Michael Sissel
Fountain Inn, SC 29644
Cell: 864-***-****
Email- *******@*****.***
SUMMARY
Construction Manager / Foreman with background in both the commercial and private sectors. I have run production lines and are responsible for the production of these lines. Self-motivated with strong dedication to ensuring the task is completed properly and on time. Excellent skills in leadership, communication, organization, planning, and training. Capable of working well with others under deadlines and pressure. I am certified on the forklift at my current employer. I have also completed Leadership training at this employer. I am certified in first aid and safety through Unifirst.
PROFESSIONAL EXPERIENCE
August 2017- current
Self-employed
Work as a subcontractor for a home builder and remodeler
Roy Metal Finishing January 2018- current
Certified through RMF to operate forklift
Operate any of the barrel lines
Operate rack lines
Receive parts/ make work orders and put correct paperwork with the parts
Responsible for the production on the four-barrel lines and bake oven on third
shift
Train new employees on the barrel lines
Responsible for the employees timecards, that work on third shift barrel lines
Create shift reports for the lines I oversee
Use the computer to do the shift reports and get production reports
New South Construction Supply August 2016- July 2017
Operations Manager
Maintain all the bank records for the branch
Keep all the employees time records and approve for payroll
Maintain all safety records and meetings each month
Keep inventory levels supplied
Keep the facility clean for safety purposes
Complete all the month end paperwork for billing
Maintain all the records for the forklifts and trucks and send them to
the correct people to comply with DOT regulations
MAU, BMW JAN 2016- JULY 31, 2016
Drive a forklift to supply line with parts
Use SAP to see what parts are ordered
Verify inventory to insure correct levels
Legendary homes/ Meritage homes Aug. 2012 –Nov. 2015
Warranty Representative
Receive warranty request from home owners
Schedule a walk with homeowner to look at the warranty issues
Schedule contractors to perform work necessary to complete the work
MAU, BMW Manufacturing Feb. 2012- Aug. 2012
Logistics.
Drive a forklift to supply line with parts
Use SAP to see what parts are ordered
Verify inventory to insure correct levels
CMC Construction Services, Greer, SC 864-***-**** April 7, 2008- Nov. 2012 Operations Manager for local branch of worldwide provider of steel and concrete related products.
Schedule delivery of materials to job sites and businesses
Coordinate deliveries with clients
Approve employee time schedules
Maintain safety program for the branch
Manage inventory control
Provide customer service with walk-ins and over the phone
Maintain petty cash flow and cash drawer
WDG Development and Construction, Indianapolis, IN 317-***-**** Oct. 28, 2007 – April, 2008
Temporary contract position as Foremen in charge of remodeling the Hyatt Place Hotel in Greenville, SC.
Supervise a crew of fifteen full time employees
Order the supplies needed for the various tasks
Communicate with contractors that include electricians, plumbers, carpet and painting crews
Inspect the trade partners work to verify work matches the blueprints
Responsible for daily reports, time sheets and inventory of the furniture that is installed in the hotel rooms
Maintain rapport with the hotel staff on a daily basis
Lennar of the Carolinas, Greenville, SC 864-***-**** Oct. 2005 – Oct. 15, 2007
Construction Manager for this production home builder company. Was laid off due to downsizing through out the company.
Ordered the materials and scheduled the work to construct the homes
Managed up to twenty-three home sites at one time
Knowledge of Storm Water Protection Plan (SWPP) and Best Method Practices (BMP) to control erosion
Ensured compliance with DHEC requirements
T. Walter Brashier and Associates, Greenville, SC 864-***-**** Nov. 1992 – Oct. 2005
Maintained various commercial properties as well as Mr. Brashier’s personal residence
Constructed new barns and houses
Remodeled a home and retail buildings
Resigned to take position at Lennar of the Carolinas
Froehling and Robertson, Inc. Greenville, SC 864-***-**** Feb. 1990 – Nov. 1992
Technician that tested the compaction of soil on job sites
Performed slump test on concrete
Prepared the test cylinders for the break tests at the lab
Resigned to take position with T. Walter Brashier
Tindall Corporation, Spartanburg, SC 864-***-**** Jan. 1988 – Feb. 1990
Marked off the bed where the rebar was to be installed
Installed the metal plates for later welding that attached the wall panels to one another
Resigned to take position with Froehling and Robertson, Inc.
Miscellaneous
Worked side jobs for individuals such as deck building, screened in porches and remodeling
Planned the construction, prepared the material list and built the projects
Maintained several rental properties for individuals
References available by request