Post Job Free

Resume

Sign in

Heavy Equipment Sheet Metal

Location:
Ridley Park, PA
Posted:
March 11, 2024

Contact this candidate

Resume:

R Dennis Bradshaw

610-***-****

***E Chester Pike apartment F7 Ridley Park PA

ad39gl@r.postjobfree.com

Page 2

Reliable, consistent Roofer with 41 yrs. Experience. Adept at light and heavy equipment setup, work site organization and team collaboration. Dedicated to top-notch and long-lasting work.

Crew over sight

Job site management

Roofing repair work

Scaffolding set up

EPDM Roofing systems

Single-ply roofing

Able to lift over 50 lbs.

Power tool operation

Customer estimation

Roofing material knowledge

Sheet metal Roofing

Page 3

Experience [05/2020] – [present]

[Mechanic], [Jim Miller Roofing], [Ardmore, PA]

• Removed old roofing materials in an efficient manner

• Transported materials, tools and machines to installation sites

• Applied paint to unfinished edges of plastic panels using hand roller

• Light construction duties

• Built and disassembled scaffolds, bracing and barricades

• Hoisted tar and roofing materials onto roofs

• Took care of facility equipment, grounds, roads and fences

• Cut materials to specified sizes for installation using power saws and tile cutters

• Removed debris and other duties as assigned

• Worked overtime, including evenings and weekends, to respond to emergencies and fix unsafe conditions

[03/2018] – [05/2020]

[Foreman], [AA West Roofing], [Chester, PA]

Attention to detail

Installed and repaired roofs, flashings, and surfaces

Kept supervisor informed of job progress and material requirements

Worked overtime, including evenings and weekends, to respond to emergencies and fix unsafe conditions

Removed old roofing materials in an efficient manner

Continually cleaned work areas and equipment

[01/2015]-[03/2018]

[Mechanic], [Norm C Guyer], [Chester, PA]

Page 4

Cleaned roof surface before applying roofing materials

Cemented and nailed flashing strips over joints to achieve watertight seals

Overlapped successive layers of roofing material, determining distance of overlap using chalkline, gauge on shingling, hatchet and lines on shingles.

Swept and cleaned roof to prepare them for the application of new roofing materials

Mopped and poured hot asphault and tar onto root base while applying it and gravel to roof

Removed old roofing materials in an efficien manner

[03/1992]-[12/2014]

[Laborer], [Tom Fisher Construction], [Ridley Park, PA] References [Reference Name]

[Title, Company]

[Contact Information]



Contact this candidate