John Vigliotti – Project Engineer

SUMMARY OF EXPERIENCE

Currently I have multiple years’ worth of design/build experience with Airports, as a Sr. Program Manager for the FAA as a liaison with Raytheon, with all types of design build facilities such as ARTCC, MALSR, PAPI, AFSS, LLWAS, DOPPLER, LRR, utilizing sighting criteria and advisory circulars. As a Sr. Project Manager, with the latest work being the South Terminal Complex and all associated lighting systems, air to ground navigational systems, and outside airport site acquisitions for numerous facilities for the Eastern Region’s AEA-451.3, Nav-Aids, Vis-Aids, Wx Section of the FAA’s 17 States.

Responding to RFI’s, Submittal Logs, Payment Requisition coordination through most recent program management tools such as Procore, Red Team, Primavera P3 scheduling, CPM and Suretrak, most MS based programs/Excel, Geopak, ARMS, RPMS, Plangrid, Prolog, Autotrol Series 5000, BIM 360 Modeling, Glue (As-Builts) Bluebeam Revu and Procore. I have held Bidder Conferences for Consultant acquisition, completed five year budget estimates through the Regional Program Management Systems for the FAA.

I have acted as a QA/QC Project Manager for all testing, certifications, shop drawings, as-builts and all associated work for facility commissioning, including submittal controls documents for A/E approval.

I have certifications and have been instrumental in obtaining permits for very sensitive Washington Monument Core off airport facility developments including SIR’s, all EDDA, Real-estate Land Acquisitions, issuing release for work to Engineers and Technicians for site Plans at (30%, 50%, 75% to 100% C.D.’s. Topographic, Demolition, Site, Grading, Drainage, SWPPP, Erosion Control, MEP, Architectural Plans).

I also have experience with all Airport CTV, ACS, Security, Command Center Installations, ITS, DMS, AV, Security, Electrical Fiberoptic and Mechanical Designs and installations. I also received Presidential Awards on Projects, with having Monuments with my name in Washington D.C. for Airport Design/Build Facilities. I have State Environmental Regulatory and Construction background (FDEP), and worked as a Sr. Structural Engineer for the Orange County Convention Center, Phase V.

EDUCATION

University of Pittsburgh, Pittsburgh, Pa., Bachelor of Science Civil Engineering 12/82.

Graduate Study in Water and Wastewater, including Contracts and Specifications, Federal Law

CERTIFICATION:

OSHA\Federal, Nuclear Density (Troxler Badge State of Florida Department of Transportation).

Concrete Inspector Grade IV, ACI (State of Florida, Department of Transportation.

Asphalt Certification, FDOT (asphalt concrete testing, Plant Paving Inspections).

OSHA Certified, State of Florida Asbestos Coordinator/Inspection Certification,

Value Engineering Certification, HAZWOPER, Final Estimates

P.E. Training Program Certificate FDOT.

SKILLS:

Fluent in three (3) languages, Geopak, CADD, COGO, Prolog, Primavera P3 scheduling, CPM and Suretrak, most MS based programs/Excel, Geopak, ARMS, RPMS, Plangrid, Prolog, Autotrol Series 5000, BIM 360 Modeling, Glue (As-Builts) Bluebeam Revu and Procore.

PROJECT EXPERIENCE

GOAA, MCO, South Terminal Complex Employee Parking and Facilities

The Ford Design Group, Sr. Airport, Program and Project Manager 10/2021 – Present

Manage materials, site development projects including commercial, institutional, and residential.

Construction of all Earthwork and related Operations, including Base Courses, Bituminous Treatments Surface Courses and Concrete Pavements.

Interfaces with design teams for MALSR, PAPI design and sighting through plan development and permitting.

Plans and specification analysis for constructability reviews. Oversee and provide coordination of design staff and other disciplines/Trades. Develop and complete applications, permits, engineering reports and specifications. Prepare and review engineer estimates.

Revies all hot Bituminous Mixtures-Plant Methods and Equipment. Milling of Existing Asphalts.

Expedite Request for Information, submittals, shop drawings, and expediting material deliveries.

Acts as Project Manager for review of monthly payment requisitions.

Resolve interface conflicts between the Company and subcontractors, as well as among subcontractors

Reviews all Stormwater reports and calculations for accuracy. Evaluates/reviews all drainage reports, Retention/Detention Reports and surface and subsurface findings.

