Post Job Free

Resume

Sign in

Electrical Engineer Systems

Location:
Jeddah, Mecca, Saudi Arabia
Posted:
February 22, 2024

Contact this candidate

Resume:

Page * of * Abdulmonem Altihami

Abdulmonem Mohammed Altihami Ali

PMI, (PMP), PMI-RMP Certified, ETAP

Lead Electrical Engineer Design / Design Review

Tel:009***********

Email: ad3t98@r.postjobfree.com

Nationality

Sudanese

BIOGRAPHY

Accomplished professional with comprehensive experience in leading medium to large-scale construction projects; low/medium/high voltage systems, healthcare facilities, water/waste water and infra-structure projects. Proven Team Leader for huge mass of MEP candidates at both construction and consulting firms.

Proven success in designing, executing, supervising, and consulting on wide range of varied-scale construction projects. Adept at overseeing complex construction programs, complying with regulatory standards, promoting cross- sector collaboration, and providing electrical engineering solutions. Expert at integrating electrical systems and incorporating advanced technologies and safety measures. Proficient in offering expert consultancy services, leveraging theoretical and scientific knowledge, and providing informed recommendations to thrive across dynamic environments. Technical Proficiencies

• Substantial technical, practical and leadership experience in the relevant discipline and proven experience in project engineering on smaller projects, with associated commercial and contractual experience

• Electrical Systems Management (Power & Low Current Systems): Design, configure, oversee installation, conduct testing and commissioning and handover for power systems.

• Primary Power Substations and Transmission Lines: Lead design, design reviews, and construction for primary power substations. Manage execution of overhead transmission lines ranging from 34.5 to 220KV.

• Project Management and Estimation: Proficient in predictive and agile project estimation. Experienced in electrical systems design, MEP design review, and MEP shop drawings for Water/Wastewater, Healthcare Facilities, Commercial, Educational and infrastructure Projects.

• Spearheaded integration of Security Systems: Such as Access Control, CCTV, Automatic Incident Detectors & Traffic Signals for (Roadways), Intruder Detection systems, Security Sliding Gates & their classified DOS Crash rates (K4, K8, or K12), Gate Barriers, Rising Bollards, Under Vehicle surveillance system, X-Ray Luggage Scanners, Walkthrough Metal Detectors

• Solar Plant Expertise: Manage design and selection of materials for solar plants, including solar panels, inverters, DC wires, weather stations, etc. Oversee installation, testing, commissioning, and handover.

• SCADA System Design and implementation, Fiber Optic Back-Bone & Making Signal Lists (I/O List) & PLC’s, DDC Panel Schedules

• Cathodic Protection (Water/Waste Water Projects): Conduct execution &and supervision of cathodic protection, encompassing sacrifice and impressed current methods.

• Local Standards and Compliance: In-depth knowledge of local standards, including SBC and SEC, with a strong emphasis on compliance and safety in electrical systems.

•International Standards and Codes: Familiarity with international standards and codes such as NEC, IEC, IEEE, NFPA-99, NEMA, UL, ANSI, and ASHRAE.

Education

BSc. Electrical Power

Engineering.

Sudan University of

Science & Technology

(1997)

Professional Experience

24+ Years

2 Years+ with K&A

Professional Affiliations

Saudi Council of Engineers

Sudanese Engineering

Council

MS Office Software

Package.

Electrical Calculations

Software - ETAP

PMI® - PMP# 3566239

PMI® - # 3658235

ACP-Reserved for Exam

Familiar to deal with BIM

Core Skills

MEP Projects management

Team Formation &

Leadership

Projects’ Cost Estimate

Projects’ Handover &

Snagging

MEP Design Management

MEP Design Review

Projects’ Engineering Tasks

Furnish/Review MEP SD.

