Post Job Free

Resume

Sign in

Safety Manager Vice President

Location:
Waianae, HI
Salary:
$110,000.00 annual
Posted:
February 25, 2024

Contact this candidate

Resume:

Name:

Proposed Assignment to this

Project:

Name of Firm, Position Held,

Dates of Emolovment:

Previous Firms:

Educational Background (Year,

Degree, Specialization, Name of

U.S. Accredited University:

Professional Registration (if any):

(Year, State, Discipline)

Training Courses Completed:

Reynard H. Burgess, STS, CHST, CHSP

Site Safety & Health Officer Level 5

Site Safetv Manaoer

RTS Consulting Inc.

Site Safetv & Health Officer, Level 5. 5/19/2020 to Present BCP Construction Inc. Isolate Drains and Repair/Recoat Floors Hangar 2030 2019 - 2020

Watts Constructors, LLC, SSHO Level 5, 2016 -2019

Environet lnc./GSI, SSHO Level 5, 2016

Ansaldo Honolulu Joint Venture, Construction Security & Safety Manager, 2015 - 2016

Raising the Standard (HI) Inc., SSHO Level 5 Safety Consultant, 2014

-2015

Goodfellow Bros. Inc., Hawaii Safety Manager, 2011 - 2014 Parsons PCG, Division Safety Manager, 2005 -2011

KD Construction, Inc., Safety Director, Vice-President, 2000 -2005 State of Hawaii, Safety Compliance Officer, HIOSH, DUR, 1997 - 2000 State of Hawaii, Dept. of Transportation, Labor Foreman 1995-1997 Vice-President/ Safety Director Pacific Interior 1993-1995 MAC Construction Inc., Safety Administrator, 1989-1993 Field Supt, Supervisor, QC Manager, Foreman, Journeyman, 1989 - 1970

1968, (no degree) Business Administration, University of Hawaii 1969, (no degree) Cultural Anthropology University of the Pacific 2008, University of Southern California, San Diego OSHA Training Institute Certified Health and Safety Professional CHSP

Certified Construction Health and Safety Technician (CHST) Certified Safety Trained Supervisor Construction (STS-C) Certified by American Board of Industrial Hygienist (ABIH) Certified by Certification Committee for Health and Safety CCHEST Certified Health and Safety Professional (CHSP) - OSHA Training Authorized OSHA Training Institute Instructor {taught University of California, San Diego -Pacific Training Center, Chaminade University program -Hawaii, and OSHA 10 and 30 Hour Instructor) Taught CCHEST classes for both the Safety Trained Supervisor and Certified Health and Safety Technician designations NAVFAC/COE Construction Quality Management for Contractors First Aid/ CPR/AED Instructor

Wilderness and Remote First Aid Instructor

Familiar with the COE EM-385-1- Yes

1 and Hazard Identification and

Safety Compliance

Provide a list of projects that were completed by the key personnel. Provide contract project title, contract amount, role in project and description of the contract scope of work: PROJECTS

Repair Renovate Building 452

BCP Construction.

Contract Value 5.8 Million

Start: 11/7/2019 3/4/20

Page 1 of 5

for military personnel and their dependents while the permanent medical hospital is to be designed and drawn for bid purposes.

Wounded Warriors Project, Schofield Barracks, Oahu, HI* Raising the Standard (HI) Inc.

Contract Value: $5 million

Project Role: SSHO Level 5

Start/Completion Dates: 06/14- 02/15

This project involved building a new 150,000 SF facility to assist wounded and impaired veterans from the Iraq, Afghanistan, and Middle East conflicts to successfully deal with physical and mental wounds suffered from these conflicts.

Forrest City HMC Camp Catlin, Halsey Terrace, MaGrew Point, Maloelap, Catlin, Mololani/KMBH, HI*

Goodfellow Bros. Inc.

Contract Value: $225 million

Start/Completion Dates: 02/12- 05/14

Project Role: SSHO Level 5

Forrest City contracted with the Navy to develop eight new housing communities in 36 Oahu neighborhoods (from Honolulu to Kaneohe, and Kauai) to lease back to the Navy. The endeavor involved the completion of 3,085 new homes and renovation of 1,507 homes for military families. The project included three Net Zero Energy homes and earned 20 LEED certifications, as well as one neighborhood development award (ND) for the Wailuku community. Facilities included larger, more comfortable and efficient homes, as well as community centers, swimming pools, playgrounds and dog parks. BAX MATOC Schofield Barracks, Oahu, HI*

Goodfellow Bros. Inc.

