Post Job Free

Resume

Sign in

Civil Engineering Project Manager

Location:
Jalalabad, Nangarhar, Afghanistan
Salary:
According to the company salary scale
Posted:
February 20, 2024

Contact this candidate

Resume:

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 1

Name of Expert: Abdul Wahid Qani

Date of Birth: 1973

Email id ad3si6@r.postjobfree.com or ad3si6@r.postjobfree.com Contact No 077-***-**-** Or 078-***-**-**

Nationality Afghan

Current Address Qala shanan Ahmad shah baba mina Kabul City Afghanistan Education : B.Sc degree in Civil Engineering, Kabul University Year : 1993 1997

Training :

Education & Management One Month Course IRC In 1988

Social Affairs course from RB/TU 15 days in 1988

Social Rehabilitation course from Save the Children,6 months in 1989

Site Training in Construction Unit,5 Months in 1998

Social organization training in DACAAR,5 Days 1999

Basic Hydrogeology training in DACAAR,7 Days 1999

Project Management Training in DACAAR/BRAC,5 Days in 1999

Accounting Training in DACAAR/BRAC,5 Days in 1999

QC,Testing and Sampling No:01,5 days in UNOPS 2005

River Engineering Training in UNOPS,5 Days 2005

QC, Testing and Sampling No:02 in UNOPS 4 Days in 2005

QC, Testing and Sampling No:03 in UNOPS 4 Days in 2006 Total Years of Work experience: 23 Years

Employment record relevant :

to the assignment

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

02/APR/2015

TO

31DEC 2020

EMPLOYING ORGANIZATION

Asian Development Bank Program

Management

Office /ADB/PMO/ / MPW/

Ministry of Public Works

TITLE POSITION:

PROJECT MANAGER

CONTACT INFORMATION FOR

Afghanistan Design review and construction

supervision of all Project structural

elements, including temporary

works, earthworks, bridges,

retaining walls, drainage culverts

and any other structures

Monitor project implementation at

site; interact with the Consultants

on a day-to-day basis concerning

implementation and take corrective

measures.

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 2

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

REFERENCES

Name: Aminullah Hatam

Program Director

Tel: +937********

Email:

ad3si6@r.postjobfree.com

Develop, complete and update

implementation of Project plan(s)

Weekly, monthly, quarterly and

annually plans

Implement the approved plans as

directed by the senior staff.

Set in sustainability scopes

including social and gender

inclusion, environmental and

economic features into the project

life time;

Be able to the production of the

required outputs, taking

responsibility for overall progress

and use of resources and initiating

corrective action where necessary;

Ensure that quality of work

packages and deliverables

complies with the quality

necessities well-defined in the

Project Plan;

Liaise with the suppliers or account

directors;

Advise the Senior Program

Manager of any possible

nonconformities from the plan and

possible remedial actions;

Manage acceptance and delivery of

work bundles;

Manage the invoicing and progress

verification of works, payments

certification,procurement, managing

construction companies,

construction sites and dealing with

Government authorities and other

stakeholders.

Monitor project progress ensuring

that work packages are being

executed correctly;

Control project and work packages

changes;

Accept works, goods or services

delivered by suppliers;

Lead contract management duties

including supplier performance

evaluations;

Support the development and

implementation of systems for

internal control that ensure

compliance with contractual terms

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 3

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

and conditions, in collaboration with

the procurement team and ADB

Guidelines.

Act as the Employer’s

Representative within the FIDIC

works contracts.

Identify, and anticipate in a timely

manner, potential risks and issues

and advises on mitigating measures

to Senior

Review progress reports submitted

by the Consultants to assess

project implementation and assist

the PMO in taking/communicating

important decisions of the Employer

(MPW) to the Consultants to avoid

potential delays.

Coordinate/liaise with Consultants,

Contractors, project manager, other

Ministries and ADB concerning

technical matters of the project.

Liaise with provincial / local

Governments concerning

implementation of the project to

resolve any issue relating to the

Contractors/Consultants.

