Seeking senior managerial assignments in Project Management / Plant Operations/ Erection & Commissioning / Maintenance Operations with an organization of high repute. Professional Synopsis

A dynamic professional with over 3 decades of rich cross cultural experience in Project Management, Erection & Commissioning, Operations & Maintenance and General Administration.

Proficiency in managing erection & commissioning of various equipments and maintenance of the same for reducing downtime & enhancing operational effectiveness of equipment.

Deft in managing maintenance operations involving resource planning, In-process Inspection, Team Building, Development and Co-Ordination with Internal Departments.

Holds the distinction of implementing quality systems and various techniques for improving the plant operations along with Energy Conservation for cost savings.

Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.

Education

Diploma in Mechanical Engineering from Tamil Nadu Polytechnic, Madurai, under Board of Technical Education Madras in 1978.

Areas of Expertise

Erection & Commissioning

Anchoring on-site erection & commissioning activities for various equipments.

Ensuring completion of project within the time & cost parameters and effective resource utilization to maximize the output.

Installation and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities.

Reviewing engineering drawings, technical specifications, cost estimates for Installation & commission of equipment; reviewing & analyzing contractor's change order proposals & submittals. Operations & Maintenance

Planning and effecting predictive & preventive maintenance schedules for equipments; conducting periodic checks to ensure performance of various equipments.

Identifying areas of obstruction / defects and conducting service and repair to rectify the equipments through application of trouble shooting tools.

Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement specification & offer evaluation.

Quality Assurance & Process Enhancement

Ensuring adherence to Quality Standards and maintaining all related documents.

Establishing quality standards, implementing stringent quality control systems for incoming materials to enhance quality of products & reduce the rejection rate.

Implementing various techniques for cycle time reduction, entailing identification of opportunities, and analysis of data, conduction of tests, cost benefit analysis, implementation & post audits. Man Management

Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.

Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback.

Resolving interpersonal issues & working towards a harmonious work environment.

Allocating Technicians, Mechanics and trainees to their jobs based on high priority jobs basis.

Training of Technicians and Engineers in various trade and certifications. Employment Details

M/s. POWERMECH PROJECTS LTD

CHP-InCharge for O&M Projects at CGPL Site at Mundra. Since Aug 16 to Aug 17.

Role:

O&M for the entire Coal Handling Plant of the Coastal Gujarat Power Ltd - 4000MW power projects in two systems as External Coal Handling System and Internal Coal Handling System.

Sole responsible for the coal transfer from the ship unloading at Adoni west port Mundra and transferring inroute for 17 kilometers where the coal is partially stored at External Coal Handling System coal yard by stacker also stacking coal in ECHS and the balance Coal will be stored in ICHS and Bunker Feeding.

Specialized in Coal Management, Coal preservation, Maintained of Stackers cum Reclaimers, belt conveyors, Bunkers feeders, tripper.DFS.DSS, water lines and all other accessories.

Planning and executing of PMs, Master PMs, AMC for major equipments

Also responsible for labor management, customer meeting, local purchases and local laborer problems also.

M/s. FLSMIDTH PRIVATE LTD, CHENNAI

Since Dec 13 to June 15 Resident Manager – O&M Projects Role:

O&M for the entire Coal Handling Plant of the Coastal Gujarat Power Ltd - 4000MW power projects in two systems as External Coal Handling System and Internal Coal Handling System.

Sole responsible for the coal transfer from the ship unloading at Adoni west port Mundra and transferring inroute for 17 kilometers where the coal is partially stored at External Coal Handling System coal yard by stacker also stacking coal in ECHS and the balance Coal will be stored in ICHS and Bunker Feeding.

Specialized in Coal Management, Coal preservation, Maintained of Stackers cum Reclaimers, belt conveyors, Bunkers feeders, tripper.DFS.DSS, water lines and all other accessories.

Planning and executing of PMs, Master PMs, AMC for major equipments

Also responsible for labor management, customer meeting, local purchases and local laborer problems also.