Selection of

Material/Vendors

Technical Knowledge

Projects Procurement

Risk Analysis

Languages

English (Expert Level)

Arabic (Native Speaker)

Page 2 of 4 Abdulmonem Altihami

K&A

Senior Electrical Engineer. OCT 2021– Present

Senior Electrical Engineer Member of TESS contract in Technical Design Review Team, for TBC PPP- Schools Project which was designed and executed throughout by BIM360 modeling software. Serve as meticulous electrical engineer for approving electrical shop drawings to ensure precision and compliance with project requirements, thereby optimizing construction processes. Verify electrical calculations, along with ensuring adherence to industry standards and driving development of error- free electrical systems. Efficiently manage technical materials submissions, whilst addressing Electrical Requests for Information (RFIs), and resolving other technical challenges.

• Contributed to seamless execution of projects through effective project communication and problem- solving.

• Employed hands-on experience in overseeing construction of 60 schools, including Jeddah (27#) and Makkah (33#), overseeing large-scale projects with attention to detail and industry compliance.

• TESS (Technical Engineering & Site Support) Team Leader working closely with a considerable No. of Multi disciplines Engineers to facilitate their job and offer technical support for the main Building Contractor.

• Participate in virtual Audio Visual Project administration meetings whenever conducted. ACES – Arabian Consulting & Engineering Services- (KSA- Riaydh) 2017– 2021 Head of Electrical Department

Drove designing and implementation of electrical systems for a multitude of expansive Construction & Infrastructure projects. Orchestrated the planning, execution, and approval processes for Medium/Low Voltage systems, Low Current systems (including IP Telephony & Data networks, IPTV, Qmatic), B.M.S & Scada, Instrumentation, Fire Alarm, PA & Fire Evacuation, Background Music, Audio Visual, and acoustical studies, meticulously guaranteeing adherence to specified sound level limits. Spearheaded integration of Security Systems: Such as Access Control, CCTV, Automatic Incident Detectors & Traffic Signals for (Roadways), Intruder Detection systems, Security Sliding Gates & their classified DOS Crash rates (K4, K8, or K12), Gate Barriers, Rising Bollards, Under Vehicle surveillance system, X-Ray Luggage Scanners, Walkthrough Metal Detectors …etc. to fortify safety and security measures.

Engaged in scheduled co-ordination meetings with clients and contractors, meticulously monitoring project execution activities to ensure strict adherence to project timelines.

Managed high-performing MEP Design teams, overseeing the creation of design drawings, specifications, BOQs (SOW), technical calculations, and comprehensive lists of proposed materials and recommended vendors, facilitating the seamless implementation of projects.

Led bidding process for design and supervision projects, securing new acquisitions and contributing to the expansion of project portfolios.

Conducted rigorous material and shop drawing approvals for ongoing projects, maintaining a commitment to high-quality workmanship.

Addressed technical queries from contractors, demonstrating a hands-on approach to problem-solving and ensuring accurate updates to project configurations and related artifacts.

PROFESSIONAL HISTORY

Year Position Company Country

2021 – Present Senior Electrical Engineer Khatib & Alami KSA 2017 – 2021 Electrical Section Head

Arabian Consulting & Engineering

Services (ACES)

KSA

2013 - 2015 Electromechanical Head Department Al-Etack Contracting Company KSA 2011 – 2013 MEP Head

Nahdat Alemaar, Al-Bayan Holding

Company

KSA

2001 – 2011 Senior Electrical Engineer Al-Swayeh Contracting Co. Ltd. KSA 1998 – 2000 Senior Site Electrical Engineer Al-Owiadah Holding Co. KSA Page 3 of 4 Abdulmonem Altihami

Al-Etack Contracting Company, Riyadh, KSA 2013-2015 Principal MEP Engineer-King Saud Medical City (Alshameesi) Supervised and manage the MEP teams to produce comprehensive workshop drawings, technical studies, calculations, material submittals, and oversee material procurement. Orchestrated installation of HVAC systems, managing a Closed-loop chilled water system with 450-ton capacity across eight chillers, Wet & Dry Fire Fighting Systems, UL-FM-200 Fire Fighting System, Cold Store, Water Treatment Plant, and Medical Gas System. Directed MEP teams and subcontractors during the construction of Medical Tower No.2, steering execution, testing, commissioning, and seamless handover of electrical and mechanical works.