Ensure that the works are

implemented in accordance with the

technical specifications specified in

the contract and interim road

standards of MPW.

Ensuring that the Supervision

Consultants perform in accordance

with the contract.

Recommend to PMO with respect

to various contractual matters

including approval of variations,

grant of extension of time, etc.

Review the recommendations of the

‘Engineer’ on designs prepared by

the civil works contractors, method

of implementation, final testing,

commissioning of the project, etc.,

and accord Employer’s approval.

Review the IPCs/invoices submitted

by the Consultants/Contractors and

recommend for payment.

Ensuring compliance of loan/grant

covenants at site

01/JAN/2013 EMPLOYING ORGANIZATION: Afghanistan Review all submittals to insure CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 4

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

15/MAR/ 2015

LAKESHORE TOLTEST

CORPORATION (LTC)

TITLE POSITION: CONSTRUCTION

MANAGER (CM)

CONTACT INFORMATION FOR

REFERENCES

Name:Gul Zaman Gharwal/Mr.

Mark Quinn

Tel: +937********

Email:

ad3si6@r.postjobfree.com

compliance with the plans and

specification

Compare the sites working progress

with the working schedule and take the

required action for the sites completion

before deadline.

Ensure that projects are completed to a

satisfactory standard.

Implementing the construction

management system at site.

Review construction submittals to

ensure compliance with contract

requirements

Conduct preparation meetings on job

site And Interested parties.

To review the specification, design and

as-built drawings

To inspect construction activities and

establish testing requirements and

materials approval

Attend Project Progress Weekly

Meeting with AED and provide minuts

of meeting.

Review provisions that have been made

to provide required control inspection

and testing. .

Conduct all completion inspections –

punch-out, pre-final and final

acceptance.

Efficient management of project

Documents.

Elaborating inspection and test

programs.

Ensuring the safety is adhered to at

site.

Report to Project Manager

To instruct site subcontractors to

proceed according to the design

documentation.

Ensuring all quality control

documentation is complied and

competed for as-built hand over.

Controlling all non-conformances

reports and undertakes remedial action.

Complete site quality control

instructions and action remedial

responses.

Monitoring the implementation of the

approved site construction Plan.

Coordinating with the client

representatives on all quality matters.

15/JULY/2012

31/DEC/2012

EMPLOYING ORGANIZATION:

DAI/ICMA

Afghanistan Assist the municipal engineers in the design and in the development of

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 5

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

TITLE / POSITION:

MUNICIPAL ENGINEER(RAMP UP

EAST/JALALABAD)

CONTACT INFORMATION FOR

REFERENCES

Name:Aminullah

Hatam/Mr.Calvin

Tel: +937********

Email:

ad3si6@r.postjobfree.com

project documents for small scale

infrastructure municipal projects.

Provide in-office mentoring and

training to municipal Engineering

staff to improve their competence.

Assist the municipality

Engineering and other municipal

staff in all aspects of project

planning and implementation.

Supervise the contractors in the

areas of monitoring, change of

orders, contract compliance,

quality assurance, safety and

documentation of all interaction.

Report the activities and progress of

municipal infrastructure projects.

Assist his/her supervisor in the

formulation of work plans, and

program implementation.

Any other tasks assigned by the

Supervisor or the Engineering Director.

03/MAR/2004

20/JULY/2012

EMPLOYING ORGANIZATION:

UNITED NATION OFFICE FOR

PROJECT SERVICES (UNOPS)

TITLE POSITION: PROVISIONAL

TECHNICAL

ADVISOR/(PTA)REGIONAL

ENGINEER

CONTACT INFORMATION FOR

REFERENCES

Name:Mrs: Viorica Durmtru

Office Manger East Region

Tel: 93XXXXXXX

Email:

ad3si6@r.postjobfree.com

m

Afghanistan The PTA will ensure that survey

information necessary for project

formulation is collected and processed

in a timely manner.