M/s. VULCAN ENGINEERS PRIVATE LTD, PUNE

Duration: From Oct 12 to May 13 Site Manager-Erection & Commissioning Role:

Project Site: Visakhapatnam Steel Plant, Vishakhapatnam, India

Managed and erected vertical lime shaft kiln

The capacity of the each plant is 250 ton

The project was worth 200 crores and completed in time. M/s. PROMAC ENGINEERING INDUSTRIES LTD, BENGALURU

Duration: May 2011 to June 2012 Chief Manager (Erection & Commissioning) Role:

Project Site: Cement Corporation of India, Bokajan, India

Looked after total EPC contracts for the site as site in charge.

The capacity of the cement plant is 1200 TPD

Handled civil, mechanical and electrical works from scratch until the completion stage M/s. AL TURKI ENTERPRISES LLC, MUSCAT, OMAN

Duration; From FEB.10 to FEB.11 Senior Project Controller. Role:

Project Site: Petroleum Development of Oman (PDO), site at Marmul

Liasoning with PDO to carry out lump sum projects of flow pipe lines in Marmul, eastern part of Oman Up to connection to the well heads

Interaction with clients, PDO with technical guidance, design consultant, site PDO personnel and also interacting with various departments like material procurement, QA/QC, Planning, QS and site personnel for execution of work

M/s. ENERGO ENGINEERINGS PROJECTS LTD. NEW DELHI INDIA. Since Oct 08 - Jan10. Deputy General Manager – Projects. Role:

Project Site: Lanco Anpara Thermal Power Project-Anpara-C (2 X 600MW).Utter Pradesh. India

Liaising with Lanco Anpara Thermal Power Project Ltd to carry out the complete coal handling systems

4000 tons of Steel Fab & Erection of Conveyor Galleries,Trestles,Conveyor Structures, Take-up-towers, Junction and Transfer Houses, Crusher houses, Columns, tie-beams, Trusses, Trench pent houses and its allied structures etc.

1500 tons of equipment erections of Truck Trippers, Railway weight bridges, Apron feeders, Chutes for various Transfer Towers, Railway weight bridges, weight scales, Take-up-pullies, bend pullies, Drive Pullies, Motors, Gear boxes, various type of Fluid coupling and couplings, Primary and secondary crushers and screens, various type of gates, Stacker Reclaimers, Chutes and Bunkers, water pipe lines and sprinklers and pumps up to commissioning and handover to the client.

Looked after the execution of the project starting to commission also handing over to the client. Site billing, budgeting of site expenses, payment to the contractors etc

Interaction with Clients with Technical Guidance, Statutory Authorities, Labor Problems. AI-SUWAIDI INDUSTRIAL SERVICES CO.LTD, Jubail, Kingdom of Saudi Arabia Since Sep’07 – Sep’08 Mechanical Superintendent-Projects/Construction

Projects handled:

- Effluent Treatment Plant in Saudi Kayan.Jubail.

- Waste Water Treatment Plant in ARAMCO in Dhahran Role:

Managing activities pertaining to procurement of project items as per ARAMCO Procedure; interacting with other agencies for procurements, with site erection & commissioning activities; Aramco and their representatives; preparing projects execution plan, various schedules required for ARAMCO standard.

Managing activities and governing the construction activities of Saudi Kayan Projects as a department representative and submit report to the management. M/s. TECPRO SYSTEMS LTD., CHENNAI

Aug’05-Sep’07 Construction Manager-Projects Execution Site: Bhushan Steel & Strips Ltd, Meeramandali, Orissa Role:

Liaising with Bhushan Steel & Strips Ltd, Merramandali, Orissa to carryout the material handling systems of RMHS, DRI & SMS-I

14000 tons of Steel Fab & Erection Conveyor Galleries,Trestles,Conveyor Structures, Take-up-towers, Junction and Transfer Houses, Crusher houses, Columns, tie-beams, Trusses, Trench pent houses and its allied structures of 12 Km of conveyors etc.

