Senior Projects Manager of Distribution Projects Small and large and Lead Electrical/ Instrumentation & Electrical Heat Tracing (EHT) Field Engineer Specialist, Senior Electrical Design in House EPC, Onshore / Offshore Oil & Gas, Module Site Yard Construction and Co-Ordination, QA/QC Electrical, Instrumentation and Electric Heat Tracing, Commissioning, Turn-Over Systems, and Plant Shutdown/Startup of Upgrade Maintenance Planning, Procurement and Schedule Day to Day and weekly planning Schedules. Site supporting of Generators Transformers medium and Low voltage and Backup power Emergency on day to day as required stand-by power on Normal power distribution back up supply and Verifications of supporting Documentation from Factory Acceptance Test (FAT) test to site Insulating recall to support EPC Client and to ensure all Critical Components are on Hand during Maintenances and back up supplies and Under Shutdowns

Profile: -

Senior Project Manager and Distribution of Projects Small and Large Projects levels of expertise with Engineering Procurement Construction (EPC) to Provide Construction start-up and Supervision, Maintenance Operations Support, Troubleshooting, Testing and Test Procedures, Technical support Client’s Operating and Maintenance site Plant/Unit Spare Maintenance on daily operations and Shutdown, QA /QC, Equipment, for Start-Up, Plant Turn over and Unit plant procedures, Plant System. Ensure Construction as per P&ID’s Scope of work and on Set construction, mandated on weekly work schedule Coordination with client representatives as per progress within Oil and Gas plants, Petrochemical Refineries, Oil Sands, Gas Compressor Turbines Onshore and Offshore Platforms and Chemical Plants Facilities. Onsite support as Field Engineer liaison with field Union Superintendents on day-to-day and weekly work schedules for Electrical trades personnel and mandated by EPC / EPCM facilitator Inspections of Module and skid Package at Vendor fabrication shops for Inspection of Electrical/Instrumentation Equipment as per Client standard Installation Details and Code requirements before shipped to site for Installations. Mark up of vendor documents Data to meet Client electrical requirements as per P&ID and Client Electrical Engineering design scope of work mandated by any field changes and As-built and documented. Installation of 5Kv Generators to low Voltage to medium Emergency Generators High Voltage and Transformer to verify all documentation from Site FAT tested to Installation procures and documented and sign off as living documentation for EPC / EPCM Clients. Able to work on projects on Green/Brown field operations on day-to-day operations

Work Experience: -

Key Deliverables: -

July-2019 – Present

Working on non-engineering work due to COVID-19 Circumstance

Mar. 2015 – June 2019

Alberta Corp. Based in Victoria, British Columbia, Canada - Electrical Engineer Field Support and Construction Deliverables

Senior Project Manager / Management Distribution Projects of small and large capital projects across British Columbia and Alberta on causal for the progress report, workforce management, procurement for sites Engineering Support, field changes, As-Building, Documentation QA/QC Support, and Manpower management and, scheduling Construction Planning and Construction

On random site issues of emergency generators and Transformer to ensure the Integrity of the Equipment is when Emergency power is needed, and the switch of Transfer Power is turned on of all Critical power is energized and transformation purposes. Pole mounted Transformers are also checked to ensure the surrounding Installation is according to high tall tress not falling or shut down Power failures during lighting and Water and winter conditions and buildup of Wet snow for load bearing and frost conditions.

Small commercial sites or high rises checking Transformer Installation according to Canadian CEC and design applications and Data Sheets for variations and support as part of construction, deliverables, and Documentation purposes.

July 2014 - Feb. 2015

Fluor EPC Canada Edmonton for Shell Scotford Quest Carbon Capture and Storage (CCS) Project at Shell Fort Saskatchewan Plant Site.

Lead Electrical Heat Tracing (E.H.T) Field Engineer, Site Engineering Design & Construction Support.

Relocated to Shell Scotford plant site, for tie-ins off Mod Yard modules at Shell Scotford Modules as part of interconnects and site-built installation and response to RFI’s, FCNs, and DCN’s. As part of System completions of modules and interconnects, walk downs to ensure that Fluor Constructors need to complete any punch items and Issues at site work. Fluor Constructors, Electrical contractor to rectify and any As-Built, that needed to incorporate for documentations and turn over for System turnover binders.