Implementing the current bridges,

roads and ongoing projects in east

region through engineers and

supervisors.

He will ensure that Bills of Quantity,

cost estimates, technical specifications,

Construction drawings, construction

work plans are prepared.

PTA will ensure that contract

administration is carried out in

accordance with UNOPS/ Government

agreed systems and procedures.

Will ensure the preparation of tender

documents to Government/UNOPS

agreed standards.

Will ensure transparent and

standardized short listing / registration

of contractors

RTA will ensure that bids are evaluated

in a transparent fashion by an

independent committee.

Will ensure payments to contractors are

made only based on measured progress

as per agreed work plan.

PTA will ensure documentation

associated with the progress of works is

being carried out and contracts are

administrated as per standard

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 6

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

procedure.

He will ensure that monthly and

quarterly reports are being prepared.

PTA will ensure efficient liaison with

the relevant partners and central

institutions.

Briefly specific focus on

(Roads+Buildings+Bridges; pre-cast,

Guarder or Suspension bridge) survey,

Designing, Tendering preparations.

Work supervision & Quality control.

EMPLOYING ORGANIZATION:

UNITED NATION OFFICE FOR

PROJECT SERVICES (UNOPS)

TITLE / POSITION: MONITORING

ENGINEER

CONTACT INFORMATION FOR

REFERENCES

Name:Stephen Brent Appleton

MSM,CD, PEng,MBA, MSS

Program Manager

Tel: +93 70 277 033

Email:

ad3si6@r.postjobfree.com

Afghanistan Provide a detailed and

accurate assessment of the Bill

of Quantity.

Assist in preparing BoQ and

tender documentation in

accordance to international

standards.

Review and provide advice on

technical specifications to

ensure adherence to different

classes of roads standards.

In collaboration with the

Surveyor, advise on

appropriate location for road

constructions.

Monitoring work of road

construction and ensure that

QA/QC Engineers are

undertaking testing of road

sub-grades and road

construction materials in

collaboration with the Regional

Manager/Engineer;

Review the existing practice by

local contractors and

conventional methodology of

road construction; make

recommendation for

improvements;

Review QA/QC site visit and

materials testing reports to

ensure sampling, testing and

inspection of materials are

carried out regularly and works

are implemented in compliance

with design specifications;

Review and verify NERAP

contractors’ temporary works

design and check Form Work;

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 7

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

Review and endorse Interim

Payment Certificate for the

works submitted by the

contractor;

Review and endorse design

changes proposed by the

QA/QC Engineers and

NERAP/MPW Engineers.

Provide technical advise and

training to NERAP/MPW

Engineers and local

contractors in road design and

construction techniques

including good practices and

troubleshooting methods;

Monitor the implementation of

the works by conducting site

visits and provide guidance for

improvement and good results;

Preparing the architectural

drawings and Technical

aspects for the all type of

infrastructure projects as

Culverts, Fords, Causeways

vented or other, Washes and

preparing the Bill of Quantities

for Structures and Roads

especially (Asphalt concrete,

DBST, or other Pavements.

Mentoring and building the

capacity of MPW Civil Servant

Counterparts.

Perform any other duty in line

with these ToR’s as requested

by the Head of TSP.

02/01/1998-

03/03/004

EMPLOYING ORGANIZATION:

DACAAR

TITLE / POSITION: PM(PROJECT

MANAGER)

Water & Sanitation

Project

CONTACT INFORMATION FOR

REFERENCES

Name: Mr. Shawali khan

Country Manager

Afghanistan Supervision of the projects

activities/Quality and quantity.

Achieving the projects

objectives.

Responsible to record all facts

and transactions such as

starting date, work suspension

or any technical changes in

construction details on the

projects journal.

Implementing the project

according to the given

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 8

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

Tel: 937********

Email:

ad3si6@r.postjobfree.com

specification and time

schedule, in case of raising

any problem he has to contact

with section management

immediately.