Reviews all Geotechnical Evaluations for reports’ findings as submitted.

Develops, logs and coordinates all RFI’s, Submittals, for resolutions and processing.

Performs duties as they apply to the field supervisors on interpretation of drawings, specifications, IRs/RFIs, and questions for and from the Architect/Engineer.

Handles all Work scopes for closeout documentations, VDC Execution Plan, and VDC deliverables align to the project. Assist in developing and updating the schedule.

Aids on form detailing and special designs. Assists with production analysis studies.

Investigates all structures, Culverts, MES’s, Pipe Liners, Reinforcing Steel, Precast Concrete Box Culverts.

Investigates all Underground, above ground activities for accuracy and payment processing.

Manages crews and personnel for daily workflows and schedules.

Hosts meetings for all Precons work elements. Establishes milestones and critical long lead owner furnished/items for on time performance. Coordinates all GOAA Construction Committee, and Board meetings.

Interplan LLC, Sr. Project Manager, Site Development, 50 States 02/2019 – 09/06/2021

Design/Build Retail/Commercial establishments, reviews all Site Plans, Installation including; SIR’s, all EDDA, Real-estate Land Acquisitions, issuing release for work to Engineers and Technicians for site Plans at (30%, 50%, 75% to 100% C.D.’s. Topographic, Demolition, Site, Grading, Drainage, SWPPP, Erosion Control, MEP, Architectural Plans).

Review project documents to create RFI’s (Request for Information) for submission to Architect

Provides quantity take-offs of building elements to determine material and labor costs

Review project features with the Estimating Department along with Review subcontractor RFI’s, P.R.’s, A.S.I’s,

for determination of problem solving and assess degree of back charges and contract cost impacts.

Work with the Project Engineer and Superintendent to develop and maintain a project schedule with the appropriate attributes

Develop a submittal log, a project organization chart, and a material storage plan

Initiate project startup and closeout sheet and submit a copy to the construction department and set up and maintain project files

Initiates all Conceptual Design Reports as needed, Surveys (Limited, Full & ALTA) Post construction As-Built Survey Requirements and execution.

Initiates all EDDA’s Phase I and Phase II for SIR’s.

Responds to Zoning i.e. Engineering, Fire Marshall, Utilities, Environmental Protection, Fire…

Submits all applications for FDEP, NPDES, Water and Waste Water, WMD, ERP, Traffic/CAD FDOT Drainage and Utility permit applications.

Initiates permitting through plan submittal (Plot Room Orders) for County and City Requirements.

Issuing review/documents for Municipalities (Zoning, Engineering, Fire Marshall, FDEP).

Supervises ongoing CAD work and reviews Storm Water Designs, ERP Applications, WMD (Capacity Demand Calculations), Traffic CAD, NPDES, Water and Waste Water.

Employs consultants for services i.e. Landscaping, Photometric Surveys, Geotech along with other services as needed for projects through Construction, R.F.I. Response and closeout.

Works closely with architectural (in-house) through coordination and plan updates through weekly internal meetings and with consultants.

Handles all Legal Descriptions, Title Commitments, and orders through Legal teams.

Provides updates to Specifications to Consultants as needed and a applies for Variances as needed.

Reviews all Stormwater reports and calculations for accuracy.

Evaluates/reviews drainage reports, Retention/Detention Reports and surface and subsurface findings.

Reviews all Geotechnical Evaluations for reports’ findings as submitted.

Makes site visits as required for all documentations as required.

GOAA Sr. Project Manager Airport Executive, Closeout/Change Manger – On/Off Airport Designs (LLWAS, TSW, TAMR, PAPI, TRACON) 08/2015 – 01/2019

Terminal Construction/Installation of Airport Terminal and Airside(s) along with all Taxiways, APM, Multimodal Transportation Facilities, Parking Garages, Electrical Systems, Electronics…

Terminal Construction/Installation of Airport Terminal and Airside(s) along with all Taxiways, APM, Multimodal Transportation Facilities, Parking Garages, Electrical Systems, Electronics.

Coordinates all FDOT/Roadway work including asphaltic overlays, new pavements for Taxiways and Runways.

Pier construction, Pilings, Superstructure, Drainage, Concrete Beams, Inverted Beams, Culverts, Culverts, Inlets, Manholes, J-Boxes and all associated Pay Items for FDOT Specifications and Standard Indices.

