Post Job Free

Resume

Sign in

Construction Project Management

Location:
San Francisco, CA
Posted:
February 11, 2024

Contact this candidate

Resume:

* ****

DAVID MCDERMOTT San Francisco, CA *****

415-***-****

ad3jpg@r.postjobfree.com

SUMMARY

• Professional with 25 years of experience. Project experience includes; institutional, commercial, industrial, hospitality, government, healthcare and residential.

• Additional skills; AutoCAD, safety coordination, design, contract administration, risk management, construction QC / QA, project management, and technical knowledge. Expertise with architectural, construction, art, real estate, and building system oversight. EDUCATION

• Master of Architecture Degree; University of Manitoba, Winnipeg, MB 1989

• Bachelor of Environmental Studies Degree; University of Manitoba, Winnipeg, MB 1983

• Architectural Technology Diploma; Southern Alberta Institute of Tech. Calgary, AB 1980 LICENSE

New York License # 032283, Florida License #AR94814, Hawaii License #13511 NCARB – #65621 available to reinstate.

OSHA 30 Hour Safety Certificate

AMFS - American Medical Forensic Specialist

EMPLOYMENT

Construction Manager – Genco Systems Consultant for Federal Government GSA 7/8/19–present

• ICE Security upgrade to 12,000 sq. ft. facility in existing facility. TI. Real Estate Broker / Lease Contracting Officer interface. Door hardware push bar escape upgrade. Denver mega center security link, VSS digital camera upgrade of analog cameras. Review bids for approval. TICS Table review. Change Orders, RFI’s.

(Tenant Improvement Cost Summary). Lead construction of project. Change Orders, RFI, Submittal Fresno

• US Marshals / US Courts / FPD Upgrade 2 floors 11,000 SF carpet finishes, paint, and renovation of security TI. Door locks entry/exit including card readers and surveillance monitoring. Courtrooms upgrade. Weekly meeting calls with CBRE Team. Change Order approval / RFI and Submittal review. Budget was $2.1 M. TICS Table review. CD review, bid comparison, site inspections. Oakland

• FBI Initial Site meeting with Lessor site-walk and review of existing 2 story facility TI. Renovation of 7800 SF 2 story facility with roof deck. CCTV monitoring of gated entry and interior. Firearms & ammunition storage area. Furniture and conference room with whiteboard. Palo Alto

• SSA Facility VSS / IDS Systems / PACS TI. Real estate interface. Lessor interface. 1 story building 3600 SF. New carpet, paint, ceiling, LED lighting. Duress buttons at new Roxbury interview windows. Fresno

• VA Security upgrade – VSS renovation. Sound masking. TI. Real estate interface. New LED lighting, acoustical ceiling tiles, break room counter area with copier. New paint and carpet with new exterior windows and doors. Comment on Architect CD – construction document package. Assess construction bid. GC Bid review. Tenant Improvement Cost Summary. Review construction schedule. Pleasant Hill

• USDEA – Site Inspection of construction in progress involving W/W/Mesh and renovation TI. 4100 SF renovation T.I. New metal stud walls with drywall paint. New lobby with feature wall and glass doors. Roof top HVAC units with refinished, restriped asphalt parking lot, concrete curbs, ADA parking. Stockton 2 Page

QA / QC Construction Contractor – Dabri Construction Management/Skanska 5/8/19 – 7/3/19

• Responsible for daily report writing and coordination with the specifications and construction documents. 590 – 600 Minnesota Street – UCSF Graduate Student Housing Efficiency Units 5 & 6 story. Project Manager – Adib Construction & Engineering (ADCON) 5/8/18 – 4/3/19

• Front end business development, bid bond / contract underwriter surety application & review, LBE Certification, review procurement websites of past, present and future potential clients. San Francisco Senior QA / QC Construction Specialist – Dabri Construction Management / Skanska 3/17/18 – 4/16/18

