

State Audit Bureau Headquarters - Doha,Qatar

Twin Towers,Office & Residential,4 Basements + GF + 31 Storey Building .

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using CIVIL 3D Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other December 2008-till December2011

Project Description:

EPIC for Ras Laffan Emergency and Safety College, Qatar Project consists of 19 buildings and fire station complex, 37 training props and Fire water treatment plant with all necessary services, Area 1,000,000 m, Value: QR 2.0 Billion.

Job Description:

Responsible for all survey works pertaining to site development plan such as:

- In-charge with the use of the major survey instrument utilized in the field.

- Establishment of horizontal and vertical control points for fixed reference points using GPS(Trimble) and total station Leica.

- Conduct topographic survey.

- Profile and cross sectioning of areas covered by site construction area to determine portion to be cut or fill for preparation of monthly progress accomplishment for monthly progress billing.

- Lay-out and as-built all structure facilities based on designed plan such as: LPG gas pipeline, portable water pipe line, drainage pipe line and other underground facilities.

- Lay-out and setting out of vertical and horizontal alignment of Roads.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- Download, edit and process of data using Leica survey office for total station.

- Processing and plotting of data using LAND DESKTOP and LISCAD. FADI CHACCOUR

Mobile :+974-********

+965-********

ad40px@r.postjobfree.com

Feb 2009 – May 2010

Project Description:

Nakilat - Ship Repair Yard,Ras Laffan Qatar

Project consists of onshore works.

Job Description:

Responsible for all survey works pertaining to site development plan such as:

- In-charge with the use of the major survey instrument utilized in the field.

- Establishment of horizontal and vertical control points for fixed reference points using GPS(Trimble) and total station Leica.

- Conduct topographic survey.

- Lay-out and as-built all structure facilities based on designed plan such as: LPG gas pipeline, portable water pipe line, drainage pipe line and other underground facilities.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, windows, stairs, other concrete structure,mechanical layout .

- Download, edit and process of data using Leica survey office for total station. Feb 2008 – Oct 2008

Position: Chief Surveyor

Project Description:

Khalifa Hotel-Sports City, Doha Qatar

Luxurious Hotel: 1 basement, GF+3 Upper Roof, Area 17289m .

Job Description:

- In-charge with the use of the major survey instrument utilized in the field.

- Establishment of horizontal and vertical control points for fixed reference using LEICA total station.

- Profile and cross sectioning of areas covered by site construction area to determine portion to be cut or fill for preparation of monthly progress accomplishment for monthly progress billing.

- Lay-out and setting out of vertical and horizontal alignment of concrete bridge.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- Processing and plotting of data using AUTOCAD.

April 2007 – Feb 2008

Project Description

Navigation Tower - Doha,Qatar

2 Basements + GF + 52 Storey Building – Parking 5 floors.

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using LAND DESKTOP Establishment of horizontal and vertical control points for fixed reference using total station and automatic level. FADI CHACCOUR

Mobile :+974-********

+965-********

ad40px@r.postjobfree.com

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other . Feb 2005 – April 2007

Project Description

SARA TOWER & 1 DIPLOMAT TOWET &QNB HEAD QUARTER & G+7 Residential Building - Doha,Qatar .

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using LAND DESKTOP Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other . Sep 1998 – Feb 2005

Position: Chief Surveyor ED. ZUBLIN AG BEIRUT,

LEBANON

Project Description

Lebanese University Campus, Beirut Lebanon.

Project Consists nearly 800.000m2 corresponding to 18 buildings, sport complex, 150.000m2 of tiles, 150.000m2 of roads and parking, 2km tunnel, 50km irrigation pipes, 11km ductile iron pipes, 30.000m storm and sewer pipes, 85m height Water Tower

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using LEICA software for as built drawing.

- Processing and plotting of data using LAND DESKTOP Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout.

- As-built all structure facilities based on design plan such as: Core Wall, other .

- Controlling and allocating tasks to the surveying teams and the follow up of all survey works.

- Checking and setting out for construction and external works,

- Installation of reference points and benchmarks, data preparation, this included more than 1.000.000m3 of volume calculation, liaising with quantity survey department for monthly certificates.

Jun 1994 – Sep 1998

Position: Chief Surveyor Mr. Charles Boutros Office. BEIRUT, LEBANON

Project Description

FADI CHACCOUR

Mobile :+974-********

+965-********

ad40px@r.postjobfree.com

Road Study, Channelling, Plot Layout, Contour Lines, Division into Lots, Delimitation, Piling at the

Beirut Airport for Dive Master International, contour lines (Riviera and Movenpick Hotel).

Job Description:

- In charge with the use of the major survey instrument utilized in the construction site.

- Download, edit and process of data using Sokkia software for as built drawing.

- Processing and plotting of data using LAND DESKTOP Establishment of horizontal and vertical control points for fixed reference using total station and automatic level.

- Lay-out and setting out of vertical and horizontal alignment of Roads. Education:

- Diploma in Topography/Lebanon 1998 TS3

- Diploma in Topography /Lebanon 1995 BT3

- Certificate in Autodesk Civil 3D 2015

- Lebanese Baccalaureate (Mathematics),Lebanon: 1990.

- Sworn Surveyor for the Ministry of Finance ( Cadastral Sector ) accredited since November 27, 1996

- Certified Surveyor for “Ordre Des Topographes since 2002 under Nº1057. Nationality LEBANESE

Birth Date 11-02-1972

Family Status Married

Computer Skills MS Office (Word, Excel), Auto CAD Civil 3D, Liscad. Languages Fluent in Arabic, French and English.

Hobbies Sports, Reading and Travelling.

Engineering Degree Diploma In Surveying

Year of Pass 1995

Total experience 26 years

Experience in Construction 21 years

February 2005-Present Societe d’Entreprise & de Gestion (SEG) Doha, Qatar

Position: Head Of Survey Department



Contact this candidate