Past Project Lists:

*.Alnylam Project - ** Commerce Way, Norton, MA

$340 Million - $94 Million MEP

This project included both preconstruction and construction management services for this major life sciences complex. This project had a BIM layout with all sub-contractors included in the BIM modeling. It had multiple layers of both dirty and clean piping as well as a storage tank for firewater with a self-contained pumping station. This project had multiple buildings including Production, Pilot, Administration and CUP.

2.Alexandria Real Estate Equities 75/125 Binney Street, Cambridge, MA

$155 Million Core and Shell - $36 Million MEP

This project was executed in a highly collaborative delivery methodology and in a 100% virtual design and construction platform. This 382,000-sf project is comprised primarily of high-tech laboratory space in two buildings connected through a glass Atrium with 180,000 sf of below-grade parking and mechanical space.

3.Genzyme Support Facility-New York Ave, Framingham, MA

182,000 sf lab/office facility

$95+ Million Core and Shell - $19 Million MEP

A complete BIM building – with RODI, Ph neutralization, lab exhaust, snorkels, chill beams, custom air handlers with fan wall technology, heat recovery wheels, steam humidification, RO reject, variable speed diesel fire pump

Project included Advanced Commissioning and Validation

4.South Shore Hospital – 170,000 sf hospital complex – 55 Fogg Road, South Weymouth, Ma.

$90+ Million Core and Shell - $22 Million MEP

Building incorporated operating rooms, fume hoods, custom air handlers with fan wall, MRI, LINAC, CT SIM, tenant metering, med-gas, head walls, Pet CT, radiant ceiling heating units, process chiller

Project had advanced Commissioning

5.Fidelity - 900 Salem St, Smithfield, RI

$230 Million Core and Shell – $36 Million MEP

476,000 sf building including data center and data rooms, chiller banks, custom rooftops units, UFAD delivery system, RODI units, phased occupancy, 8 Meg of generation, multiple boiler systems, full serving kitchen

6.Brown University – Sydney Frank Life Science Center

$90 Million Core and Shell - $28 Million MEP

176,000 sf lab building including unfired steam generators, custom air handlers, steam boilers for sterilization, low temperature boilers for summer operation and high temperature hot water loop campus system, multiple locations of strobic exhaust fans, animal labs on a vivarium floor

7.Naval Ambulatory Care Center – Connecticut

$4.6 Million MEP

Retrofit of existing mechanical plant, installation of new penthouses and new 50,000 CFM air handlers, ductwork, VAV’s, medium and low-pressure steam systems, med-gas and plumbing of medical facility

8.Factory Mutual Test Center

$9.8 Million MEP

Install new boiler plant supplying underground hot water to eight buildings, new wastewater system processed through oil water separator, Waterboy, RO Units to supply 300,000 sf above ground storage tank, building included rooftops, air handlers, heat pumps, unit heaters, humidifiers, and speed drives

9.United States Navy, Newport, RI

$4.3 Million MEP

Erection of new boiler plant, environmental remediation, demolition of existing building including site work, foundations, building interior, electrical, mechanical piping, SCADA system, boilers and accessories

10.United States Government Veterans Administration, Brockton, MA

$2.7 Million MEP

Retrofit of boiler plant to include three new boilers, underground oil storage, contaminated soil remediation and facility overhaul

11.United States Air Force, Hanscom Air Force Base, MA

$330,000

Removal of all steam and condensate lines in concrete trench, install new steam and condensate piping, hanger assemblies, insulate and cover with stainless

12.United States Navy, Newport, RI

$1.1 Million

Renovations to Building # 102, Naval Undersea Warfare Center, Newport, RI

Selected renovations to building interior, including fire alarm, electrical, mechanical and controls, complete head end with lighting management.

13.United States Navy, Newport, RI

$4.3 Million

Repairs and alternations to Building #447, Naval Education Training Center

Complete retrofit of existing barracks including roof, interior, electrical and mechanical

14.United States Government, Veteran’s Administration, Bedford, MA

$2.2 Million

Installation of two boilers with full SCADA system with additional facility renovations