• Responsible for daily report writing and coordination with the specifications and construction documents. 590 – 600 Minnesota Street, Graduate Student Housing. Two buildings of 6 -7 stories. Post tensioned concrete slabs. GFRC – Glass fiber reinforced concrete. Pre-cast concrete wall cladding with steel angle clip wall support. TPO roof membrane on fiberboard rigid insulation. Heat welded seams with superior UV protection. San Francisco

Senior QA / QC Construction – Dabri Construction Management 3/12/17 – 3/16/18

• Responsible for daily report writing and the coordination of specifications and construction documents. RFI, safety, submittal process for a SFMTA Public Works 46,000 sq ft $50,000,000 Motor Coach Maintenance – Administrative Facility located at Indiana St & Cesar Chavez. Civil construction interface for concrete sewer / storm drains replacement and underground tank storage. RFI, Change Order, Progress Payment, and Submittal Interface. Installation of 2 above ground 4000-gallon waste tanks. Security system includes fixed dome / PTZ dome peripheral cameras. Project close out and punch. Curtain wall glazing and waterproofing design, monitoring, and inspection waterproofing test. Director of Business Development & Strategy-Zazmic Finance 8/20/16 – 3/10/17

• Tower Power – Prospectus offering of $2.7M seed round initial offering. My involvement was strategy pitch / business development with Angel Investors for cell tower creation. San Francisco Forensic Architect – D.A. Doddridge & Associates Inc. 8/19/15 – 7/10/16

• 538 Valencia St – Apartments. Liaison Senior Trial Secretary / Attorney- Defendant – My role was site inspection / photos, report, client interview, fire science, origin and cause investigation San Francisco

• 350 Colusa Ave - Car Dealership / expert witness deposition / skylight fall case, plaintiff, research archival building codes, CAL-OSHA. Concrete slab on grade structure. ADA verification. Yuba City Project Manager - SF Window Factory / ADCON Construction 6/16/15 – 8/10/15

• Pre-Construction BART / SF Zoo cost estimating, sub – contractor quotes, material take offs, aluminum framing details, specifications, curtainwall, bid package, bond surety. ADA verification San Francisco Project Manager – Facilities Advisers International 6/19/14 – 6/10/15

• Reserve Study - 10 Unit Townhouse Development. Site visit, photos, client liaison, report compilation, Concrete slab foundation with grade beams. LIHTC, Section 8, HUD. NNN leases. Sunnyvale Project Manager QC Construction Forensic Rep - Quality Built LLC 5/19/13 – 6/11/14

• 1868 Van Ness Ave. – 38 Luxury Condos / Mixed Use 8 story – Concrete Construction, San Francisco

• 2655 Bush St. “THE DISTRICT” 81 Luxury Condominiums / Mixed – Use / KB Homes; 6 story podium, wood frame – Mid-State Residential Construction – Finished occupancy. Stucco cladding test. ISO 9001. 3 Page

Executive - West Coast Rep. - Verisk Insurance / AEI Engineers 9/23/11 – 4/3/13

• Senior Care Nursing Home – 72 beds - The outcome was a Parcel report on the project. Petaluma Data Management Center – 130,000 SF - Prepared a Parcel report. Santa Clara Senior Architect - UCSF Mount Zion Hospital 3/16/10 – 9/10/11

• Design Development of Surgery, 50 bed inpatient, REVIT BIM documentation $25,000,000 budget. Team of 3 architects with OSHPD and back-check submittal. Strategic planning of spatial design requirements and materials for ergonomic and anthropometric concerns. Medical equipment including diagnostic and medical imaging oversight. Maintained compliance with OSHPD Standards. and integration of requirements in the design and submission. Project progression involved Pre- Design, Design Development, Construction Documents. Liaison with authorities having jurisdiction. San Francisco

Health Sciences Center 1/16/09 – 3/10/10

• Neonatal, fluoroscopy, and site visits in determining adherence to specifications and contract documents - $75,000,000 budget. Maintained compliance with agreed upon scope of work. Project quality, cost, safety, monitoring construction progress, and building code regulations. Senior Architect - VA – Acute Care Psychiatric Administrative Facility 2/23/08 – 1/10/09