Purchasing construction

materials according DACAAR

rules.

Repairing and maintenances of

all project equipments.

Checking and controlling all

recorded project documents

such as stock, machinery

maintenances and fuel

consumption.

Preparing monthly reports

(Progress, stock, activities,

expenses) on proper time.

Having close contact with local

authorities and community

representatives regarding their

participation with the new

selected projects.

Project selection and sighing

agreements with the local

authorities and related

community representatives.

Responsible to submit the

signed agreements and detail

survey (measuring the quantity

and required works) for budget

estimation to section

management on proper time.

Conducting Village Surveys

(Pre-Project, Completion and

Technical), Site Selection, of

Wells, Stand Posts and

Irrigation Structures ( In-take,

Cause way, Culvert etc)

Giving Priority to needed

people.

Checking the Quality of

Building Materials.

Supervise the Curing of

Concrete and Concrete

Elements.

Checking the log Book of the

Vehicles, Generators, Drilling

Rigs.Etc

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page - 9

PERIOD

EMPLOYING ORGANIZATION AND

YOUR TITLE / POSITION.

CONTACT INFORMATION FOR

REFERENCES

COUNTRY

SUMMARY OF ACTIVITIES PERFORMED

RELEVANT TO THE ASSIGNMENT

Checking the daily works

Records

Assigning of the Engineers,

Equipments, and Vehicles for

Projects activities

Mobilization of local community

to contribute the Project

through Field Engineers

Supervise Hygiene Education

Couple in the Field and

Evaluating of their activities

Membership in Professional

Association and Publications: Afghanistan engineering Association Running, Walking and Biking

Language Skills :

Language Speaking Reading Writing

English Excellent Excellent Excellent

Adequacy for the Assignment:

DETAILED TASKS ASSIGNED

ON CONSULTANT’S TEAM

OF EXPERTS:

REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE ASSIGNED TASKS

Refer Figure Team

Composition & Task

Assignment.

Name of Assignment or Project: Sharana - Angor Ada Corridor Road Project MPW;

Funded by: Asian Development Bank (ADB)

Project Cost: 52 Million US$

Location: Afghanistan

Client: MPW

Main Project Features:

CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page -

10

DETAILED TASKS ASSIGNED

ON CONSULTANT’S TEAM

OF EXPERTS:

REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE ASSIGNED TASKS

Length of The Road:50Km

Width of the Road:10meter

Asphaltic Road Pavement Thickness=11cm

Position Held: Project Manager

Activities Performed: Main activities are the design review and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx.1.2 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (12 nos.) and culverts (180 nos.), cause way, guide walls, retaining walls, making correspondences with clients and ADB, checking and approval plan-profile and X-sections, checking the designs of concrete, asphaltic binder and wearing courses, checking and Approval of IPC’s, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc.

Name of Assignment or Project: Kabul-Jalalabad 2nd Highway Project Funded by : Asian Development Bank (ADB)

Project Cost: 110 Million US$

Location: Afghanistan

Client: Ministry of Public works

Main Project Features: Road construction, total 100 Km (78km rigid & 22km flexible) Pavement.

Including of cross drainage structures as Causeways, culvert, bridges and as well as retaining walls.

Position Held: Project Manager(PM)

Activities Performed: Main activities are the design review and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx.2.2 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (18 nos.) and culverts (300 nos.), cause way, guide walls, retaining walls, making correspondences with clients and ADB, checking and approval plan-profile and X-sections, checking the designs of concrete, asphaltic binder and wearing courses, checking and Approval of IPC’s, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc. Name of Assignment or Project: Jabal-e-Siraj Highway project Funded by: Asian Development Bank (ADB)

Project Cost: US$ 29 Million

Location: Afghanistan

Client: MPW

Main Project Features: Road construction, 24 Km flexible Pavement. Including cross drainage structures as Causeways, culvert, bridges and as CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page -

11

DETAILED TASKS ASSIGNED

ON CONSULTANT’S TEAM

OF EXPERTS:

REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE ASSIGNED TASKS

well as retaining walls.

