Post Job Free

Resume

Sign in

Project Management Development Engineer

Location:
Lagos, Nigeria
Posted:
February 23, 2024

Contact this candidate

Resume:

OLUSEGUN OLUWATIMILEHIN

Engineering/Construction/Equipment Installations /Infrastructure

Development/Project Management

Experience: 18 years Available: Immediately Location: Nationwide ad3uwn@r.postjobfree.com

+234**********

I am a passionate experience Telecommunications Infrastructures development Engineer. My Love for what I do drives me to always aspire to beat the best to be the best. I challenge myself regularly to attain higher levels of achievements on every project and or tasks. This has led me to always develop new skills on my own for better achievements of company overall goals.

I am ambitious and Success driven. I always strife to do better things better. This led me to greatly reduced the delivery period of project time line in my former job. The client was greatly impressed and the company was rewarded with more contracts awards.

I am an excellent team player and I naturally take on leadership responsibilities for the betterment of the overall goal of the company.

I 'm also a quality person. I derive satisfaction not only on timely delivery of projects, but also on quality of projects delivered. I take a lot of pride in the esthetics of engineering project I manage and deliver. BAS CONSULTING ENGINEERS (for ATC Nigeria)

Mid level PMC ELECTRICAL ENGINEER

LAGOS, Nigeria

2023-07-01 Currently working here

Monitor Telecom engineering projects - Fibre trenching, Fibre ducting, Fibre splicing, Cell sites developments to ensure adherence to engineering standards by build vendors. Identify punch points.

Instruct correction of snags to be corrected within 72 hours. Check site access road

Check site environmental compliance

Check Generator Placements on plinths.

Check earthing termination across all equipment. Measure earth resistance readings. If readings fall higher than specified value, recommend technical steps to bring value to safe range,

ABOUT ME

WORK EXPERIENCE

Check DC system installation cable termination inside rectifier including the Lithium ion batteries - LIB

Power up the rectifier and the LIB and check display monitor. Check site power system works in hybrid mode.

Schedule joint handover and acceptance signoff with operations team (for site build projects) or Client team (for Fibre Projects) and build vendors. Coordinate the handover exercise, take note and report punch points. Instruct correction of snags to be corrected within 72 hours. BELL - X NIGERIA LTD

Senior level PROJECT/SITE MANAGER

LAGOS, Nigeria

2008-07-01 Currently working here

Responsibilities:- Carry out Site Technical Site Survey (TSS), Site Establishment (SE), Telecommunication Base Station Infrastructure development and commissions including but not limited to civil works, power equipment deployment. Alternative power solutions provisions as well as connections of base stations to national grid. Achievements:- Quality and timely delivery of snag free projects. Position Held Project Manager – Fibre Expansion:- Job Description *Carryout route survey.

*Prepare/Supervise route drawing using AutoCAD *Prepare BOQ based on route survey report and drawing. *Prepare comprehensive site budget and material quantities. * Interview and approve subcontractors for trenching/ducting jobs. *Supervise/coordinate subcontractors during trenching/laying of HDPE to client specifications and standards as well as planting of manholes. *Supervise subcontractors during casting Achievements:- Greatly reduced the cost and the time line delivery of the civil implementation of the project.

Position Held Project Manager – PHCN Installations Job Description *Carryout TSS of the proposed route. *Prepare site drawing using AutoCAD *Prepare list of material quantities required for the high voltage installation. *Liaise with PHCN to obtain relevant permit for the extension of Electricity supply to the BTS sites. * Coordinate suppliers to ensure that material with required standard are supplied for the projects. *Coordinate and Supervise planting of poles, installation of crossarms, stringing of lines as well as substation installation.

*Coordinate substation test procedure by ministry of power. *Coordinate transformer energizing procedure. Carry out sock test. Load transformer and Synchronize Utility supply and Generator to power site. *Site PHCN commissioning. Achievements:- Timely delivery of projects.

University Of Lagos, Akoka- Yaba, Lagos, Nigeria

Degree B.Sc Electrical and Electronics Engineering EDUCATION

I have always wanted to be an Engineer. Studying engineering is a dream come true. Engineering is a dream to me. It is also a way of life. Its my passion. Indeed I studied Electrical and Electronics Engineering, however, over the years, I have been involved in not only Electrical Electronics aspect of engineering, but in civil also. My paper on Concrete Mix ration - a civil engineering paper published on academia.edu as Olusegun Oluwatimilehin (independent.academia.edu/OlusegunOluwatimilehin) has been read all over the world and cited as references in many educational journals. My passion for engineering has no limitations. I'm also into software developments.

Computer Literate Use of AutoCad to design BTS Solar Simulations Solar Installations LAN MS WINDOWS

Communication MS Excel Generator Installation/Swap out Rectifier

English

JOB SKILLS

LANGUAGE SKILLS

CERTIFICATES & AWARDS



Contact this candidate