• 80-bed center will provide a continuum of mental health services, from inpatient to outpatient, with an additional research component. The 90,000 square-foot facility will house four units, each with 20 inpatient acute psychiatric beds. The project also includes outdoor enclosed gardens for the patients, a separate mental health research and office pavilion, and a utility building to service the complex. Most rooms are private, with some semi-private, and all have private bathrooms. Palo Alto Project Architect – RYS Architects 2/20/04 – 2/17/08

• Ritz Carlton Hotels / Resorts / Residences. Schematic design, value engineering, consultant coordination, work plan. Kapalua, Maui

• Hilton Hotels / client liaison, ADA requirements, concept, submittals, RFI’s, FFE, mentor juniors & staff of 3 delegation, 7 story hotel, specification interface. Oxnard, CA

• Hampton Hotels / 4 Story schematic, design development, contract documents, consultant coordination meetings, plan check approval, full bldg permit sets. Lodi, CA Property Condition Assessor / Partner Engineering & Science – Associate 1/24/03 – 2/17/04 Property Condition Assessment of 5 story 72 unit condo; Property management liaison with R.E Brokers Acknowledgements: Cambridge’s Who’s Who; NIBS - National Institute of Building Science - Seismic Innovation Conference Speaker – Washington D.C. AIA Continuing Education. Presenter: AIASF – Seismic Innovation Dynamic Architectural / Structural Integration the CASL System – AIA Continuing Education. Presenter NEC – San Diego CASL System. Speaker – Facility Reserve Management Conference / Las Vegas. WCEE Japan – World Conference Earthquake Engineering CASL Presentation. Software: Outlook, Adobe, Word, Photoshop, Excel, MS Project, MS Outlook, ACAD, Procore, PowerPoint. PROJECT LIST

4 Luxury Residential Multi-Family Condominiums – San Francisco 1868 Van Ness Ave. – 38 Luxury Condos / Mixed Use 8 story – Concrete Construction. Concrete slab foundation & superstructure. Two level underground parking garage. Mid-rise 8 story development with Italian white floors, European finishes and fixtures. Surrounded by prestigious and established San Francisco neighborhoods, the residences are just a block from Upper Polk Street with its great variety of retail, coffee and restaurant options. A new 365 by Whole Foods will open on Jackson at Polk. The all new construction features a beautifully designed lobby and halls, roof deck with great views of the Bay, and Russian Hill.

2655 Bush St - 81 Luxury Condominiums / Mixed – Use / KB Homes:6 story podium, wood frame – Mid-State Residential Construction – Underground parking garage with commercial mixed – use occupancy. Mid – rise 7 story development with European finishes and fixtures. 131 Missouri St. – 9 Luxury Condominiums, 4 story wood frame on matt slab construction. Finished occupancy. Concrete matt slab foundation with wood framing superstructure. 1201 Tennessee St. – Owner AGI / Avant Housing. 263 Unit Design – Build 235,000 sq. ft. Luxury Apartment Mixed – Use 1840 sq. ft retail space; 6 storys – mezzanine, 147 vehicle underground parking, 273 bikes. Devcon Construction. Units with high end finishes and fixtures. Stucco, brick, and wood finished exterior. 1 – 3 bedroom condominiums. Expansive views of the bay and city skyline from select residences. Amenities include a tech room, bike shop, fitness room, clubhouse kitchen & bar, outdoor landscaped courtyard with BBQ and fireplace, and community roof deck with views of the bay. Project is green point rated.

• Generous ceilings, with over 12’ living room ceiling heights in select 5th floor residences

• Sustainably-sourced Admonter wide-plank oak hardwood floors in kitchens, living rooms