Position Held: Project Manager(PM)

Activities Performed: Main activities are the design review and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx.0.8 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (02 nos.) and culverts (125 nos.), cause way, guide walls, retaining walls, making correspondences with clients and ADB, checking and approval plan-profile and X-sections, checking the designs of concrete, asphaltic binder and wearing courses, checking and Approval of IPC’s, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc.

Name of Assignment or Project: Construction of 8km black top pavement in the jalalabad city, and other several small projects like vehicle parking construction, Park construction and designing. Funded by : Development Associate Inc (DAI)

Project Cost: 600,000 US$, 300,000US$ etc.

Location: Afghanistan

Client: Jalalabad’s Municipality

Main Project Features: Construction of 8km black top pavement in the jalalabad city, and other several small projects like vehicle parking construction, Park construction and designing.

Position Held: Municipal Engineer (Ramp Up East/Jalalabad) Activities Performed: Main activities are the design review Preparation & designing of small scale projects vertical & Horizontal Structures, providing training to the municipal staff and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx 0.11 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (2 nos.) and culverts

(50 nos.), cause way, guide walls, retaining walls, making correspondences with clients and DAI, checking and approval plan- profile and X-sections, checking the designs of, asphaltic binder and wearing courses, checking and Approval of Payments, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc.

Name of Assignment or Project: Jalalabad to Asmar 123km Highway project

Funded by:USAID Louis Berger (LBG)

Project Cost: US$ 43 Million

Location: Afghanistan

Client: MPW

Main Project Features: Road construction, 123Km DBST Pavement. Including cross drainage structures as Causeways, culvert, bridges and as CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page -

12

DETAILED TASKS ASSIGNED

ON CONSULTANT’S TEAM

OF EXPERTS:

REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE ASSIGNED TASKS

well as retaining walls.

Position Held: M&E Engineer

Activities Performed: Main activities are the design review and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx.2 million cum), preparation of sub- grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (12 nos.) and culverts (350 nos.), cause way, guide walls, retaining walls, making correspondences with clients and USAID, checking and approval plan-profile and X-sections, checking the design of DBST, checking and Approval of Payments, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc.

Name of Assignment or Project: Jalalabad to Wazir 40km Highway project

Funded by: USAID

Project Cost: US$ 18 Million

Location: Afghanistan

Client: MPW

Main Project Features: Road construction, 40Km DBST & Asphalt Pavement.

Including cross drainage structures as Causeways, culvert, bridges and as well as retaining walls.

Position Held: M&E Engineer

Activities Performed: Main activities are the design review and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx.0.13 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (12 nos.) and culverts (350 nos.), cause way, guide walls, retaining walls, making correspondences with clients and USAID, checking and approval plan-profile and X-sections, checking the design of DBST & Asphalt, checking and Approval of Payments, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc.

Part B: Vertical Structures:

Under the job the following vertical structures are constructed: 1. Construction of Science faculty building in Nanagarhar University for the cost of 480,000 US$.

2. Construction of Kunar province governor’s office Complex for the cost of 360,000 US$..

3. Construction of Police Head Quarter Complex in Chaparhar district of Nangarhar province for the cost of 350,000 US$.

4. Construction of Goshta District Complex in Nangarhar province for the CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page -

13

DETAILED TASKS ASSIGNED

ON CONSULTANT’S TEAM

OF EXPERTS:

REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE ASSIGNED TASKS

cost of 300,000 US$.

