DAVID E. MANGAN, P.E.

**** *. **** ******* **., PO Box 421, Hazelhurst, WI 54531

H: +1-715-***-**** M: +1-715-***-**** E: ad3mnr@r.postjobfree.com SUMMARY OF QUALIFICATIONS

Dynamic Senior Project Manager with over 39 years of experience and proven track record in Client Relations.

Key Skill Set: Estimating, Project Buy-out, Budget Formulation, Scheduling, Project Cost Control, Value Engineering and Overall Project Management.

EDUCATION

MILWAUKEE SCHOOL OF ENGINEERING Milwaukee, WI

Graduated with Honors, May 1982 Bachelor of Science: Architectural and Building Construction Engineering Technology, G.P.A. 3.2 / 4.0

PROFESSIONAL CERTIFICATIONS / LICENSES

Registered Engineer, State of WI License number: 37132-006 TECHNOLOGY

Computer proficient, Microsoft Office, Procore, Sure Track, Constructware and Expedition. PROFESSIONAL EXPERIENCE AND KEY PROJECTS

Northcentral Construction Fond du Lac, WI 2022-Present Jobsite Manager

Berkshire at the Grove Stevens Point, WI

Historic Renovation of 121+ year-old Sisters of St. Joseph convent to Senior Housing. 85 units constructed in (3) existing building additions plus (3) new townhouses totaling an additional 17 units. Development of 13-acre site includes: site utilities, road construction, and extensive system of parking, walking and bicycle trails.

ESI Constructors Hartland, WI 2018-2021

Construction Manager

Reinhart Food Services Storage and Distribution Facility Shawano, WI New cold storage, distribution and maintenance facility. ESI Design Group. $31 Million. Project consisted of: a -10* freezer warehouse, 34*, 45*, 55* cooler storage warehouses, a 40* cold dock, a distribution warehouse, and a (2) story main office building. All structures joined by a connector link structure totaling 265,000sf. Additionally, a separate 15,000sf truck maintenance facility was constructed on a 45 acre fully developed site.

Great Lakes Coca Cola Alsip, Il

Reyes Holdings ASRS/Distribution Facility

New automated storage and retrieval system and distribution facility consisting of (11) stories of automated conveyor/structural steel rack storage and 15,000sf of load-out facility. CG Schmidt Milwaukee, WI 2013-2018

Senior Superintendent

Enerpac Corporation Columbus, WI

New Manufacturing/Distribution Facility. Zimmermann Design Group. $22 Million development of 23- acre site including infrastructure and construction of a new 167,000sf light manufacturing and distribution facility for the assembly and distribution of power pack units.

Airgas Corporation New Distribution Facility Germantown, WI EUA, $23 Million. Development of 21-acre site including infrastructure and construction of a new 220,000sf distribution facility for storage and distribution of gas and welding products.

Baraboo School District Baraboo, WI

Multiple School Maintenance and Security Upgrades. EUA, $9.3 Million. Replacements of roofs, windows, HVAC systems, transformer and electrical system upgrades, entryway remodels, and library addition to

(7) district schools.

Pine Valley Nursing and Rehabilitation Facility Richland Center, WI EUA, $17 Million. Replacement of 110 bed existing nursing facility with a new one level facility consisting of four wings of varying care and assistance. Included incorporating portions of the existing kitchen, laundry and loading dock facilities.

Baraboo High School Additions and Renovations Baraboo, WI EUA, $22 Million. New additions to existing school including: Commons/Main Entry, Fitness Center and Tech Ed facilities. Project also includes new HVAC system, new fire suppression system, electric service upgrades and extensive renovations to existing Locker Room, IMC and classroom areas.

Beaver High School Additions and Renovations Baraboo, WI PRA $40 Million. Additions/renovations to existing high school and security upgrades to various elementary schools throughout. Beaver Dam school district. AGRA Industries, Inc. Merrill, WI 2012-2013

Project Manager

Manage the design, construction and turnover of corn dryer and bulk storage facilities for multiple customers in WI, Indiana, and Iowa. Complete turnkey projects including site development, foundations, MEP work, fabrication, erection, start-up and testing of new facilities. Nestle’ USA Confections & Snacks Division Burlington, WI 2010-2011 Owner’s Representative/CM

Nestle’ Food Plant Burlington WI

Cocoa Bean De-bacterialization Addition

Ambitech Engineering Corporation, $6.9Million. Addition of a new (5) story de-bacterialization facility constructed for the specific purpose of sterilizing raw cocoa beans prior to the roasting, shelling, and chocolate liquor processes for candy/confection production. Building structure consisted of a five-story tubular structural steel framework situated on top of the existing Tank Farm facility. Entire building “seal welded” with foam filled dust covers on all horizontal surfaces to achieve a “Medium Hygiene” status. Building skin consisted of IMP panel and Sarnifil roofing. Debac units and conveying machinery supplied by Buhler-Barth and tied into the existing process at the bean conveyor bridge and bean roasters. Majority of installation performed in and amongst on-going product production. CG Schmidt Milwaukee, WI 2008-2009

