Email address: ad3aqm@r.postjobfree.com
Personal Information:
Name: Abdul Wasi
Nike/Name: Sediqyar
F/Name: Abdul Ghafoor
Nationality: Afghan
Date of Birth: 1980
Place of Birth: Logar
Marital Status: Married
Mother Tongue: Dari
Phone No. : (078*******) - (070-*******)
Objective: Civil Engineer
Education
2000-2004 BSc in Kabul University Engineering Faculty Department of Civil 1997-1999 Kulangar high school
1988-1996 Secondary school, Kulangar high school
2000-2003 English course up to Advance-2 in Aerobic English Language center Languages:
Type Reading Writing Speaking Understanding
English Very Good Very Good Very Good Very Good
Pashtu Fluent Fluent Fluent Fluent
Dari Fluent Fluent Fluent Fluent
Work Experience:
01/07/003-02/02/004 as Site Engineer in RDA (full time)
Control the site
Give the proper instruction to the site forces
Making the site reports
Solving the site problems
Monitoring &Solving problems of Clinics
04/03/004-05/06/004 as Site Engineer in Shelter for life (part time)
Monitoring &evaluation
Site inspection
Solving the site problems
Trade coordination
Working according to main drawings
08/07/004-09/12/004 as a Civil Engineer with ZUCC (part time)
Designing of building,culverts,road,irrigation Structures
Managing the site forces
Work and implementing the projects due to the engineering plans & drawings
Leading the site workers
Making the site reports
Working according to shop drawings
27/04/005-23/07/006 worked with (SDO) as (NSP) engineer (full time)
Providing proposal for NSP
Surveying NSP all Projects
Design of NSP all projects
Drawing of NSP all projects
Estimating of NSP all projects
Monitoring and controlling NSP projects
Preparing of NSP project reports
Motivating the site forces
Estimating &monitoring of Bridges
Designing, estimating,monitoring of roads
Estimating & monitoring Sub-electrical Projects
Designing,estimating &monitoring water supply Network
Designing,estimating &monitoring Buildings
01/08/006-03/12/006worked with (U.b.c.c.) as Quality Control Manager in Sharana Airfield
Control and checking Quality of Asphalt in Airfield
Estimation of Aggregate and Bitumen in Asphalt
Approved result of test for Asphalt
Managing site workers
Approved all Submittals of works
Drawing of (Lanes, Lots, Sub lots )and Location of station in Airfield
Filled Quality Control reports Forms and weekly reports Forms
Prepared work Plan for every weeks
Wrote Journal reports of projects
Test of Aggregate and Bitumen for mix of Asphalts
Prepared Mix of Asphalt Like approved (JMF)
Checking (Levels, Combers, dimensions )of Airfield
Control and checking Spread rate of Prime Coat and tack Coat
Control of Asphalt in Binder Coarse and wiring Coarse 04/12/006-30/12/007 worked with (U.b.c.c.) as Design Engineer in Kabul Maine office
Preparing proposals for UBCC
Estimating different Projects
Drawing different Projects
Designing different Projects
Preparing Work Plan & time schedule for Projects
Design of water supply projects By Epenet Software
Design of Building By (SAP, SAFE,ETABS ) Software
Drawings of Buildings & Structures By (Auto CAD) Software
Design of Road Projects By Auto Land Software
01/01/08-30/07/08 worked with (U.b.c.c.) as Project Manager in Jalal-Abad To Torkham Road
Preparing work Plan For Projects
Managing works according to Plans
Managing Staff & Equipment
Preparing Progress report of Projects
Comparing works to work Plans
Motivating Staff For Works
Control & checking Quantity and Quality of Works
Managing Quality Control Groups & Surveying Groups
Control the site
Give the proper instruction to the site forces
Solving the site problems
Control & checking Quality of Road according to test & Surveying 30/07/08-30/11/09 worked with(U.b.c.c.) as Quality Control Manager in Baharak To Khenje Road
Preparing Quality control Plan for Us-Corp of Engineering
Control & Checking Quality of works according specification
Managing Quality Control Team
Preparing Q.c.s. reports
Checking result of Test for Road
Control & checking Quality of Barrow material according to CBR-Test
Control & checking quality of Earth work according compaction test
Control &checking quality of Base Course according Compaction test and Mix design
Control & checking quality of Prime Coat and Tack coat according to Spray rate and mix design
Control & checking quality of Asphalt according to (JMF) & Core Test
Control & checking quality of Concrete according to Concrete strength test & Slump test
Control &Checking Foundation of structures according Bearing Capacity of soil
Control & checking Surveying works (Center Line, Level, comber, super elevation, width,thickness of layer
,Side Slope) according to Design documents
Preparing two weeks reports & Plan of Projects for Us-Corps of Engineering 01/12/09 –31/01/12 worked in (Louis Berger Group INC) as Site construction Manager (Bamyan-Doshi Road)
Preparing work Plan for (Bamyan –Doshi) Road.