Continuation to plant Site

Jan. 2014 – July. 2014

Fluor EPC Canada Edmonton, at KBR Mod. Yard, for Shell Scotford for Quest CCS Project at Fort Saskatchewan

Lead Field Engineer for Electrical Heat Tracing (E.H.T.) at KBR Mod Yard Construction Support.

Construction and walk-down Support.at KBR Mod Yard Modules assembled for the Installation of Heat Tracing Cables as per design, supervision, and installations and response to RFI’s, FCNs, and DCNs. Walk down of pre-installation and after Installation of traces. Before shipment to the site walk down to identify punch items for the Laird Electrical contractor to rectify and any As Built, that needed to be incorporated for documentation and Turnover Module binders.

April 2011 - April 2013

AMEC EPC Canada for Kearl Lake, ExxonMobil, Phase One, Fort McMurray, AB, CA

Electrical & Instrumentation review Engineer for overall Plants at Kearl Project

ExxonMobil, at Home Office.

On-Site at Kearl Lake Continuation Electrical and Instrumentation Field Engineer at Kearl Lake ExxonMobil, Site Support Location Fort McMurray. AB.CA.

Relocation to Site Engineering to support construction and responses to (R.F. I’s) Request for information for site clarification for construction and D.C. N’s Design Change Notices, for Utilities, Froth, Sub-Stations, Hydro-Transport, Offsite. Implementation and completion and validations and setting and celebration of Instrumentation data sheets in conjunction with P&IDs than more than one thousand data sheets for commissioning, turn, and for Central Control Room (C.C.R) monitoring plant systems.

Electrical & Instrumentation review Engineer for overall Plants at Kearl Project ExxonMobil, at Home Office.

Throughout six months House Review of Overall Phase One (1) Electrical, Instrumentation, EHT, Loop Drawings, Diagrams, Cable Schedules, and Vendor drawings

Feb. 2009 - Sept. 2010

AMEC/Colt Calgary AB.CA for Shell Albion Sands, Jack Pine, Fort McMurray, Alberta, CA

Lead Electrical and Electrical Heat Tracing (EHT) Engineering, Design, and Construction Support at the Shell Jack Pine Project.

Utilities & Offsite (U&O) Silo Walk downs for Electrical Systems and Electrical EHT & QA/QC for Combination for EHT & Electrical Contractor Installations skids and Equipment...

Electrical Heat Tracing (EHT) and QA/QC. Contractor Request for Information (RFI’s, DCN’s & Point and Do’s and responding to engineered design. Responding to Punch cards on Electrical and EHT with Contractor has completed as design and signing off with Shell C&SU support.

Issues about Panel Schedules UPS, Normal Power, EHT Panels, and EHT Controllers. Boiler house, Heat Exchanger, and Pipe Rack.

U&O Silo Continuation Lead Electrical and Electrical Heat Engineer at Shell Jack Pine Project

Electrical Heat Tracing (EHT) and QA/QC. Contractor Request for Information (RFI’s, DCN’s & Point and Do’s and responding to engineered design. Responding to Punch cards on Electrical and EHT with Contractor has completed as design and signing off with Shell U&O support.

Silo as completed from green field to Brown Fields and Completion of all Punch Cards to Shell Albion requirements and Supporting WPCS. Documentation and turnover to shell ownership and As-Built drawings and Documentation.

Extractions and Tailings (E &T) Continuation

Lead Electrical and Electrical Heat Engineer at Shell Jack Pine Project Extraction and Tailings.

Electrical Heat Tracing (EHT) and QA/QC. Contractor Request for Information (RFI’s, DCN’s & Point and Do’s) and responding to engineered design. Responding to Punch cards on Electrical and EHT with Contractor has completed as design and signing off with Shell E&T support.

Coming on aboard at 80% in June and completed at Turnover to Shell in July.

Engaging in walk-downs on Electrical and EHT on systems, and QA/QC on Contractor Installation as per design Installations and EHT standards. Supporting with As-building of Panels schedules UPS, Normal Power, and EHT Panels and Controllers.

Completions of E&T Silo to Shell as systems completed and turnover systems with support of WPCS Documentation.

Froth Silo Continuation

Lead Electrical and Electrical Heat Engineer at Shell Jack Pine Project Froth Silo Fort McMurray AB.CA.

Heat Tracing (EHT) and QA/QC. Contractor Request for Information (RFI’s, DCN’s & Point and Do’s and responding to engineered design. Responding to Punch cards on Electrical and EHT with Contractor has completed as design and signing off with Shell C&SU support.