Orders and performs Inspections for Deliveries for highway, bridge, ramp and toll plaza work conforming to FDOT UAM Manuals,

Verifies all FDOT Densities (QA/QC) for work in place, using UTCD, signage, Plans Prep. Manual, Design Criteria 2006 Design Controls, Geometrics, Traffic & ITS and UAM for Utilities.

Verifies all Pier, Inverted T’s positions, applications and base/Spread footer Locations.

Coordinates all utilities Fiber Optic and, Drainage, Structures, construction schedules, budgets.

Permitting Coordination for all facilities involving new construction for Compounds.

Interface with Construction Contractors in Providing their Data Requirements

Establishes Time and Schedule Requirements, Sequence of Operations and Reports and meetings, Labor and Wage Requirements, EEO, Testing Evaluations and Requirements.

Works closely with upper management for submitting to City, County and attends and hosts all meetings for Construction Committee Presentations.

OOCEA/BHA, CEI Highway/Bridge/Toll Office Manager/ Roadway/Bridge, 8/2013-07/2015

Engineer for Highway, Inter-coastal/Bridge, Toll and sidewalk projects.

Utilizes State, Federal and Turnpike design criteria and Standards as required for design/redesigns.

Manages and organizes conceptual designs on multiples projects.

Construction Administration ranging from 2 million to 500 million from conception to close-out.

Manage materials, site development projects including commercial, institutional, and residential.

Construction of all Earthwork and related Operations, including Base Courses, Bituminous Treatments Surface Courses and Concrete Pavements.

Reviews contracts for special provisions, using CPAM, Computation Books, Basis for Estimating and all Pay Item Sheets for Stockpiled materials, and all associated Engineering for ongoing work.

Plans and specification analysis for constructability reviews. Oversee and provide coordination of design staff and other disciplines/Trades. Develop and complete applications, permits, engineering reports and specifications. Prepare and review engineer estimates.

Revies all hot Bituminous Mixtures-Plant Methods and Equipment. Milling of Existing Asphalts.

Expedite Request for Information, submittals, shop drawings, and expediting material deliveries.

Acts as Project Manager for review of monthly payment requisitions.

Evaluate Design parameters, i.e. Drainage, RFC’s, Change Orders, Construction drawings.

Ability to review and comprehend the project specifications and requirements of the work items being done daily and report any inconsistencies.

Perform field measurements, provide technical assistance to field superintendent and foremen.

Evaluates Schedule(s) as they are submitted by Trade Partners, and provides updates as needed.

Structure, drainage placement i.e., concrete beams, piles, culverts, inlets, manholes J-boxes.

Maintains quantities in ITS per OOCEA/FDOT and all associated requirements for Pay Apps.

Supervise technicians for F.D.O.T. Highway Projects, using Standards and Specifications.

Coordinate all utility meetings, monthly disbursements, all Supplemental Agreements.

Air Resources Engineer, FDEP Central District, Orlando, Florida, 03/2008 – 07/2013

Responsible for Central Florida permits/Compliance Assurance for all Industry, including Power Plants.

Administer, interpret, and explain policies, rules, regulations, laws of all Industrial Permitting applications for all programs such as IWW, ERP, DWW, Solid Waste, Haz-Waste, Tanks, Landfills.

Ensures compliance for all Industrial processes and equipment. Applies control strategies to evaluate Power.

Plant and all of Central Florida’s Industrial systems performances, AG, SNTV, TV Minors.

Acts as Asbestos Coordinator for Central Florida’s Renovations and Demolitions of “Facilities”.

Acts as key contact for facility testing schedules and test for NOx, S02, NO, H2S04 using RATA.

Conducts site review for adequate emission control devices/facilities, Simple and Combined Cycle

Turbines and Heat Exchangers testing requirements being met for CEM’s.

Evaluates all of Central Florida Industry, permits and permit compliance for VOC’s, P.M. 2.5/P.M. 10.

Sr. Structural P.M., HCCII, Orange County Convention Center, Ph V, 03/2004 – 01/2008

Site/Facility Development through OCPS, schools, buildings, drainage, Design/Build.

Review Construction Plans and Specifications and evaluate them for constructability.

Familiar with Wind Design Criteria, Internal Pressure Coefficients per The Florida Building Code 2001

Edition, Chapter 16 (Reference ASCE-7-98), Embedded anchoring Wood Construction and Pre-Engineered and prefabricated wood Truss Installation, Classes of concrete construction and testing.