Preparing daily reports of (Bamyan-Doshi) Road.
Control & Checking Quality of work according Scope of work and test result.
Motivating the site workers.
Control &Checking (Alignment & Level) of Road according design documents
Control &Checking Quality of work according test Result.
Control &Checking (Hard &Soft) Cutting according side slope.
Managing Staff & Equipments
Comparing works to work Plans
Solving the site problems
Wrote Journal reports of projects
Checking invoice of contractor
Managing MHP-Projects, Water supply projects, Protection walls and Bridges 01/06/12 –27/12/14 worked in CDCE JV as Site Construction Manager (Five Kunduz City Road)
Preparing work Plan for project
Preparing Progress report of Project
Comparing works to work Plans
Preparing Submittals of project
Dealing with Clint and owner of Project
Checking Invoices of Project
Motivating the site workers.
Managing works according to Plans
Managing Staff & Equipment
Control the site
Give the proper instruction to the site forces
Leading the site workers
Making the site reports
Control & Checking Quality of works according specification
Managing the site Team
Checking result of Test for Road
Control & checking Surveying works (Center Line, Level, comber, super elevation, width,thickness of layer
,Side Slope) according to Design documents
Preparing weekly reports & Plan of Projects for RIDF 01/03/15-30/10/15 worked with (P.M.C.) as Project Manager in Bano – Khenjan Road
Meeting with owner of project or Clint
Preparing work Plan For Project
Managing works according to Plans
Managing Staff & Equipment
Preparing Progress report of Projects
Comparing works progress to work Plans
Motivating Staff For Works
Control & checking Quantity and Quality of Works
Managing Quality Control Groups & Surveying Groups
Control the site
Give the proper instruction to the site forces
Solving the site problems
Control & checking Quality of Road according to test & Surveying
Writing and estimation of invoices of project
11/02/16 -31/12/16 worked with(U.b.c.c.) as Quality Control Manager in 2nd Line of Kabul-Logar Road
Preparing Quality control Plan for Ministry of Public Work
Control & Checking Quality of works according specification
Managing Quality Control Team
Preparing Q.c.s. reports
Checking result of Test for Road
Control & checking Quality of Barrow material according to CBR-Test
Control & checking quality of Earth work according compaction test
Control &checking quality of Base Course according Compaction test and Mix design
Control & checking quality of Prime Coat and Tack coat according to Spray rate and mix design
Control & checking quality of Asphalt according to (JMF) & Core Test
Control & checking quality of Concrete according to Concrete strength test & Slump test
Control &Checking Foundation of structures according Bearing Capacity of soil
Control & checking Surveying works (Center Line, Level, comber, super elevation, width,thickness of layer
,Side Slope) according to Design documents
Preparing two weeks reports & Plan of Projects for Ministry of Public Work ‘s Engineers 01/01/17 -15/08/2021 worked as Supervision Engineer in KMDP-Projects
Give the proper instruction to the contractor according design and specification.
Inspection daily work of contractors.
Writing daily report and weekly report for Project.
Control & Checking progress of project according time schedule and work plan.
Control & Checking Quality of works according specification
Checking result of Test for Road.
Control & checking quality of Concrete according to Concrete strength test & Slump test.
Control & checking Surveying works (Center Line, Level, comber, super elevation, width, thickness of layer, Side Slope) according to Design documents
Check and Estimating Invoices of contractors
Quality Control Engineer:
Inspection of all brick building
Inspection of clinics buildings
Inspection of water supply, west water and water tanks
Controlling and monitoring of main hole
Controlling and monitoring of hand hole
Monitoring & controlling of all communication setup
Inspection of all electric systems setup
Preparing of reports
Preparing the NCR forms
Applying of CORPS American engineering designs
Leading the construction Groups
Attending to meeting concerning sites activities
Solving the site problems
Controlling of steel eructation
Controlling &monitoring of steel structure
Survey,design,drawing and estimation of road
Control and checking quality and progress of asphalt road Computer Skills:
Ms Office (word, Excel, Access, PowerPoint, Outlook) Auto CAD, Epent (water supply Network program). SAP-2000, ETAP, SAVE & Civil -3D Contact Person:
Khowaja Gull “ Haqparast”
Deputy of district governor of Mohammad Agha district Mobile# 070*******
Engineer Abdul Wasi (Sediqyar)
Email address: ad3aqm@r.postjobfree.com
Mobile # 078******* or 070-*******