Post Job Free

Resume

Sign in

Construction Manager Abu Dhabi

Location:
Dubai, United Arab Emirates
Posted:
February 02, 2024

Contact this candidate

Resume:

Page * of *

CURICULUM VITAE

Name: AKEEL ABDULLAH MOHAMAD

Nationality: IRAQI

Marital Status: MARRIED

Date of Birth: 12-07-1961

Language Spoken: ARABIC & ENGLISH

Driving License: VALID UAE DRIVING LIECENSE.

Qualification: B.Sc. ELECTRICAL ENENGINEERING / UNIVERSITY OF TECHNOLOGY, BAGHDAD-IRAQ (JUNE-1983).

Computer Literate: MS WINDOWS OFFICE, Excel, Auto CAD ADRESS: Dubai-United Arab Emirates

Mobile Number: Mobile & WhatsApp [009**-**-***-****]. Iraq Mobile (009**-***-*** 7478).

E-M AIL: ad3bdc@r.postjobfree.com

ad3bdc@r.postjobfree.com

Work Experience:

(1) March 2022 – Till Date (Capital Engineering Consultancy) Working as a Senior Electrical Engineer

A. Sobha Furniture Factory – Kizad – Abu Dhabi

B. BAPS Hindu Mandir Project – Al Rahab’a Area - Abu Dhabi C. Food Factory (Future Foods) – Kizad – ADPC – Abu Dhabi D. Yas Bay Structured Car Parking – Abu Dhabi – Miral Holding E. Cloud Energy (Oil & gas)- Abu Dhabi – KIZAD – ADPC. F. Rolls Royce Show Room – Abu Dhabi - Al Saqer Group G. Poly Fab Factory – KIZAD – Abu Dhabi

Page 2 of 5

(2) July 2015 – August 2021 (A&P Electromechanical LLC) (72 Months) A. Al ZAHIA City Centre – Sharjah-UAE

(Test & Commission Manager)

M/s Khatib & Alami Consultant

B. The Address Fujairah Hotel + Spa (Fujairah-UAE)

(MEP Construction Manager)

M/s RW Armstrong Consultant.

C. Al Maktoum International Airport (Dubai-UAE)

(MEP Construction Manager)

M/s DAR Al HANDASA Consultant.

D. Doha Oasis Project (Doha-QATAR)

(MEP Construction Manager)

M/s Aecom Consultant.

E. Msheireb Downtown (Doha-Qatar)

(MEP Construction Manager)

M/s Gensler (Lead Consultant).

(3) April 2007 - July 2015 (AL Habtoor Leighton Specon LLC) (99 Months) A. AL-KHAWANEEJ FARM HOUSE

(MEP Project Manager)

Dr. SAMIR ABDULLAH /CONSULTANT

B. BUSSINES BAY HOTEL TOWER

(MEP Construction Manager) M/s

IBA CONSULTANT.

C. Mr. RIAD SADEK PRIVATE VILLA AT EMIRATES HILL-3

(MEP Construction Manager)

M/s NBC (NABIL AZAR) CONSULTANT.

D. AL MAFRAQ HOSPITAL-ABU DHABI

(MEP Construction Manager) M/s

BURT HILL CONSULTANT.

E. GRAND MILLENNIUM HOTEL-DUBAI

(MEP Construction Manager) MEP

Page 3 of 5

MODIFICATION WORK.

F. KHALIFA PORT – ABU DHABI

(MEP Construction Manager) M/s

AECOM CONSULTANT.

G. CLEVELAND CLINIC-ABU DHABI

(MEP Construction Manager) M/s

AECOM CONSULTANT.

H. Procurement Department

(4) Living Planet Project – Mirras Holding

5 (TRANSGULF Electromechanical LLC) (35

Months)

1. (MEP Project Manager) May 2004 –

April 2007 (TRANSGULF

Electromechanical LLC) (35 Months)

A. AL-JABER TOWER, DUBAI

MARINA (Project Electrical

Engineer) DEWAN AL

EMARA/CONSULTANT

B. AL ROSTAMANI TOWER, DUBAI

MARINA (Project Electrical Engineer)

KHATIB & ALAMI/ CONSULTANT.

(5) January 2004 - April 2004 (RELIANCE Electromechanical LLC) (3 Months) (MEP Project Manager)

A. (B+G+2) AL- KHARBASI BUILDING AT UM-SUQEEM 3rd. B. (21) VILLAS FOR Mr. Kalfan AL – HAGGRI

C. DUBAI METAL & COMMODITY FOR M/s AL- NAKHEEL.

M/s IAN BANHAM, DAR CONSULT/CONSULTANTS.