From July to September, on EHT with 78 EHT skids, supporting with walk downs with the Electrical Contractor three times on daily time as completions to Engineered as per engineered design and Standards before Installations of the spool.

Engaging in walk-downs on Electrical and EHT Systems, completions of all Panels schedules UPS, Normal Power, EHT and EHT Controllers, and completions of all Isometrics of EHT as per Design Installation and QA/QC Contractor Installations.

Flare Stack Continuation

Lead Electrical and Electrical Heat Tracing Engineer at Shell Jack Pine Project Flare Stack.

Froth Silo Partial supporting of EHT Installation by Jacobs Constructors on Design Installation but did not initiate Construction support.

Jan. 2008 – Dec. 2009

Jacobs EPC Canada Inc. AB.CA for Suncor Firebag Sulphur Plant 99 and Vapour Plant 91 Recovery Projects: -

Lead Electrical and Heat Tracing Field Engineer at Suncor Firebag Plant Site

Electrical and EHT Field Engineer, Engineering, Design, and Construction Support.

Vapor Plant Silo Walk downs for Electrical EHT & QA/QC for Combination for EHT & Electrical Contractor Installations skids and Equipment.

Electrical Heat Tracing (EHT) and QA/QC and incorporated as per the engineered design of P&ID’s drawings.

Liaison with Electrical Contractor as part of their Electrical Construction and Installation of Engineering design Scope and Specifications of Suncor Standards requirements.

Consisting of Multi-Discipline Piping ISO`s, Mechanical, Structural, Instrumentation Electrical single line medium Voltage and low voltage diagrams schematics, wiring diagrams, cable schedules, Heat tracing Isometrics in conjunctions with panel schedules and set points controllers, vendor drawings, Datasheets Electrical and Instrumentation.

Field checking contractor’s mark-up drawings and redlined detail for Final As-Build’s as per Suncor standard Installations details.

Project-related walk-downs and pre-commissioning, Start-up with Electrical Contractor to sign off to Turnover Plant Facilities Operations.

Lead Electrical and Instrumentation Engineer at Home Office- Continuation

Field Engineer on Site for Suncor Energy Firebag Stage # 3 Projects at Fort McMurray, AB, CA.

At Jacobs Calgary office organizing and gathering Turnover (T.O) packages for Firebag Stage 3.

On-site at Suncor Firebag # 3 resolving site Electrical issues and responding to RFI’s (Request for Information) and FTR’s (Field Trouble Report) general meetings with Electrical Contractors on day-to-day schedule and issues and Construction.

Continuation Petro-Canada (PCOSI), Jacobs EPC Canada, Fort Hills, Fort McMurray, AB. CA

Engineering Design Implemented at Calgary Home Office Lead Electrical and Instrumentation Design Engineer Specialist for Petro-Canada (PCOSI)

Front-end work of feed Estimate with silos and Utility and Offsite (U&O) as per Jacobs’s scope of work consisting of preliminary design of Construction Power Feeder cables, lighting, Trenching, Transformers, MCCs, Grounding, heat tracing loads layout of 34.5kV Switchgear buildings mobile 34.5kV Emergency Diesel Generators to feed Temporary feeds.

Construction power skids.

Fiber Optics Feed Estimate Overall Site Plant application. Front end Lead of partial detail design of Power Distribution of 144/72/13.8/ 34.5/5kV and 600V Early Site construction Power requirement, Substation layout of MCC, Transformers, and related Electrical equipment.

Underground Power distribution Cable routing of feeders Primary and Secondary.

Modification of Electrical Design Standards and Installation details for the Construction Project

Mar. 2006 – Dec. 2008

Bantrel EPC Canada, Calgary, AB.CA. For Petro-Canada, R.C.P Site at

Sherwood Park, East of Edmonton, AB.CA.

Electrical & EHT Field Engineer, Engineering Design & Construction Support

Utilities & Offsite (U&O) and Coker Silo Walk downs for Electrical Systems and Electrical EHT & QA/QC for Combination for EHT & Electrical Contractor Installations skids and Equipment.

During the Design Phase of in-house Engineering in Calgary reviewing every week and feedback and seeing any Issues.

Site Overall Field Electrical Specialist Lead for Crude and Coker.

Responded to contractor-generated requests for information (R.F.I.’s), non-conformance reports (N.C.R.’s), and Engineering Change Notices (E.C.N.’s).

