ALI AHMAD

FIELD OPERATOR UTILITIES

Address: MC-*41 GREEN TOWN

KARACHI

Email: ad3u42@r.postjobfree.com

Phone: +923*********,+923*********

Skype: Available

Date of birth: 5/5/1994

Nationality: Pakistani

QUALIFICATION

INTERMEDIATE from Adamjee Govt

Science College in 2013

MATRICULATION from Sindh board in

2011

2YEARS APPRENTICESHIP from

Fauji Fertilizer Company Ltd FFBL 2014 -

2016

OBJECTIVE

To achieve a challenging position, utilizing abilities developed through experience and Education with the opportunity for the professional growth based on performance

WORK EXPERIENCE(06year)

FIELD OPERATOR UTILITIES

Company: FAUJI POWER COMPANY LTD (FPCL)

Capacity: 118MW

Duration: NOV 2017 – Present

• 4 STEAM TURBINE 3 are condensing 1 back pressure steam turbine with the capacity of 2*24mw, 1*60MW, 1*10MW

• 2 BOILERS which are coal fired boilers and has capacity of 250T/HR with 515degree temperatur and 95 kg pressure

• Operate fuel oil system for boiler burner.

• Operate BFW water system for boiler.

• COOLING TOWER is induced draft and has 6 cells with total capacity of 23500m3/hr including 5 pumps with the capacity of 4500m3 each.

• CLOSED COOLING WATER circuit has 2 centrifugal

pumps with capacity of 1200m3/hr each and has heat exchangers.

• Operate Dearator and BFW pums.

• 03 Air compressors (Screw type) used to supply service air & instrument air,each compressor has capacity of 2130 NM3/Hr.

• Knowledge about all chemicals BOILER, COOLING TOWER.

• Understand HSE systems; permit to work system and safety analysis.

• Safe hand over / takeover of equipment and machinery for maintenance.

• Maintaining & preparation daily activities log book.

• Ensures implementation of Health, Safety, Environment and Quality (HSEQ) programs.

• Implementation and follow up of HSE regulations (Work to Permit System, HAZARD Identification, and Incidents Notification etc.)

• ELECTRICAL ISOLATION lock out tag out and try out system

• Routine changeover of machines.

• Startup checklists filling.

• Involved in start-up and shut-downs.

APPRENTICESHIP

Company: FAUJI FERTILIZER COMPANY LTD(FFBL)

Duration: SEP 2014 – SEP 2016

I had done my apprenticeship on utilities plant and learned many things also did independent duty on Water Treatment which includes Raw water, Clarification, Industrial water, Waste water, Potable water, Chemical Handling and Storage.

KEY SKILLS

• MS Office tool

• Communication Skills in English

• Team player qualities

• Safety Talks Presenter

• Self-oriented

• Ability to work for long duration

• Excellent observational, analytical and

problem-solving abilities

• Process flow and P & ID's diagrams

• Permit to work procedure system (PTW)

• Process handling & Routine Checks

duringEmergency shutdown system

• Personal protective equipment

(PPE's) utilization in Acid, firefighting, and

noise pollution handling

• Critical Thinking & Root Cause Analysis

TRAINING COURSES

• Ammonia Dry Run

• Fire Fighting

• Fire Extinguishing Cylinders

• Emergency Response

• Permit to work system

• Electrical Isolation

• Chemical Handling

• RAW WATER storage has the capacity of 90000m3/hr also has 3 centrifugal tranfer pumps with the capacity of 630m3/hr

• FIRE WATER SYTEM has 4 pumps 2 pumps are just for maintaining the header pressure while remaining 2 are main pumps. Which are on auto standby and if they not starts then we start them manual.

• CLARIFIER has the capacity 1260m3/hr with the detention time of 100mins.

• WASTE WATER system has oily water sewer, chemical water sewer and storm sewer and also oily water treatment for separation of waste oil.

• POTABLE WATER system has 2 transferring pumps

capacity of 20m3 each and 1 iron filter 1 quartz filter 1 carbon filter 1 storage tank.

• COOLING TOWER is induced draft and has 10cells total capacity of 36800m3/hr with 7 centrifugal transferring pumps

• 3 INSTRUMENT AIR COMPRESSOR screw type

compressors with capacity of 1600NM3/hr

• 1 GAS BOILER water tube forced draft boiler capacity of 105ton/hr 380temperature and 42kg pressure

• 1WASTE HEAT BOILER with capacity of 85ton/hr

380temperature and 42 kg pressure and also has 6 burners.

• Follow the LAB results and take action against lab results.

• Startup checklists filling

• Keep chemical record and monthly consumption of chemical.

• Steam blowing, Air blowing, water flushing

• Reviewed and Developed the Standard Operating Procedures for the Start-Up and Shut-Down of the Plant

• Monitor and maintain chemical dosing as per given dosages rate. ul003

• Traveling

• Reading

• Volunteer work

• Music

• S