Monitors all phases of work such as, footings, foundations, waterproofing, HVAC, framing... etc.

Writes work scopes, bid packages, subcontractor performance, Surveys, Concrete, Electrical, HVAC.

Quality control of and delivery coordination of all structural steel (primary/secondary steel).

Construction concrete ASTM C90 and ASTM C270, Coarse Grout (ASTM C476),

Implements time and schedule control and controls project budget and profitability.

Reviews Structural Plans and Specifications and evaluates them for constructability.

Keeps construction drawings current by reviewing revisions addenda... both text and drawings.

Coordinates all RFI’s with A & E, Submittals, PCO, Change Orders.

Maintains As-Built drawings and finalizes closeout both Administrative and Operational.

Supervises all AutoCAD Drawing preliminary and final through as-built.

Sr. Terminal Construction and Installation Manager-Airway Facilities FAA, Raytheon

Washington National, Baltimore, Hancock, Richmond, Orlando/Sanford Terminal Construction and Installation Manager-Airway Facilities FAA, Raytheon, 11/1989 – 11/2003 (I have 3 FAA Facility/Monuments around the Washington National Airport with my name on the plaque. I also held meetings at the National Capital Planning Commission, NCPC for budget funding.

Washington National LLWAS System Design/Build Installation (including all EDDA, Land Acquisitions, ALS, Light Bars, Equipment Shelter/Distribution Panels, DEB, Conduit, Power Requirements, IFB Design and Routing. FAA Remote Transmitter Shelter Design all Electrical (NEC, G.F.C.I., NEMA Standards), all roadway crossings, RGS and DEB Conduit.

Headed up the LLWAS Program, 5 Year Budget, Specification/IFB, Distribution to the ASFO, ASFSO, SFO, for all DOPPLER, PAPI, AFSS, through Naviaids-Vis-Aids Wx, Section of Washington Headquarters.

BWI (Baltimore Washington International Airport, Runway 15L MALSR (Including, Transformer, Step-Up, Step-Down, A/G Navigational Electrical and Electronic for Transceiver Communications for Imaginary Surface, Glide Slope Lighting, Environmental Due Diligence, Permitting, Land Acquisitions, Commissioning of Facility).

Hancock International Airport Threshold Light bar Addition, R/W 14 MALS (Approach Light Plane and all associated Frangible Runway Structures, Powering up and Back-up Power Installations.

Richmond International Airport R/W 2 MALSR, Design/Build (MALSR Equipment Shelter, System Wiring, Remote Monitoring Systems, Distribution panels/Transformer Assembly, Threshold Bar, EMT Mounted Light Bar, MG-30 Low Impact Resistant Tower, Underground Manholes, Structural Foundations, FAA Facility Access Roads, FAA Drainage, Chain link Fence and Counterpoise Grounding Systems). Procurement of all Materials and Contractor Services to Facility Commissioning.

Terminal Apron Pavement Rehabilitation (pre-bid meeting, Project Manual, Special Provisions, Verifications for General Construction Requirements, Insurance Requirements, Safety and Security Requirements, Time and Schedule Requirements, Sequence of Operations and Reports and meetings, Labor and Wage Requirements, EEO, Testing Requirements, Pipe and Conduit Liners, Oil/Water Separators, Static Grounding Rod, Spall Repairing.

Creates, Designs Remote Monitoring sub-systems, Motoring, Generators, transformers, shelters. Terminal

Construction and Installation of Airports and Airway Facilities through Nav-Aids, Vis-Aids, Wx Section of

AEA-451.3. Initiates Powering up, conduit, DEB or Transmission Line routing of all equipment and

generators. Designs Audiovisual & Surveillance, emergency fire protection systems & installation.

Designs Surge suppressors and Counterpoise along with lightning and grounding.

Assesses DEB, PVC encased or concrete encasement of wiring and conduit.

Locates uninterrupted/Back-up power generator requirements/sources and designs.

Locates disconnect switch gear and pull box locations and all communications systems.

Voltage Drops Power Req./Calculations for wiring/facilities & draws Wiring Diagrams.

Evaluates Electrical and all Engineering Designs/MEP for constructability.