Supported vendor equipment issues, for clarification for construction Installation issues for completion of Project.

Onsite visits with the contractor, progress, and projection of work schedules and highlight any discrepancies and issues with the required equipment and ongoing construction.

Engineering Design Issues (E.D I’s) construction-related on-site Issues.

Completed site construction installations as per Client Installation and specification and on schedule timely manner.

Previous Engineering EPC Companies Experience ON Contract on Request:

Fluor Canada Ltd, EPC for Syncrude Canada EPC at Fort McMurray, Alberta, CA (On-Site)

Fluor EPC Canada for On-site Plant and Alliance 21,

UE-1 Projects for Syncrude Canada EPC, CA (On-Site)

Alberta Engineering, Consulting and Management

Tri-Ocean EPC Engineering Ltd. Calgary, Alberta, Molikpaq Caisson Offshore Process and Drillings Platform

T.G. Engineering Ltd, Calgary, Alberta, CA Three Control Panels to replace Control Rooms

Stone & Webster, Cimarron, Kenonic (SWCK) Alliance for Trans Canada Pipeline based in Calgary, Alberta, CA

Esso- Colt EPC Engineering Alliance, Calgary, Alberta, CA All Pumping stations in Cold Lake Area Locations

Westcoast Energy Inc. EPC, Vancouver, BC, CA Modification and Minor Capital Projects

Stothert-Christenson Engineering Ltd, Burnaby, BC, CA

ESSO Petroleum Canada Ltd, Port Moody, BC, CA (On-Site) As-Builds and Capital Projects Evening Shift

Syncrude Canada Ltd, Fort McMurray, AB, CA

Kilborn Engineering Ltd EPC, Saskatoon, Saskatchewan, CA. Project Husky Oil & Gas U/G Duct Bank design.

H. A Simons Vancouver EPC, British Columbia, CA

Pulp and paper related across BC Capital Projects

St, Lawrence Cement, Mississauga, Lakeshore, Ontario, Canada. Cement Process and Plant Update Project

Ministry Of Government Services Lakeshore District Ontario, CA. Facilities Update and Tender Projects

I.B.M Canada Ltd. 944 Don Mills Road, Ontario, CA, (IN House) Electrical Update on Production assembly and Design

Winkelaar Howard and Associates, Edmonton, Alberta, CA. All Correctional Facilities update and site Inspection.

Alberta Power Limited, Edmonton Alberta. CA. Residential Power supply and design Transformers and distribution supply

Syncrude Canada Limited EPC Fort McMurray, AB, CA (On-Site)

Interprovincial Pipeline Ltd, (IPL) Edmonton, AB, CA

Syncrude Canada Ltd, Fort McMurray, Alberta, Canada (On-Site)

Dow Chemical Ltd, Saskatchewan, AB, CA (On-Site)

Alberta Power Ltd, Edmonton, Alberta, CA

Imperial Oil Ltd, Strathcona Refinery, Edmonton AB, CA(Onsite)

Attwell Installations Ltd, For Texaco Oil, Edmonton, Alberta, CA. Project on Texaco Refinery Main Control Station and Tank Farm First in Canada to use TECK Cable Power. & Control Cables

Public Works Canada, Edmonton, Alberta, CA

Flint Electrical Ltd, Nisku Alberta, CA

Distribution Engineering Services Ltd, Edmonton, Alberta, CA U/G Power Distribution and Transformer Design

NOVA (Formally Alberta Gas Ethylene Ltd, Dow Chemical Ltd, Joffrey, Red Deer, AB, CA (On-Site)

SNC Totrup Services Ltd, EPC Edmonton, AB, CA

In-House Project for Dow Chemical Control Room Fort Saskatchewan

Stadium Engineering Ltd, Edmonton, Alberta, CA

Associated Engineering Services Ltd, EPC, Edmonton, AB, CA Water Treatment & Sewage Lift Stations Across Alberta

Computer-Related Skills and Expertise: -

Allan Bradley PLC Design and Layout Input / Output (I/O) Card modulation

Allen-Bradley HMI

Auto-Cad Release 10,11, 13, 14, 2000, 2002

Auto-troll II 9.2,10, & 10.0.2 (UNIX) Release

Cad Operator / Designer & P&ID

Data Spread Sheets for Cable & Conduit Schedule for Electrical / Instrumentation & Electrical Heat Tracing

Honeywell TDC

IBM Cad dam (In-House at IBM Toronto)