• European floor-to-ceiling kitchen casework designed by Sozo Studio

• Full-height backsplash in kitchen

• White quartz countertops in kitchens and bathrooms

• Bosch gas range, oven and panelized dishwasher

• Panelized Liebherr refrigerator/freezer

• Blanco dual-spray kitchen faucets with Elkay sink

• Hansgrohe bathroom fixtures

• Porcelain tile in bathrooms

• Washer & dryer hookups

• Study nook in select residences

• Private outdoor patios and terraces in select residences

• Walk-in closets in select residences

• Walk-in showers in select residences

Industrial Facility-San Francisco

SFMTA Public Works 46,000 sq.ft. $50,000,000 Islais Creek Motor Coach Maintenance, Administrative Facility located at Indiana St & Cesar Chavez. Civil construction interface for concrete sewer / storm drain replacement and underground tank storage. RFI, Change Order, Progress Payment, and Submittal Interface. Tank installation included 2 above ground 4000 gallon waste tanks. Underground tanks included 3 tanks 3000 gallons and 1 tank 1000 gallons. Underground tanks were mounted on concrete and buried with pea gravel. Curtain wall water pressure testing inspections. Solar roof top installation includes 950 PV panels, inverters – LEED Gold requirements. Punch list and project close out including guarantees, manufacturer’s warranties turnover to client.

Retail – El Con Regional Shopping Center – 3601 E Broadway Blvd, Tucson, AZ. El Con Center is a 1,200,000 sq. ft. open-air shopping mall in the city of Tucson, Arizona, anchored by Cinemark Theatres, Target, The Home Depot, Wal-Mart, Ross, Burlington, and J. C. Penney.

Hospitality - Hotels

54 acres, The Ritz-Carlton, Kapalua, HI maintains the Honokahua Preservation Site, a recognized “wahi pana” (sacred site) that lies adjacent to the resort and serves as a destination where Native Hawaiians can gather to conduct ceremonies and protocol. In addition to this beautiful sanctuary the resort offers guests the following features:

• 463 hotel rooms, suites and Club Level accommodations featuring dark wood floors, marble bathrooms, vibrant island-inspired décor and designs

• Six dining experiences featuring local ingredients from the resort’s sustainable organic garden, fresh seafood and Pacific cuisine

• The Ritz-Carlton Spa, Kapalua featuring treatments inspired by ancient Hawaiian traditions and an array of body treatments, massage and facials, and a fitness center with cardio equipment and daily fitness classes so that you may “e malama kou kino,” which translates to “care for your body” while on Maui

• On-property and nearby recreational activities include tennis court, basketball court, swimming, surfing, boogie boarding, sailing, kayaking, outrigger canoeing, stand-up paddling. Whale watching, snorkeling, hiking and more via the Ambassadors of the Environment program

• Kapalua Resort shuttle available for transportation to nearby beaches, restaurants, shopping and golf courses within Kapalua Resort. Please visit the hotel's maps and directions page for further information

• Full-service wedding and vow renewal coordination

• Electric vehicle charging station

Hilton Garden Inn – Oxnard, CA

This Hilton Garden Inn features complimentary WI-Fi and a 24-hour Business Center, complimentary fitness center and a full-service restaurant on the property. Business Convenience

• Audio/Visual Equipment Rental

• Business Center

• Complimentary Printing Service

• Fax

• Meeting Rooms

• Photo Copying Service

• Printer

Comfort and Convenience

• Baggage Storage

• Beverage Area, Complimentary

• Coin Laundry

• Digital Key Available

• Electric Service

• Elevators

• Gift Shop

• Laundry/Valet Service

• Luggage Hold

• Multi-Lingual Staff

• On-Site Convenience Store

• Room Service

• Safety Deposit Box

Fitness and Recreation

• Fitness Room

• Pool

Accessibility Needs

• Accessible Rooms

• Accessible business center

• Accessible concierge desk

• Accessible exercise facility

• Accessible guest rooms with mobility features with entry or passage doors 32” wide

• Accessible hotel restaurant

• Accessible parking

• Accessible parking spaces for cars in the self-parking facility

• Accessible public entrance

• Accessible registration desk

• Accessible route from the accessible public entrance to the accessible guestrooms

• Accessible route from the accessible public entrance to the registration area

• Accessible route from the hotel’s accessible entrance to the meeting room/ballroom

• Accessible route from the hotel’s accessible public entrance to at least one restaurant

• Accessible route from the hotel’s accessible public entrance to the business center

• Accessible route from the hotel’s accessible public entrance to the exercise facilities