Area Manager Grade III- FDOT/BHA/OOCEA District IV, V and VI 08/1983 – 07/1989

Engineer for Highway, Inter-coastal/Bridge, Toll and sidewalk projects.

Environmental Drainage Calculations and ERP Permits. Water and Waste Water Management.

Construction Administration ranging, 2 million to 500 million dollars from conception, to close-out.

Evaluate Design parameters, i.e. Drainage, RFI’s, Change Orders, Construction drawings.

Supervision of technicians utilizing CADD, Geopak, hydraulics, pipeline and drainage structures.

Hire subcontractors and sublets work accordingly to perform construction functions.

Manage materials, site development projects including commercial, institutional, and residential.

Construction of all Earthwork and related Operations, including Base Courses, Bituminous Treatments Surface Courses and Concrete Pavements.

Plans and specification analysis for constructability reviews. Oversee and provide coordination of design staff and other disciplines/Trades. Develop and complete applications, permits, engineering reports and specifications. Prepare and review engineer estimates.

Revies all hot Bituminous Mixtures-Plant Methods and Equipment. Milling of Existing Asphalts.

Expedite Request for Information, submittals, shop drawings, and expediting material deliveries.

Acts as Project Manager for review of monthly payment requisitions.

Contractor and consultant performance verification for quantities in place and all work performed.

Structure, drainage placement i.e., concrete beams, piles, culverts, inlets, manholes J-boxes.

Supervise technicians for F.D.O.T. Highway Projects, using Standards and Specifications.

Coordinate all utility meetings, monthly disbursements, all Change Orders, RFI’s,

MUTCD, signage, Plans Manual, Design Criteria 2006 Design Controls, Geometrics, Traffic & ITS.

PROJECT LIST

Orlando International Airport, Airside 4 Wing Expansion, including all electronics, Air to Ground Navigational Systems, MALSR, PAPI, TRACON, LLWAS, On-Off Airport Facilities.

South Terminal Complex – 5 Billion Dollar New Airport and all facilities, Multi Modal Transportation System with APM, Airside, Landside, Parking Garages, Airfields, Off airport administrative and consultant campus, MALSR, PAPI, TRACON, LLWAS, 300 Acre Development that will accommodate super jumbo aircrafts, with onsite power plant and substations.

Washington National, Baltimore, Hancock, Richmond, Orlando/Sanford Terminal Construction and Installation Manager-Airway Facilities i.e., ARTCC, PAPI, President Clinton’s HeliPad, TRACON, NISC-IV through sighting criteria and Advisory Circulars, IFB Production and Bidder Conferences. Raytheon acted as A/E for all Designs and Circulation for approvals at the SFO, ASFSO,

Washington National LLWAS System Design/Build Installation (including all EDDA, Land Acquisitions, ALS, Light Bars, Equipment Shelter/Distribution Panels, DEB, Conduit, Power Requirements, IFB Design and Routing. FAA Remote Transmitter Shelter Design all Electrical (NEC, G.F.C.I., NEMA Standards), all roadway crossings, RGS and DEB Conduit.

BWI (Baltimore Washington International Airport, Runway 15L MALSR (Including, Transformer, Step-Up, Step-Down, A/G Navigational Electrical and Electronic for Transceiver Communications for Imaginary Surface, Glide Slope Lighting, Environmental Due Diligence, Permitting, Land Acquisitions, Commissioning of Facility).

Hancock International Airport Threshold Light bar Addition, R/W 14 MALS (Approach Light Plane and all associated Frangible Runway Structures, Powering up and Back-up Power Installations.

Richmond International Airport R/W 2 MALSR, Design/Build (MALSR Equipment Shelter, System Wiring, Remote Monitoring Systems, Distribution panels/Transformer Assembly, Threshold Bar, EMT Mounted Light Bar, MG-30 Low Impact Resistant Tower, Underground Manholes, Structural Foundations, FAA Facility Access Roads, FAA Drainage, Chain link Fence and Counterpoise Grounding Systems). Procurement of all Materials and Contractor Services to Facility Commissioning.

Orlando/Sanford International Airport Terminal Apron Pavement Rehabilitation (pre-bid meeting, Project Manual, Special Provisions, Verifications for General Construction Requirements, Insurance Requirements, Safety and Security Requirements, Time and Schedule

REFERENCES AND PROJECT LIST TO BE PROVIDED IMMEDIATELY UPON REQUEST