Contract Value: $55 million

Start/Completion Dates: 11/11 - 04/13

Project Role: SSHO Level 5

This project consisted of providing UXO Clearance and Removal at the West Firing Range at Scofield Barracks. The project included roads, building firing targets, establishing fire lanes, as well as building fire control buildings, towers and control systems including offices, training facilities, parking lots and restrooms.

Repair Force Main Pearl Harbor to Fort Kamehameha, Pearl Harbor, HI* Goodfellow Bros. Inc.

Contract Value: $1.8 million

Start/Completion Dates: 08/1 O - 05/12

Project Role: SSHO Level 5

This project encompassed the removal and replacement of the 16" force main from MH Pearl Harbor to the Sewer Facility at Fort Kamehameha.

Replacement Housing Units, Marine Corps Base Hawaii, Kaneohe, HI* Parsons PCG

Contract Value: $2.8 million

Start/Completion Dates: 02/08 - 07/1 O

Project Role: SSHO Level 5

This project involved the removal/demolition of eight duplex housing units and building replacement with 12 new units as designed in the specifications.

Religious Ministries Facility, Marine Corps Base Hawaii, Kaneohe, HI* Parsons PCG

Contract Value: $3.3 million

Page 3 of 5

Project Role: SSHO Level 5

Complete renovation of Quad including improvement of structural members, removal and replacement of asbestos and lead while maintaining historic architectural styling. New plumbing, electrical, HVAC, and fire control.

Isolate Drains and Repair/Recoat Floors Hangar 2030

(Historically Sensitive)

BCP Construction Inc.

Contract Value: $583,000

Start: 10/2019 Complete:

Project Role: SSHO Level 5

Remove impediments in storm drains on runway surrounding Bldg. 2030H. Clean, Repair and Replace drainage system on roof of Building 2030H. Recoat concrete floor of Building 2030H with resin coating while maintaining the historic value of bullet holes created on 12/07/1941. Building 409 NMT Multiband Terminal Antenna #3, JBPHH Wahiawa Annex, Oahu, Hawaii BCP Construction Inc.

Contract Value: $1,330,807

Start: 8/2019 Complete: 10/2019

Project Role: SSHO Level 5

Construct new site for the construction of a new NMT Multiband Antenna Terminal for the NSC at their Wahiawa Annex site.

Group 24 W2 through 5 Magazines, Roof Repair, JBPHH, Hickam, West Loch, Oahu, Hawaii BCP Construction Inc.

Contract Value: $2,132,697

Start: 4/2019 Complete: 8/2019

Project Role: SSHO Level 5

Provide waterproof protection for the roofs of (19) Ammunition Magazines located at West Loch, Pearl Harbor

Aircraft Maintenance Renovation, Hanger 101, MCBH, Kaneohe Watts Construction

Contract Value: 40 Million

Start: 10/2016 Complete: 4/2019

Project Role: SSHO Level 5

Major renovation of Hanger 1 including utilities, offices, installation of new office space, upgrades of existing interior work space, upgrades of sewer, water, electric, and communication systems. Dry Dock #2 Pump Well Structural and General Repairs, Pearl Harbor Naval Shipyard, HI* Environet lnc./GSI

Contract Value: $5.5 million

Start/Completion Dates: 07/16-10/16

Project Role: SSHO Level 5

This project involved the removal, repair and replacement of generators and pumps #1, #3 and #4 at the Pump well for Dry Dock #2 including lead abatement, structural repair, sewer repairs and refurbishment of facilities.

Temporary Medical Facilities, Marine Corps Base Hawaii, HI* Ansaldo Honolulu Joint Venture

Contract Value: $3.5 million

Start/Completion Dates: 03/15-07/16

Project Role: SSHO Level 5

This oroiect was the construction of a 30,000 SF temoorarv medical buildinQ to facilitate short term care Page2 of5



Contact this candidate