summary Thirty years experience in heavy construction of commercial, refining, gas processing, air separation, power, chemical, water/wastewater, land development, manufacturing, pipeline, and marine facilities with particular emphasis in construction operations, management and construction surveillance. Obtained heavy construction license in Louisiana and industrial, commercial, and residential license in Tennessee.

Representative Experience

Construction Manager

TransCanada Pipelines, Lexington, KY.

As Owner’s Agent, participated in constructability reviews and formation of contracts. Managed the construction of five NG compressor stations and coordinated all main line valve installations through three states and 600 miles of 36” pipeline.

Pre-construction activities included development of construction execution plans, construction procedures and processes and the division of responsibilities for all project stakeholders.

Managed pipe fabrication for all US facilities.

Assumed responsibility for successful project execution including safety, quality, budget, schedule and change management.

Project Executive

G.A.West and Company, Inc.

Linde/Bechtel Sabine Pass LNG

Managed the manufacture/fabrication, coating, insulation, testing and delivery of four ethane and methane cold boxes weighing 1,500 tons each. In April 2013, G.A. West was awarded a contract to construct four Ethylene and Methane

Cold Boxes for Liquefaction Trains 1 and 2, Sabine Pass Liquefied Natural Gas Plant. The 90 H x 90 L x 40 W components were constructed at G.A. West’s Black Bayou fabrication yard. Each approximately 1,400 ton box was moved by SPMT to our dock and loaded onto barges for transport to the erection site. The carbon steel boxes contained thousands of tons of stainless steel pipe and process equipment as well as proprietary brazed aluminum heat exchangers. All welds were subjected to 100% radiography. Challenging work requirements were met with innovative work processes, a proactive safety culture (450,000 safe man hours without a lost time accident) and demonstrated quality resulting in project delivery ahead of schedule. The project was completed in September 2014.

Area Manager, North and Central US

TransCanada Keystone Pipeline Project, Bechtel Corp., Houston TX

As Owner’s Agent during Phases I and II, participated in constructability reviews and formation of contracts. Managed the construction of sixteen pumping stations and coordinated all main line valve installations through four states and 800 miles of 30” pipeline.

Pre-construction activities included development of construction execution plans, construction procedures and processes and the division of responsibilities for all project stakeholders.

Managed pipe fabrication for all US pumping stations for Phases III and IV.

Assumed responsibility for successful project execution including safety, quality, budget, schedule and change management.

Project Manager

Lockwood Greene Engineering and Construction, Inc., Charlotte, NC

Provided constructability review of design documents prior to the bid phase and managed construction of Valero Energy’s 25,000 bpd CCR at the Paulsboro, NJ, refinery using UOP Platformer technology.

Provided engineering oversight, procurement, validation and construction management services for a broad spectrum antibiotic manufacturing complex at Merck’s Danville, PA, facility.

Construction Manager

T. C. Broome Construction Company, Inc., Pascagoula, MS

Self-performed refinery, air separation, chemical and gas plant construction projects for industry leaders including Mobil, Chevron, Shell, Hess and Praxair.

Seconded to Hess Oil Virgin Islands Corporation as Project Manager, Turnarounds, at the St. Croix, USVI, refinery.

Vice-President/Regional Manager

Sheats Frazier, Inc., Houston, TX

Managed operation of the southeast region office in Mobile, AL.

Dismantled, transported and re-erected a Praxair N2 plant from an Amoco refinery in Alabama to Monsanto Chemicals in East St. Louis, IL.

Constructed a hydrogen purification plant for Praxair at Olin Chemicals in McIntosh, AL

Constructed bulk gas and liquid delivery facilities and on-site cryogenic air separation plants for Praxair and Air Products in Alabama, Mississippi, Texas, Louisiana and New York.

Project Superintendent / Area Superintendent / Project Engineer

S&B Engineers and Constructors, Ltd.

Houston, TX

Supervised and managed construction activities for the following representative projects:

oDOE Strategic Petroleum Reserve, Cavern Piping Installation, Freeport, TX

oPetro-Tex Chemicals, Plant Upgrade, Houston, TX

oCrown Central Petroleum, Refinery Expansion, Houston, TX

oDenka Chemical Corp., Plant Reconstruction, Houston, TX

Seconded to BASF Corp., Freeport, TX, as Project Engineer. Responsible for management of capitol construction and maintenance projects plant-wide. Participated in Acrylic Monomers Plant construction projects in Ludwigshafen, Germany and Freeport, TX,

military service

Vietnam Era Veteran, Honorably Discharged, Sergeant/E-5, U.S. Marine Corps