5. Construction of Batikot Basic Health Centre (BHC) for the cost of 180,000 US$.

6. Construction of Shpola Comprehensive Health Centre (CHC) for the cost of 220,000 US$.

7. Construction of Police Head Quarter Building in Ghani Khaail, Kama and Alingar district for the cost of 380,000 US$.

8. Construction of Police Head Quarter Building in Kama and Alingar district for the cost of 350,000 US$..

9. Construction of Police Head Quarter Building in Alingar district for the cost of 340,000 US$..

10. Construction of 100meter Suspension bridge in Nari District Kunar province for the cost of 180,000 US$.

11. Construction of 112meter Suspension bridge in Rustaq District Takhar province for the cost of 720,000 US$.

12. Construction of 60meter Girder bridge in Alingar District Laghman province for the cost of 300,000 US$.

13. Construction of three 22-20 & 23 meter Girder bridges in Waygal District Nuristan province for the cost of 660,000 US$. Name of Assignment or Project: Construction of 3-4km black top pavement in each 12 district of Jalalabad city, and designing. Funded by : United Nation Office for Projects Services (UNOPS) Project Cost: 250,000 US$X4=1,000,000 US$ &

300,000US$X8=2,400,000 US$, Grand Total budget 3,400,000 US$. Location: Afghanistan

Client: UNOPS

Main Project Features: Construction and designing of 3-4km black top pavement in each 12 districts of Jalalabad city and construction of vertical structures buildings in four provinces of East region, likely governors, sub governors complexes & police Head Quarter Complexes. Position Held: M&E engineer & Provincial Technical Advisor (PTA) Activities Performed: A). Main activities are the Survey design review Preparation of Projects documents & designing of 12 small scale projects Horizontal Structures, providing training to the Public works staff and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill (approx 0.18 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (2 nos.) and culverts (50 nos.), cause way, guide walls, retaining walls, making correspondences with clients and UNOPS, checking and approval plan-profile and X-sections, checking the designs of, asphaltic binder and wearing courses, checking and Approval of Payments, checking and Approval of VO, preparation of MPR, quarterly, CURRICULUM VITAE (CV)

TEAM COMPOSITION,KEY EXPERT

Page -

14

DETAILED TASKS ASSIGNED

ON CONSULTANT’S TEAM

OF EXPERTS:

REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE ASSIGNED TASKS

biannual and final completion report etc.

Name of Assignment or Project: Construction of ANA, 2/201st Brigade Garrison Afghanistan

Funded by: US Corp of Engineering

Project Cost: US$ 105 Million

Location: Afghanistan/Khas Kunar Project

Client: LTC /Lakeshore Toltest Corporation

Main Project Features: Construction of ANA, 2/201st Brigade Garrison Afghanistan

This assignment is consisting of construction of 150 Numbers vertical buildings, Construction of 4km Anti-Vehicles trench (Canal Lining), construction of the 45,000 meters surrounding wall and Entrance Gates and 50 Guard Towers & construction of 15km Asphaltic road. Position Held: Lead Construction Manager (LCM)

Activities Performed: Main activities are the design review for vertical & Horizontal structures and approval of plan-profile-x sections, bridges, culverts, causeways, retaining walls etc. It also includes cut and fill

(approx. 0.5 million cum), preparation of sub-grade, laying and compaction of sub –base material, base course material, priming, laying of asphaltic binder course and wearing course, construction of hard shoulder etc. The project also includes construction supervision of bridges (12 nos.) and culverts (50 nos.), cause way, guide walls, retaining walls, making correspondences with clients and US Corp of Engineering, checking and approval plan-profile and X-sections, checking the design of Asphalt road, checking and Approval of Payments, checking and Approval of VO, preparation of MPR, quarterly, biannual and final completion report etc. Name of Assignment or Project: Water & Sanitation & Hygiene Projects Funded By: DACAAR

Project Amount: 3 - 3.5 Millions USD Per year

Location: Afghanistan

Client: DACAAR

Main Project Features: Conducting Village Surveys (Pre-Project, Completion and Technical), Site Selection, of Wells, Stand Posts and Irrigation Structures ( In-take, Cause way, Culvert etc).

Supervision of the projects activities/Quality and quantity. Achieving the projects objectives.

Drilling of potable water tube wells, construction of reservoirs and aligning of



Contact this candidate