• Spearheaded management of Electrical Team, whilst driving production of various electrical systems shop drawings and conducting crucial power systems calculations.

• Oversaw engineering efforts for Low-current systems, including fire alarm, public address system, security system, nurse call, IP telephony, and clock system.

• Demonstrated commitment to continuous improvement by enhancing Electrical Power Calculations and leading redesign and provision of shop drawings.

• Managing MEP teams & subcontractors for executing, testing & commissioning, and handover of mechanical works such as HVAC - Closed loop chilled water system (450 tons x 8 Nos. of chillers), Wet & Dry Fire Fighting Systems and UL-FM-200 Fire Fighting System, Medical Gases System. Nahdat Alemaar, Al-Bayan Holding Company, Riyadh, KSA 2011- 2013 MEP Head (Construction & Water Projects)

Managed MEP Systems construction of Hail Educational Hospital, whilst delivering 500-bed medical center to meet community healthcare needs. Conceptualized and developed SE'ED (WASEE) Water Project by targeting daily capacity of 360K m3 as well as ensuring efficient and sustainable water supply for community. Created detailed MEP proposal for Al-Buwaib Water Treatment Plant with daily product of 15K m3 to improve/booster water supply and accessibility for Riyadh region. Received and analyzed Daily Site Activities Reports, providing a real-time overview of project activities. Fostered clear communication with the Site MEP Team, ensuring timely and efficient information exchange to maintain project momentum and address any emerging issues.

• Conducted regular site visits to assess achieved works based on Key Performance Indicators (KPIs) by identifying impediments and implementing effective solutions for seamless project progression.

• Attended monthly progress meetings with clients and key stakeholders to discuss project advancements, address concerns, and ensure alignment with project goals.

• Prepared comprehensive MEP Monthly Progress Reports, highlighting key milestones, challenges, and proposed actions for continuous improvement.

• Guided and mentored MEP Team to enhance task completion and meet commitments effectively.

• Negotiated contracts with bidders and finalize procurement processes by shortlisting vendors. Al Swayeh Co. Ltd., Riyadh, SA 2001-2010

A- Senior Electrical Engineer @ Construction Works Division: a. Hail Girls College with approx. area of 13,000 Sq.M. against total value of S.R. 26 M. b. Al Ahsa Girls College with approx. area of 20,600 Sq.M. against total value of SR 42 Million. c. King Abdul Aziz & His Companions Foundation for Gifted d. Auto Auction Yard for Arriyadh Development Co.

B- Senior Electrical Engineer/Water & Wastewater

In charge of managing Electrical works for variant Water Treatment P: a. Design, and furnishing workshop drawings & technical material submittals for electrical Power Systems, Lighting, Earthing, Lightning Protection, Low Current Systems, instrumentation & Scada systems.

b. Electric power calculations to identify the capacity of Power Plant (Substation) Transformers, RMU's & LV switchgears.

c. Generators Spec. sizing for proper selection of Standby Generators and their associated auxiliaries (Gentset Fuel Systems, Hot Air Exhaust System, Power Command, Generator Room Sizing…etc.)

d. Power cables sizing & voltage drop calculations; e. Design and execution of indoor & outdoor lighting systems. f. SCADA system design, fiber optic back-bone & making signal lists (I/O List) & PLC’s, DDC Panel Schedules.

g. Supervising the execution of Cathodic Protection (Sacrifice & Impressed Current) for water transmission pipelines, Strategic Water Storage Steel Tanks. h. Establishment of Process & instrumentation diagrams PID's. i. Material selection, submittals, approval, and procurement. j. Testing, Commissioning, As-built Drawings & project handover. Page 4 of 4 Abdulmonem Altihami