Instrumentation, Power Distribution, Programmable and Relay Based Systems

In-Tools Data System

Micro Station Bentley Micro Station Part I & II

Microsoft (MS) Windows)

Microsoft (MS) Windows

Microsoft Office, Excel Word, Power Plant

MS Windows, Data Spreadsheets for Cable, and Conduit schedule for Electrical / Instrumentation and EHT

PDMS 2-D & 3 D

Plant System 3D Module Database

Rebis Auto Plant Version 2.0 Level 1

Rebis Auto-Plant Version 2.00 & P&IDs

Rubicon Distribution System

Scada Communication System Via Site Location

Smart Plant Electrical (SPEL) & SPI

Unix Disk Vue

Variables Speed Motors Drives and Servo Drive

WPCS Documentation Plant 3D Module Database in Shell Canada on site

Education and Training as Follows: -

2016 - 2016 The Knowledge Academy School of Learning in Vancouver BC, CA

Project Management Professional (PMP)

2003 - 2003 Calgary, AB, CA, (EPC In-House Training) Rebis Auto Plant Version 2.0

Level 1 Cad, Operator/Designer, and P&ID’s

1999 – 2000 Southern Alberta Institute of Technology (SAIT) Calgary, AB, CA

PLC Programming Part I

1997 - 1998 Southern Alberta Institute of Technology (SAIT) Calgary, AB, CA

Auto-Cad Courses Part I & Part II- Micro Station Part I

1976 - 1984 Northern Alberta Institute of Technology (NAIT) Edmonton, AB, CA

Electrical Construction and Design/Semi-Conductor and Electronics Design and Drafting/Industrial Magnetic Controls/Industrial Electrical Controls/Computer Assisted Design and Drafting/Computer Added Drafting Hewlett-Packard Software/Canadian Electrical Code (Diploma)

Transition to move to Canada

1973 - 1974 East Ham, East Ham, London, England, UK

City Guilds “O.N.C” Ordinary National Certificate (Electrical Engineering)

1972 - 1973 East Ham College, East Ham, London, England, UK

City and Guilds "G" Star (Electrical Engineering)

1971 - 1972 West Ham College, London, England, UK

GCE “A” Advanced Level Pure & Applied Mathematics, Physical Actives

1970 - 1971 West Ham College, London, England, UK

GCE "O” Ordinary Levels: Mathematics, English, Physics, Engineering Science Art & Physical Actives

1964 - 1970 Sandringham Secondary School for Boys, Sandringham Road, Forest Gate, E7 London, England, UK

CSE’s Mathematics, English, English Language, Engineering Science, Music, Art, Metalworks, Woodwork, Geography, Technical Drawing, Biology, Physics, Physical Actives

Field Construction and site-wide Safety Training as Follows: -

ABCS # CSM 19650 & ABCS #FP 98732

Alberta Construction Safety Association

Assessments Tech back and peers’ assessment social media & Brian Dump

Confined Space Entry Syn./ ID 42385 & Confined Space Monitor

Construction Management Team (CMT) Environments

Construction Safety Training System (CSTS.Ver.3.2) 2004 Reg. # 585009 & 2006 Reg. # 004507 CSM2005-10

Defensive Driving Course (Site Related)

Drug and Alcohol Test (Regularly Done)

Fall Protection FP2003-01-R01

Firebag Projects Major Projects

H2s Alive at Suncor May 20, 2009

Health & Safety and Security Reference manual Doc, No. PCM-GY-0004

Hydrogen Sulphide (H2s)

Imperial Oil Resources Work Management Permit Program

Industrial First Aid (Site Related)

Interview Skills, Budgeting,

Motivation & Goal Setting, Assertive Communication

Occupational First Aid Level 1 #GSC-650060, 55M28.

OSSA # CSM60605 & OSSA #FP0203

Partials include Generic Workplace Hazardous Materials Information System (WHMIS)

Problem-Solving, Q Academy Setting Up Online Success Introductions & Ice Breaker Goals,

Respiratory Protection Fit Testing Jacobs Canada training on OSSA Regional Orientation Program AGD 2006-0C#411015

Safety Harness Fall Protection,

Scott Air Pack,

Self-Confidence & Self-Care

Stress & Anger Management

STS # FP2003-01 & OSSA # FP 3503

Taking Stock of What you’ve Got.

Wage Subsidy Workshop

Workplace Hazardous Materials Information System (W.H.M.I.S)



Contact this candidate