Post Job Free

Resume

Sign in

Mechanical Engineer Crude Oil

Location:
Dickinson, TX
Posted:
February 10, 2024

Contact this candidate

Resume:

ad3i9h@r.postjobfree.com

Winlgen Reyes

**** **** **. *** **** St. Houston Tx. 77063

Phone Number: 832-***-**** .

ad3i9h@r.postjobfree.com & ad3i9h@r.postjobfree.com

Executive Profile

I am a professional in mechanical engineering with a specialization in surface operations; I am creative and committed to my work group. I like teamwork and I adapt to work environments. General skills

Constructability analysis, Cost-benefit analysis for investment projects Implementation plan investment projects and operations

Project budget control

Plant and pipeline construction specialist (ASME B-31.9, B31.3, B31.1, B31.4 Boiler & Pressure vessel code. API-650 Erection of atmospheric Basic and detail Engineering and Project Supervision. Engineering Project Coordination.

Work with Management to create the best strategy to develop a contract also participate in the project execution plans and estimates

Development of bid specifications, contractor / vendor identification and screening. Conduct technical and commercial bid evaluations.

Contractor selection (through the selection of technical offer & economical offer), Project budget control,

Process to request for information (RFI), the clarification of plans, drawings, specifications, and agreements.

Coordination of project safety resources and implementation of safety policies, programs and reporting requirements. Facilitator between the different groups operations, maintenance and contractor`s project group .

Proficient user of Microsoft Office (MS Word, Power Point, Excel). WORK EXPERIENCE

June 2021-Present ArcherRv`s (sales and Mechanical Supervisor) JULY 2007 – APRIL 2020. Petrojunin joint venture between PDVSA & ENI (Energy Nationally Italian).Puerto La Cruz- Venezuela

Project Manager of Design & Construction Engineering Basic Engineering.

Detailed Engineering.Construction, Commissioning, Startup, Responsible for the engineering, and construction plan.

Participating in the contract strategy.

Responsible in the safety plan and Participating in the operations plan. Monitoring the execution of the construction to be on time. Responsible for the design of the pipelines in all aspects. Responsible for the all the drawings concerning for the pipeline design (Mechanical, Electrical, Instrumentation and Civil). p&ids, pfd. April 1998 – 2007 Petrozuata CA (ConocoPhyllips / Pdvsa afíliate) Operations Superintendent at San Diego de Cabrutica, South Venezuela. In charge of the petroleum transportation from Zuata (Oil Production site) to Jose Refinery (180 miles 2 Pipelines Blend & diluents). Supervising daily plant operations in oil movements, pumping crude oil from one site to another in 200 Km, supervised the cleaning pigging of the pipelines on a 15 days basis. Transfer of custody. Operation of Batch to batch supervision/Metering operations in the daily pumping, oil custody transfer supervisor (7 tanks of crude oil). Supervised and Monitored the maintenance crew for the plant integrity. Also supervised the operating crew responsible for the maintaining and the reliability of the pumping plant at 100% efficiency, Analysis of de data collect it daily from the scada to improve the operations and supervise that the STOP security was well implemented and taken the action to the respective danger points to be solve.

Maintenance of the plant and the two pipelines

In charge of the measurement of oil batch in both stations. SHE delegate and chief officer for the Operations and maintenance for the all system including tank farm, pipelines and gas pipe, pumps stations among others Also during the construction phase I was the responsible for the Jose Pump Station ProjectLoading and unloading of ships in monoboy

May 1996-1998. Petrozuata CA (ConocoPhyllips / Pdvsa afíliate) Construction Superintendent at Jose Pump Station ..Jose - Venezuela During this phase: Responsible for the installation of three 250 HP booster pumps, four 2000 HP centrifugal pumps ( Main pumps ), three 750 HP booster pumps, seven Smith meter with capacities of 7 thousand BPH each, two pig traps of 40” and 24” diameters also responsible for the installation of piping related to the pumping plant. Diameter from 1”up to 36” (different schedules).

3 Three blended tanks 300,000 bbls and 2 two 80,000 bbls diluents tanks for the initial production phase.

Bachelor Degree in Mechanical Engineering. Louisiana State University Specialization in Petroleum Engineering Metropolitan University



Contact this candidate