Senior Superintendent

New South Campus Student Union, UW Campus Madison, WI Workshop Architects, $93 Million. Demolition of existing student union and construction of new 7 story, 300,000+sf state-of-the-art student union for the UW Madison Campus. Facility includes (2) levels of underground parking, 60 room hotel, bowling alley, concert hall, conference center, and multiple bars, restaurant, and retail spaces. Responsible for demolition, recycling, utility relocations, road reconfiguration, excavation, earth retention, dewatering, and tower crane erection. The Samuels Group, Inc. Wausau, WI 2006-2008

Project Manager

Key Projects:

401 Main Street Cedar Falls, IA

AHTS Architects, $1.7 Million. Renovation of circa-1900’s three story masonry building in downtown Cedar Falls, Iowa. Project included renovation of entire structure including structural analysis and repair of masonry walls and lateral bracing at each floor throughout the facility. Final build-out included a 3rd floor comedy club, 2nd floor tenant space and 1st floor TBD.

Parkersburg Senior Housing Parkersburg, IA

Samuels Design, $3.2 Million. Construction of a new 31,000 sf assisted living facility in Parkersburg, Iowa. Project consisted of a one story, wood frame facility with 37 efficiency, one- and two-bedroom living units with full kitchens. Other amenities included a full-service dining room, chapel, salon, fitness room and lounge/club room.

Central WI Engineers and Architects Weston, WI 2006 Project Manager

Responsibilities included marketing for new construction management department, working with architectural department on design/build projects, overseeing construction management projects and staffing civil projects as assigned.

M. A. Mortenson Brookfield, WI 2005-2006

Project Superintendent

Columbia St. Mary’s Mequon

$60 Million. Extensive multiple additions and renovations of existing hospital campus in Mequon, WI. Responsibilities included assisting project manager with contract buy-out and overseeing site utility installations.

VISTA Design and Construction West Allis, WI 2004-2005 Project Manager

Estimating and project management duties as assigned. CG SCHMIDT Milwaukee, WI 1999-2003

Senior Project Manager

Key Projects:

Ball Corporation Warehouse and Food Can Line Addition Milwaukee, WI 1-Source; $8.5 Million Construction of a new 230,000 square foot Nucor Pre-Engineered Warehouse and Palletizing Facility, and renovation of an additional 55,000 square feet of the existing facility for a new food can process operation. Project included complete design / build services encompassing extensive storm water management criteria and massive reconstruction of the existing plant for the new production line.

Waukesha Electric Systems Office Tower Waukesha, WI C.S.D. $6.5 Million. Construction of a new (5) story, 45,000 square foot corporate office tower dovetailing with the newly constructed manufacturing addition. Project consisted of a structural steel framework, concrete on metal deck floors, precast façade, and a ribbon type window system.

Waukesha Electric Systems Manufacturing Addition Waukesha, WI C.S.D.; $9.5 Million. Construction of a 70’ high, 89,000 square foot addition to the existing electric transformer manufacturing facility. Project included: 1,030 tons of steel and joists, precast façade, installation of (2) 75-ton, (2) 15 ton and (1) ton overhead cranes; extensive electrical distribution work and new storm water management piping.

Kelch Manufacturing Plant Menomonee Falls, WI

C.S.D.; $8.5 Million. Construction of a new 167,000 square foot injection molding facility for the Bemis Group of companies. Project included: 505 tons of steel and joists, precast façade, punched and curtain wall window systems, installation of (1) 15 ton and (2) 10-ton overhead cranes, extensive mezzanine space and laser screeded warehouse flooring. Facility is designed to house management, sales, engineering, manufacturing, warehousing, and shipping.

Hilton Garden Inn - Milwaukee Park Place Milwaukee, WI Matocha Associates. $6.7 Million. Project consisted of a three (3) story, wood frame, 128 room limited- service hotel with brick and E.I.F.S. façade. Approximately 73,000 square feet including swimming pool, restaurant, and meeting facilities.

C. R. MEYER & SONS COMPANY Rhinelander, WI 1996-1999 Project Manager

Lincoln County Courthouse Merrill, WI

Architecture Network; $1.3 Million. Architectural and mechanical renovations of 104-year-old Historic Landmark. Dome restoration utilized a contractor designed and built structural steel working platform to access work.

Marathon W.W.T.P. Addition Marathon City, WI

Becker-Hoppe; $1 Million. Expansion of existing wastewater facility including building additions, structural improvements, and equipment installation.

