Post Job Free

Resume

Sign in

Quality Control Site Engineer

Location:
Shahre Naow, Kabul, Afghanistan
Salary:
1000
Posted:
February 01, 2024

Contact this candidate

Resume:

Email address: ad3aqm@r.postjobfree.com

Personal Information:

Name: Abdul Wasi

Nike/Name: Sediqyar

F/Name: Abdul Ghafoor

Nationality: Afghan

Date of Birth: 1980

Place of Birth: Logar

Marital Status: Married

Mother Tongue: Dari

Phone No. : (078*******) - (070-*******)

Objective: Civil Engineer

Education

2000-2004 BSc in Kabul University Engineering Faculty Department of Civil 1997-1999 Kulangar high school

1988-1996 Secondary school, Kulangar high school

2000-2003 English course up to Advance-2 in Aerobic English Language center Languages:

Type Reading Writing Speaking Understanding

English Very Good Very Good Very Good Very Good

Pashtu Fluent Fluent Fluent Fluent

Dari Fluent Fluent Fluent Fluent

Work Experience:

01/07/003-02/02/004 as Site Engineer in RDA (full time)

Control the site

Give the proper instruction to the site forces

Making the site reports

Solving the site problems

Monitoring &Solving problems of Clinics

04/03/004-05/06/004 as Site Engineer in Shelter for life (part time)

Monitoring &evaluation

Site inspection

Solving the site problems

Trade coordination

Working according to main drawings

08/07/004-09/12/004 as a Civil Engineer with ZUCC (part time)

Designing of building,culverts,road,irrigation Structures

Managing the site forces

Work and implementing the projects due to the engineering plans & drawings

Leading the site workers

Making the site reports

Working according to shop drawings

27/04/005-23/07/006 worked with (SDO) as (NSP) engineer (full time)

Providing proposal for NSP

Surveying NSP all Projects

Design of NSP all projects

Drawing of NSP all projects

Estimating of NSP all projects

Monitoring and controlling NSP projects

Preparing of NSP project reports

Motivating the site forces

Estimating &monitoring of Bridges

Designing, estimating,monitoring of roads

Estimating & monitoring Sub-electrical Projects

Designing,estimating &monitoring water supply Network

Designing,estimating &monitoring Buildings

01/08/006-03/12/006worked with (U.b.c.c.) as Quality Control Manager in Sharana Airfield

Control and checking Quality of Asphalt in Airfield

Estimation of Aggregate and Bitumen in Asphalt

Approved result of test for Asphalt

Managing site workers

Approved all Submittals of works

Drawing of (Lanes, Lots, Sub lots )and Location of station in Airfield

Filled Quality Control reports Forms and weekly reports Forms

Prepared work Plan for every weeks

Wrote Journal reports of projects

Test of Aggregate and Bitumen for mix of Asphalts

Prepared Mix of Asphalt Like approved (JMF)

Checking (Levels, Combers, dimensions )of Airfield

Control and checking Spread rate of Prime Coat and tack Coat

Control of Asphalt in Binder Coarse and wiring Coarse 04/12/006-30/12/007 worked with (U.b.c.c.) as Design Engineer in Kabul Maine office

Preparing proposals for UBCC

Estimating different Projects

Drawing different Projects

Designing different Projects

Preparing Work Plan & time schedule for Projects

Design of water supply projects By Epenet Software

Design of Building By (SAP, SAFE,ETABS ) Software

Drawings of Buildings & Structures By (Auto CAD) Software

Design of Road Projects By Auto Land Software

01/01/08-30/07/08 worked with (U.b.c.c.) as Project Manager in Jalal-Abad To Torkham Road

Preparing work Plan For Projects

Managing works according to Plans

Managing Staff & Equipment

Preparing Progress report of Projects

Comparing works to work Plans

Motivating Staff For Works

Control & checking Quantity and Quality of Works

Managing Quality Control Groups & Surveying Groups

Control the site

Give the proper instruction to the site forces

Solving the site problems

Control & checking Quality of Road according to test & Surveying 30/07/08-30/11/09 worked with(U.b.c.c.) as Quality Control Manager in Baharak To Khenje Road

Preparing Quality control Plan for Us-Corp of Engineering

Control & Checking Quality of works according specification

Managing Quality Control Team

Preparing Q.c.s. reports

Checking result of Test for Road

Control & checking Quality of Barrow material according to CBR-Test

Control & checking quality of Earth work according compaction test

Control &checking quality of Base Course according Compaction test and Mix design

Control & checking quality of Prime Coat and Tack coat according to Spray rate and mix design

Control & checking quality of Asphalt according to (JMF) & Core Test

Control & checking quality of Concrete according to Concrete strength test & Slump test

Control &Checking Foundation of structures according Bearing Capacity of soil

Control & checking Surveying works (Center Line, Level, comber, super elevation, width,thickness of layer

,Side Slope) according to Design documents

Preparing two weeks reports & Plan of Projects for Us-Corps of Engineering 01/12/09 –31/01/12 worked in (Louis Berger Group INC) as Site construction Manager (Bamyan-Doshi Road)

Preparing work Plan for (Bamyan –Doshi) Road.