3000 tons of equipment erections of Truck trippers, Wagon Trippers. Apron feeders, various types of drive pullies, take up pullies, Tail pullies, Idlers, various types of couplings, chutes Coal and ore Crushers, Safety switches and other rotary equipments upto commissioning and handover to the client.

Looking after the execution of the project starting to commission also handing over to the client, included of site billings, site budgeting, payment to contractors and other problems

Interaction with Clients with Technical Guidance, Statutory Authorities, Labor Problems. KRISHNA ENGINEERING SERVICES

Jul’00-Aug’05 Chief Executive

Role:

Accountable for business development activities for Eclipse Combustion USA&UK- Burners and Combustion Systems.

Highlights

Green Tweed & Co: Wear Resistance Materials, Special Type Ö Rings, Gland Packings & Maintenance of Rotary equipments.

Elaster Group: Gas Flow Meters and its Control Systems FLS-FULLER BULK HANDLING (I) LTD. Chennai

MM’98-Jun’00 Executive-Construction

Site: Pneumatic Handling Systems & Railway Wagon Car Hauling Systems in National Aluminum Company at Damanjodi.Orissa.

Role:

Managing the construction activities and executing the project from starting stage to commissioning and handing over the client.

Handling finalization of the sub-contracts & budgets for the site works. Consolidated Contractors International Company (S.A.L) LNG Plant in Raslaffan – Doha Qatar Mar’95-May’96 Foreman

Responsible for erection of Steel Structures of the Gas Train Pipe Racks from the LNG receiving side to Flair.

Materials receiving from the client and inspection as per the drawings; arranging to send the pipe materials to Painting Contractors & Pipe bending contractors also issue the materials as per the isometric drawings to fab shop and site.

Co-ordinating with Transport Contractors, Lifting equipments, Cranes, Trailers, Trucks, Forklifts, etc.

Handling the labors, Riggers, Operators, for the vehicles, store keepers, material co-coordinators, etc. MARSHALL SONS & CO, INDIA LTD., CHENNAI

Mar’87-Mar’94 Construction Engineer

Performed as Resident Engineer and Handled various Projects like

- Mill Rejects Handling Systems-I and II in Mettur Thermal Power Projects in METTURDAM

- Ore Crushing & Screening Plant for Tamil Nadu Mangensite Ltd., Salem

- Cross Country Conveyor Systems-Stage-II in Talcher Thermal Power Station. Orissa Previous Assignments

DEFIL INDUSTRIES, ABU DHABI, U.A.E

Sep’84-Aug’86 Foreman

Oil Field Maintenance works contains maintenance of Heat exchanger, Boiler, Air Heater, removal of old tubes from tube bundle and fixing of new tubes, maintenance of oil field equipments, acid tanks, drill pipes, hole openers, hole enlargers, and other works

MECHANO-FABRICA, BOMBAY

Jul’82-Sep’84 Engineer

Sites: Hindustan Lever Ltd – Bombay.

INDUSTRIAL AGENCIES CORPORATION, NEW BOMBAY

Dec’81-Jul’82 Production In-charge

ESWARAN SONS & CO (I) LTD., CHENNAI

Aug’80-Aug'81 Fabrication Supervisor in Pressure Vessels SWAASTIC COMPANY. CO, CHENNAI

May’78-Aug’80 Supervisor for Fab Shop

Fabrication of Pressure Vessels, as per code requirements

Erection of the equipments and Steel Structures, Tankages, Boiler ancillary equipments, etc.

Maintenance and repairing of Heat Exchangers, Vessels and Oil Field Equipments etc.

Looking after the Procedure Test and Performance Test of the Welders and NDT methods etc. Personal Details

Postal Address : 19/10, Vinayagar Apartments,

2nd Street, Andavar Nagar, Kodambakkam,

Chennai-600024.

Passport Details ; S4926201

Place of issue : CHENNAI

Date of Expiry : 23/09/2028

Date of Birth : 21/06/1958.

Salary Details

Last Salary drawn : INR.1,50,000+Food. Accommodation Salary Expected : Negotiable for site condition