• Accessible route from the hotel’s accessible public entrance to the spa

• Accessible route from the hotel’s accessible public entrance to the swimming pool

• Accessible swimming pool

• Level or ramp entrance into the building

• Public Areas/Facilities accessible for physically challenged

• Service support animals welcome

• TTY for guest use

• Van-accessible parking in the self-parking facility

• Visual alarm for hearing impaired

Los Altos Public Schools

Almond Elementary School

• Enrollment 570 Students

Covington Elementary School

• Enrollment 514 Students

Loyola Elementary School

• Student Population 403

Santa Rita Elementary School

• Enrollment 570 Students

High-Rise Residential

• 25 story focus tower with 8 low rise condominiums

• 19 story tower

• 3 – 24 story residential towers

• 20 story luxury condominium tower

• 2 – 21 story towers

T.I

• Robert Half International Corporate Headquarters

• High – rise office tower 50 California St.

• 160,000 sq.ft.

• Site visits and drawing development

Federal Government GSA

• ICE Security upgrade to 12,000 sq. ft. facility in existing facility. TI. Real estate interface. Door hardware push bar escape upgrade. Denver mega center security link, VSS digital camera upgrade of analog cameras. New fence behind structure for access prevention. Fresno

• US Marshals / US Courts / FPD Upgrade 2 floors 11,000 SF carpet finishes, paint and renovation of security TI. Door locks entry/exit including card readers and surveillance monitoring. Courtrooms upgrade with new camera CCTV link to US Marshals monitoring. Budget was $2.1 M. Oakland

• FBI Initial Site meeting with Lessor site-walk and review of existing 2 story facility TI. Renovation of 7800 SF 2 story facility with roof deck. CCTV monitoring of gated entry and interior. Firearms & ammunition storage area. Furniture and conference room with whiteboard. Palo Alto

• SSA Facility VSS / IDS Systems / PACS TI. Real estate interface. Lessor interface. 1 story building 3600 SF. New carpet, paint, ceiling, and LED lighting. Duress buttons installed at new Roxbury interview windows.

Fresno

• VA Security upgrade – VSS renovation. Sound masking. TI. Real estate interface. New LED lighting, acoustical ceiling tiles, break room counter area with copier. New paint and carpet with new exterior windows and doors.

Pleasant Hill

• USDEA – Site Inspection of construction in progress involving W/W/Mesh and renovation TI. 4100 SF renovation T.I. New metal stud walls with drywall and paint. New lobby with feature wall and glass doors. Roof top HVAC units with refinished, restriped asphalt parking lot, concrete curb parking.

Stockton

Healthcare

• UCSF Hospital 40 bed Inpatient, surgery. Design Development of 1 floor renovation. Senior Architect - UCSF Mount Zion Hospital – San Francisco 3/16/10 – 9/10/11

• Design Development of Surgery, 50 bed inpatient, REVIT BIM documentation $25,000,000 budget.

Team of 3 architects with OSHPD and back-check submittal. Strategic planning of spatial design requirements and materials for ergonomic and anthropometric concerns. Medical equipment including diagnostic and medical imaging oversight. Maintained compliance with OSHPD Standards.

and integration of requirements in the design and submission. Project progression involved Pre-Design, Design Development, Construction Documents. Liaison with authorities having jurisdiction.

Health Sciences Center 1/16/09 – 3/10/10

• Neonatal, fluoroscopy, and site visits in determining adherence to specifications and contract documents - $75,000,000 budget. Maintained compliance with agreed upon scope of work. Project quality, cost, safety, monitoring construction progress, and building code regulations. Senior Architect - VA – Acute Care Psychiatric Administrative Facility 2/23/08 – 1/10/09

• 80-bed center will provide a continuum of mental health services, from inpatient to outpatient, with an additional research component. The 90,000 square-foot facility will house four units, each with 20 inpatient acute psychiatric beds. The project also includes outdoor enclosed gardens for the patients, a separate mental health research and office pavilion, and a utility building to service the complex. Most rooms are private, with some semi-private, and all have private bathrooms.

Palo Alto



Contact this candidate