Preparing daily reports of (Bamyan-Doshi) Road.

Control & Checking Quality of work according Scope of work and test result.

Motivating the site workers.

Control &Checking (Alignment & Level) of Road according design documents

Control &Checking Quality of work according test Result.

Control &Checking (Hard &Soft) Cutting according side slope.

Managing Staff & Equipments

Comparing works to work Plans

Solving the site problems

Wrote Journal reports of projects

Checking invoice of contractor

Managing MHP-Projects, Water supply projects, Protection walls and Bridges 01/06/12 –27/12/14 worked in CDCE JV as Site Construction Manager (Five Kunduz City Road)

Preparing work Plan for project

Preparing Progress report of Project

Comparing works to work Plans

Preparing Submittals of project

Dealing with Clint and owner of Project

Checking Invoices of Project

Motivating the site workers.

Managing works according to Plans

Managing Staff & Equipment

Control the site

Give the proper instruction to the site forces

Leading the site workers

Making the site reports

Control & Checking Quality of works according specification

Managing the site Team

Checking result of Test for Road

Control & checking Surveying works (Center Line, Level, comber, super elevation, width,thickness of layer

,Side Slope) according to Design documents

Preparing weekly reports & Plan of Projects for RIDF 01/03/15-30/10/15 worked with (P.M.C.) as Project Manager in Bano – Khenjan Road

Meeting with owner of project or Clint

Preparing work Plan For Project

Managing works according to Plans

Managing Staff & Equipment

Preparing Progress report of Projects

Comparing works progress to work Plans

Motivating Staff For Works

Control & checking Quantity and Quality of Works

Managing Quality Control Groups & Surveying Groups

Control the site

Give the proper instruction to the site forces

Solving the site problems

Control & checking Quality of Road according to test & Surveying

Writing and estimation of invoices of project

11/02/16 -31/12/16 worked with(U.b.c.c.) as Quality Control Manager in 2nd Line of Kabul-Logar Road

Preparing Quality control Plan for Ministry of Public Work

Control & Checking Quality of works according specification

Managing Quality Control Team

Preparing Q.c.s. reports

Checking result of Test for Road

Control & checking Quality of Barrow material according to CBR-Test

Control & checking quality of Earth work according compaction test

Control &checking quality of Base Course according Compaction test and Mix design

Control & checking quality of Prime Coat and Tack coat according to Spray rate and mix design

Control & checking quality of Asphalt according to (JMF) & Core Test

Control & checking quality of Concrete according to Concrete strength test & Slump test

Control &Checking Foundation of structures according Bearing Capacity of soil

Control & checking Surveying works (Center Line, Level, comber, super elevation, width,thickness of layer

,Side Slope) according to Design documents

Preparing two weeks reports & Plan of Projects for Ministry of Public Work ‘s Engineers 01/01/17 -15/08/2021 worked as Supervision Engineer in KMDP-Projects

Give the proper instruction to the contractor according design and specification.

Inspection daily work of contractors.

Writing daily report and weekly report for Project.

Control & Checking progress of project according time schedule and work plan.

Control & Checking Quality of works according specification

Checking result of Test for Road.

Control & checking quality of Concrete according to Concrete strength test & Slump test.

Control & checking Surveying works (Center Line, Level, comber, super elevation, width, thickness of layer, Side Slope) according to Design documents

Check and Estimating Invoices of contractors

Quality Control Engineer:

Inspection of all brick building

Inspection of clinics buildings

Inspection of water supply, west water and water tanks

Controlling and monitoring of main hole

Controlling and monitoring of hand hole

Monitoring & controlling of all communication setup

Inspection of all electric systems setup

Preparing of reports

Preparing the NCR forms

Applying of CORPS American engineering designs

Leading the construction Groups

Attending to meeting concerning sites activities

Solving the site problems

Controlling of steel eructation

Controlling &monitoring of steel structure

Survey,design,drawing and estimation of road

Control and checking quality and progress of asphalt road Computer Skills:

Ms Office (word, Excel, Access, PowerPoint, Outlook) Auto CAD, Epent (water supply Network program). SAP-2000, ETAP, SAVE & Civil -3D Contact Person:

Khowaja Gull “ Haqparast”

Deputy of district governor of Mohammad Agha district Mobile# 070*******

Engineer Abdul Wasi (Sediqyar)

Email address: ad3aqm@r.postjobfree.com

Mobile # 078******* or 070-*******



Contact this candidate