OVERVIEW

Edmundante Bugayong has more than ** years of experience in estimating, quantity surveying and construction supervision of Oil & Gas projects in the United Arab Emirates, Trinidad W.I. and Canada

Capable of preparing estimate as per as ASTM & API for process vessel/tank fabrication and repair, piping spools & structural steel but not limited to new project but also for plant maintenance and turn around works. Ability to prepare Microsoft project for the preliminary schedule and to review/make comment on Primavera P6 spreadsheet schedule.

Team player and integrates easily with others. Demonstrate a high level of self-organization, coordination, planning and safety.

EDUCATION

Canadian World Educational Services (WES) equivalency: Bachelor’s Degree (four years)

Bachelor of Science Degree in Electrical Engineering, Central College/ EIT

Authenticated Diploma and transcript of records in the United Arab Emirates

PROFESSIONAL

Accredited member in the Association for the Advancement of Cost Engineering International (AACE August 2010)

SKILLS\COMPUTER EXPERIENCE

Safety Training: (valid)

CSO

CSTS-20

WHMIS

First Aid & CPR/AED Level C

H2Salive

NAVIS Works (browsing)

Lotus Notes (printing drawing)

J-Plus (daily manhour update)

MS-Teams

AutoCad (redline mark-up)

SharePoint

OneDrive Online

Aspen Tech (formerly K-Base)

In-plant cost estimator (IPM)

Adobe Reader (printing drawing)

Microsoft Excel (advance)

Microsoft Word

Microsoft Power Point

WORK HISTORY

United Safety Ltd. – Al, Canada March 2022 – Present

Safety Watch (seasonal)

Project-based and project-specific for the turnaround season

HWT Siemens Transports Group - Alberta, Canada June 2017 - March 2021

Load Out Checker

Prepare daily load mapping as guide for forklift operators for loading oil products and chemicals

Titan Logistic and Supply Inc – Trinidad & Tobago, W.I. February 2016 - March 2017

Site Quantity Surveyor (contract type: temporary)

Review and check Subcontractor Variation Requests for contractual entitlement and validity content for Mechanical/Piping, Structural, Electrical & Instrumentation

Project:

•British Petroleum Juniper platform EPCI project 5100t, topsides

CESSCO Fabrication & Engineering Ltd - Alberta, Canada June 2015 - February 2016

Construction Estimator (temporary)

Review scope of work, read specification, addendum and comment.

Estimate man-hours for the installation of piping spool, identify the number of pipe joint to be welded on shop, pipe joint to be welded on site, flange bolt-up, pre-heat and stress relieving, cladding and pipe insulation.

Prepare MS project schedule and reporting.

Prepare Estimate Basis Memorandum.

Prepare price breakdown for the commercial offer for submission.

CoSyn Technology – Alberta, Canada

Project Cost Estimator October 2008 - March 2015

Populate the estimating template as required.

Actively participates in contingency discussions and recommendations (internal & client).

Prepare Estimate Base Memorandum patterned to Engineering Work Packages (EWP).

Conduct estimate peer review and development of benchmarking data.

Prepare monthly key quantity tracking update between Front End Engineering Design (FEED).

Prepare piping & structural detail quantity take-off and rate man-hours.

Support the project control department monitoring the manpower status update.

J Ray McDermott Middle East Inc. - United Arab Emirates January 2007 - August 2008

Quantity Surveyor – E&I

Member of the project management group to review/develop internal trend and change order estimates for mechanical piping, pressure vessel, E&I and structural disciplines.

Maritime Industrial Services (MIS) – United Arab Emirates March 2001 - January 2007

Construction Engineer / Estimator

Prepare work packages for submittal and supervise work activities with other staff members.

Site survey and prepare piping; and E&I estimate for the gas plant refurbishment/ jack-up rig.

Site supervision for modular steel structure and piping spool fabrication and hydrotesting.

Site survey, mark up client’s electrical drawings, pipe plan and elevation; and isometric piping drawings and prepare estimate for variation request submittal.

Drake & Scull International - United Arab Emirates September 1999 - January 2001

Mechanical Electrical & Piping (MEP) Quantity Surveyor

Prepare monthly billing applications, changes of MEP unit rates and invoices as per the progress tracking system for infrastructure and commercial building establishment projects for Abu Dhabi areas.

Jay Ray McDermott - United Arab Emirates September 1994 – March 1999

Estimator – Material Take Off

Prepare material take-off (MTO), rate labor and material for the erection of control valves, field instrumentation, mounting supports, related tubing & fittings including man-hour for testing and calibration.

Prepare MTO and erection man-hours for heat tracing tubing/cable.

Prepare quantity take-off and labor man-hour of piping shop fabrication, field installed/ offshore installed spools, bolt-up, pipe supports, total number of joint required, stress relief, pre-heat, hydro testing and radiography.

Prepare labor and material of heat tracing, pipe insulation, and cladding.

Prepare MTO for the fabrication and erection of various steel plate structures including flat bottom tanks, pressure vessels, and elevated water tanks.

Prepare MTO for fabrication and erection man-hour of sea-fastening.

Support the procurement group and proposals function to solicit accurate and timely proposals from material suppliers, equipment vendors and sub-contractors.

Volunteer Activities

Association for the Advancement of Cost Engineering International, Board of Director, Jan. 2023 - present

Couples for Christ (CFC), Edmonton Area South 2 Chapter head, 2023 - present

Catholic Twin Parish of St Agnes and St Anthony, CFC Choir member, 2023 - present

Knight of Columbus Nazareno Chapter, Board of Director, Inside Guard, 2021- 2022

Knight of Columbus Nazareno Bowling League, team Captain, Champion trophy 2021-2022

References

Ramon Ombac, Project Control, Edmonton, +1-780-***-****, ad3dc5@r.postjobfree.com

Pedro Panlaqui, Senior Piping Engineer, Edmonton, +1-780-***-****, ad3dc5@r.postjobfree.com

Romeo Busto, Project Manager, +1-281-***-****, ad3dc5@r.postjobfree.com