Al-Owiadah Contracting Co. Ltd., Riyadh, KSA 1998-2000 Site Electrical Engineer @ Modern Slaughterhouse- Mina-Almoaisim - Makkah a. Management the work for rerouting of 220 KV overhead transmission lines (10 towers with different soil types such as loose, weathered rock, hard rock), the works include inspection of delivered material, supervision of lattice towers’ assembly, wire stringing for OHTL, earthing of Lattice tower, warning spheres, warning signs, testing & commissioning and power lines charging.

b. 160 MVA Primary Substation (Almawasim Substation)& Unit substations c. Management & supervision of constructing a 4x40 MVA, 220 / 13.8 KV, 160MVA, primary substation. The S/S consists of 4x40 MVA power transformers, switchgear room, line SF6 circuit breakers, switchgear room, auxiliary transformer, gantries, 2 Nos. line traps, suspension bus bars, VT's, CT's, motorized earthing switches & isolating switches, relaying, PLC’s & SCADA systems. d. Supervising the construction of 4 Nos. Unit Substations, each 20 MW, 13.8/4.16 kV/380/220 V supplying the slaughter house units (B, D, E & F) in addition to 7 Nos. package substations for site power services for Street Lighting High masts, Irrigation Pumps, Lifting Pump stations, Drinking fountains, Ticket reservation Kiosks, ….etc. Key Projects Briefing

Senior Electrical Engineer (TBC Programme – PPP Project):

• Served as key member of the technical review team for TBC Programme, a PPP project encompassing 60 schools (27 in Jeddah and 33 in Makkah).

• Played pivotal role in ensuring electrical systems' efficiency and compliance with project requirements.

Design, Construction, & Supervision (Saudi Embassies, Africa & Asia - Ministry of Foreign Affairs):

• Led redesign, consultancy, and construction supervision of Saudi Embassies in Africa and Asia for Ministry of Foreign Affairs (MOFA).

• Optimized embassy facilities by ensuring adherence to international standards and providing technical oversight throughout construction process.

• Led redesign, consultancy, and construction supervision of Al-Naghi Motors showrooms, and Construction of Body & Paint (B&P) @ AlSulay, Riyadh Medical Tower #2, King Saud Medical City, Riyadh:

• Directed electrical engineering aspects of prestigious Medical Tower #2 project at King Saud Medical City in Riyadh.

• Oversaw redesign, implementation, and commissioning of complex electromechanical systems within medical facility such as Electrical Power House, HVAC & Chilled Water System, Power Bus duct, Medical Gases, Cold Store, Hot Water Plant, Water Treatment Plant…etc.. Diverse Project Portfolio: Al-Swayeh Co. & Al-Bayan Group:

• Contributed to successful completion of various projects, including Medical Tower # 2 at King Saud medical City, Al-Jouf Educational Hospital, Hail Educational Hospital, Girls College in Al-Ahssa, Se'ed Water Project, Al-Ulla Water Projects, Najran Water Projects, Bisha Pumping Station, Hotat Bani Tameem Water Project and Riyadh Auto Auction Yards.

• Applied electrical engineering expertise to ensure efficient operation and compliance of electrical systems across diverse sectors.

Modern Slaughterhouse, Mina-Makkah: Al-Owiadah Contracting Co. Ltd: 1998-2000

• Deployed electrical engineering efforts for Modern Slaughter House project in Mina-Makkah, whilst overseeing the implementation of 160MVA primary substation, 220 KV overhead transmission lines, Sacrificing Halls, Freezing Rooms, Cold Store, and 4 Nos. 40KVA Unit substations for Slaughter houses.

• Site Yards and Parking Areas Lighting Towers (30m High mast)

• Played crucial role in ensuring reliability and safety of electrical infrastructure supporting facility



Contact this candidate