(6) APRIL 1998 - JANUARY 2004 (SENSAIRE Services LLC) (69 Months) (Project Electrical Engineer)

A. SHANGRI-LA HOTEL, SHAIKH ZAID ROAD [April 2003 – January Page 4 of 5

2004] M/s NORR CONSULTANT.

B. MAIN TELEPORT STATION AT JABEL-ALI [OCTOBER/2002 – APRIL/2003] M/s AL -TURATH CONSULTANT.

C. 2 (G +1) VILLAS AT AL SAFFA 1st. FOR THE RULLER’S OFFICE

[JANUARY/2002- OCTOBER/2002]

M/s GEMAC CONSULTANT.

D. AL-KHAWANEEJ RESIDENTIAL & DEVELOPMENT COMPLEX

[FEBRUARY/2001-JANUARY/2002]

M/s KENADY DONKAN& MOT MACDUNALD /CONSULTANTS.

E. CITY BANK AT OUD METHA, DUBAI [JANUARY/2000-

FEBRUARY/2001] M/s KENADY DONKAN CONSULTANT.

F. AL- HABTOOR MOTORS WORKSHOP & SHOWROOM - DUBAI

[JUNE/1999-JANUARY/2000]

M/s IAN BANHAM CONSULTANT.

G. DUBAI AIRPORT FREEZONE [APRIL/1998- JUNE/1999]

M/s DAR AL-HANDASAH CONSULTANT.

Duties:

1. Project Electrical Engineer:

A) Quantity Take Off from Contract Drawings, B) Make Estimation for Electrical Systems Quantities, C) Collect Quotations, and Suppliers Negotiation & Preparing Comparison Sheets, E) Shop Drawings & Electrical load Schedules Preparations, F) Coordinate Electrical Services with other MEP Services, G) Local Authorities Approval, H) Reviewing Material Submittal and Follow up Till Consultant Approval, I) Monitoring Progress of Work Execution at Site, J) T&C of Electrical Systems till Handing Over.

B) MEP Construction Manager:

A) Reviewing Shop Drawings & Material Submittals for MEP Services, B) MEP Planning Program, C) Ensure Delivery of Material to Site, D) Page 5 of 5

Monitoring Manpower Required, E) Supervision of Work Progress at Site, F) Ensure all MEP Services are Completed for Areas Handing Over.

(7) NOVEMBER 1995 – MARCH 1998 (BAGHDAD – IRAQ) (28 Months)

(Electrical Engineer)

A. URUK ESTABLISHMENT, FOR LEATHER INDUSTRIES, INCHARGE OF OPERATION & MAINTENANCE OF LARGE NUMBER OF SUBMERSIBLE PUMPS, HEAVY DUITY MACHINERY, DISTRIBUTION BOARDS & STARTERS.

(8) JULY 1993 – OCTOBER 1995 (BAGHDAD – IRAQ) (21 Months)

(Electrical Engineer)

ELECTRICAL ENGINEER WITH LOCAL CONTRACTOR INCHARGE OF OPERATION

&

MAINTENANCE OF “TANNING WATER TREATMENT STATION” WHICH CONSIST OF:

1. LARGE NUMBER OF SUBMERSIBLE PUMPS & AERATORS.

2. PUMPS FOR CHEMICAL FLUIDS TRANSMISION.

3. SEVERAL TYPES OF MULTI-POLES MOTORS.

4. DISTRIBUTION & CONTROL BOARDS FOR THE ABOVE.

(9) JANUARY 1987 – JULY 1993 (BAGHDAD – IRAQ) (78 Months) WORKING IN MINISTRY OF TELECOMUNICATION & TRANSPORT INCHARGE OF INSTALLATION, OPERATION, & MAINTENANCE OF MICROWAVE NETWORK THROUOUT IRAQ FOR THE FOLLOWING:

1. TRANSMITTER / RECIVER EQUIPMENTS AT 6GH-BAND.

2. MODEM-960CH.

3. REMOTE CONTROL & SUPERVISORY EQUIPMENTS.

4. TELEPHONE & TELEVISION TRSNSMMISION.

5. LINE SWITCHING EQUIPMENT.

(10) OCTOBER 1983 – DECEMBER 1986 (BAGHDAD – IRAQ) (38 Months) SERVED AS ELECTRICAL ENGINEER FOR OPERATION & MAINTENANCE OF TELECOMUNICATION EXCHANGES AT THE IRAQI CORPS OF ENGINEERS.



Contact this candidate