Specialty Minerals P.C.C. Addition Park Falls, WI Specialty Minerals; $600K. Expansion of existing precipitated calcium chloride plant to increase production for adjacent Fraser Paper Mill. Project included building additions and equipment installation.

Harley-Davidson Training Facility Tomahawk, WI

Entech Engineering; $1.65 Million. Construction of new division offices, training facility and expanded loading dock facilities. Project included multiple phases of Varco-Pruden building structures interfacing with existing production facility.

Louisiana-Pacific Conditioning - Thawing Ponds Tomahawk, WI Louisiana-Pacific: $600K. Addition of 200’ reinforced concrete thawing ponds to the existing OSB production facility. Project included log transport system and VarcoPruden Building addition.

3M Roof Granule Plant Wausau, WI

3M Engineering: $500K. Multiple projects including bag house renovation at the Greystone Mine and plant remodeling / office additions at the downtown plant. CG Schmidt Milwaukee, WI 1991-1996

Project Manager / Superintendent

Key Projects:

Lab Safety Supply Warehouse Addition Janesville, WI T.D.I.: $7 Million. Addition of 160,000 square feet of high bay, super flat warehouse space. Project consisted of 480 tons of structural steel, mechanically adhered white roofing system, 100% E.I.F.S. façade, extensive expansion of computer systems and office space and construction of a new kitchen / food service wing.

Ethan Allen Villas Cottage Remodel Wales, WI

Torke-Wirth-Pujara: $1.2 Million. Extensive renovation and reconstruction of a 7,300 square foot cottage prison facility. Project included installation of state-of-the-art detention cells and in-house kitchen facilities.

Hartland Library Hartland, WI

Angus-Young & Associates: $900K. Construction of a new 11,000 square foot library for the Village of Hartland. Structure consisted of a structural steel framework with stone and E.I.F.S. façade.

West Allis Memorial Hospital West Allis, WI

MOB Addition and Renovations. Flad & Associates; $18 Million. Construction of a new six (6) story, 43,000 square foot Medical Office Building consisting of C.I.P. columns and decks, masonry and stone façade and ribbon window system. Project included: total renovations of out-patient, technical services and emergency areas, installation of an underground mechanical tunnel, power-house upgrades, expansion of existing surgical space and extensive site-work construction. TERM PROJECTS 1987-1991

MMSD Dewatering & Drying Facility Milwaukee, WI

Ch2mHill: $190 Million. Construction of a new 6 level, 200,000 square foot drying facility designed specifically to produce Milorganite. Project consisted of: (7) C.I.P. shear towers, (5) C.I.P. shear walls, multiple levels of composite deck construction, precast panel façade and multiple underground mechanical galleries.

MMSD Milorganite Storage Facility Milwaukee, WI

Ch2mHill: $23 Million. Construction of a new 14-silo storage and material handling facility designed specifically for the storage and distribution of Miloragnite. Project consisted of an (8) day continuous slip- form process, multiple underground pipe galleries, installation of all material handling machinery and extensive pile supported railroad facilities.

EARLY CAREER 1982-1986

1000 North Water Street Office Tower Milwaukee, WI

$40 Million. Construction of a new eight (8) story post tensioned parking facility and a twenty (20)-story structural steel office tower. Project included: Bentonite caisson foundation system, structural steel tower, granite façade and composite deck system. Construction was achieved by a triple tower crane set-up and jump sequence.

May and Speh Corporate Headquarters and Parking Structure Downers Grove, IL OPUS; $7 Million. Construction of a new three (3) story structural steel corporate headquarters and parking structure.

St. Joseph’s Medical Center M.R.I. Facility Wichita, KS P.D.C.: $3 Million. Construction of a 3,500 square foot M.R.I. building addition including magnet installation and all associated structural and mechanical work.

Tempe Office / Warehouse Facility Tempe, AZ

$1.2 Million. Construction of a new 56,000 square foot warehouse facility utilizing the concrete tilt-wall method of construction.

Menomonee Indian Reservation Keshena, WI

$8 Million Construction of one hundred seventy-seven (177) 3,4- and 5-bedroom houses scattered throughout the Menomonee Indian Reservation. Project included all necessary infrastructure and new tribal community building.

St. Luke’s Medical Center Parking Structure Milwaukee, WI

$5 Million. Addition of a three (3) story C.I.P. parking facility including the installation of new elevator towers.

Diamond Tower Condominium Milwaukee, WI

$18 Million. Construction of a new twenty-two (22) story, 80,000 square foot C.I.P. condominium tower. Project included all C.I.P. construction utilizing. “Flying Deck” forming system and an “inside climbing” tower crane.

REFERENCES: Available Upon Request