Resume
MOHD ANWAR
Contact: +966********* E-mail: ad38og@r.postjobfree.com
Objective:
Aiming to be associated with a progressive organization that give me scope to update my knowledge and skills in accordance with latest trends and to be a part of team that dynamically works towards the growth of organization and satisfaction thereof.
Educational qualification:
Bachelor of Technology (B.Tech) in Electrical and Electronics Engineering in May 2002 from Kakatiya University, Warangal India.
Work Experience:
Total Experience of 20+ years in which 16 Years in Saudi Arabia in construction field as consultant, client and contractor Engineer and also under gone Training in Switzerland on power line products (New Technology) and 1 year 7 months in oil and gas field in Saudi Aramco and 3 years in testing of transformers in India.
Work Experience in Saudi Arabia
1. Organization : Khatib and Alami
Position : Senior Electrical Engineer
Duration : September 2020 To Till Date
Project : 1) Darraq Al-Hada Residential Compound (Villas)
2) Al Faisaliah Hotel Refurbishment (Hotel Project)
Responsibilities:
Reviewing contractor submitted shop and as-built drawings, material
submittal and coordinate with the concerned departments for resolving
Issues related to the comments and obtaining their approval.
Witnesses the daily inspections to ensure the works is going as per
the approved shop drawings, as per contract and applicable codes,
standards and specifications.
Inspection of power cables, Transformers, panel boards, Internal and External lighting control with the smart system, motion sensors and touch screen and mobile APP for controlling the lights and AC,Intercom Façade lighting system and their control, fire alarm system with Mobile App interface (Receive mobile alerts in case of fire), CCTV system, Emergency power system with generator, Central battery System, BMS system, MCC system, Access control System, Voice and Data, Public Addressing and Audio visual system, WIFI and Ving card control,IT Room (cabinet,switches,patch panels, routers), Satellite dish for TV and IPTV,Remote control of gates with software operation. Barrier gates control with access card and loop for Exit.
Attending meetings with the contractor and sub-contractors to resolve
Interfacing problems during construction and attending the Work progress
meeting in PMC with Client.
Inspecting Contractors Electrical Installation and Testing Activities and
providing clearance for approved works.
Witnesses all testing, pre-commissioning, commissioning, and start-up
activities to assure contractors compliance with the approved plans and
procedures.
Inspecting incoming material Invoices and Billing invoices for payments for
work progress submitted by contractor
2. Organization : Saudi Aramco
Position : Project Engineer Electrical (SAPMT)
Duration : September 2018 To August 2020
Project : Zuluf infrastructure pipeline and Comm Div.
Department : Marjan & Zuluf increment Projects Dept.
Aramco ID No : 8326615
Responsibilities:
Project development: preliminary engineering to detail designs to construction and the final safe turnover to proponent.
Manage General Engineering Services (GES) design contractor activities during the development of project proposal, include definition of project work scope and schedule requirements. Development of detailed estimate leading to funding appropriation and approval.
Review the scope of work related to Electrical and Instrument Drawings and other documents as per the Aramco standards at different stages like Design Basis Scoping paper (DBSP) FEL-2, Project Proposal FEL-3, issued for bidding package (IFB) Project, Value engineering, Execution & Control and Project Closure.
Reviewing contractor drawings and Coordinates with the concerned
departments in Aramco for obtaining their approval and closure of
their comments.
Visiting the site along pipelines corridor to secure the Interface of Electrical, Instrument and Communication Scope.
Utilizing the existing system to provide power for the new system or to provide the power with the solar system where there is no source available.
Handling Issues related to Interface and Technical Query and initiating the CRM’s to get the required information.
Executing Electrical studies like ETAP study, Cathodic protection system, Solar Vs Utility study
Attend project weekly and monthly meetings with contractor, PMT Team and other department in Armco e.g progress status, stakeholders, design review, plot plan, value improvement and issues related to the site and drawings, Project work schedule and the drawing control list….etc
Conducting cost benefit analysis solar Vs utility study in order to check and utilize the best source with less cost which will be profitable for the project
Review weekly and monthly reports on the status and progress of the contracts, including project costs and potential changes.
Working on company systems tools like CRM, EPM, E-Review system, Sharek.
Review the interface management system provided by the contractor which includes interface secured from the different locations on the site
Manage contractor preparation of detailed design drawings, material specifications and procurement, and/or construction bid packages.
Review and resolve day to day contractors claims and complaints related to assigned project (Electrical) work during construction, and ensure HSE compliance
Review, coordinate and monitor invoices (claimed vs. actual physical progress checks) and contractor's submittals.
Be familiar with leading equipment manufacturers/ Vendors.
Be familiar with international procedures of Projects Phases, Engineering Phases, Bidding procedure, Procurement Process, Construction Requirements, and up to date Best Practices
Assist in managing and reviewing the project progress, i.e., planned vs actual. Review of project schedule, coordinating and monitoring the assigned project progress, and challenge below par performance of the contractor.
Develop and preparation of contracting plan and strategy for solicitation, evaluation, and award of contract for detail engineering, procurement, and construction.
Managing complete project deliverables from initial stage to closing including review and approval project related activities.
3. Organization : Projacs
Position : Senior Electrical Engineer
Duration : June 2013To August 2018.
Project : 1) Al Hayatt Regency Hotel (Swailem Tower)
2) Gwayieyah Mall
3) Badiah masjid, Villa
Responsibilities:
Witnesses the daily inspections to ensure the works is going as per
the approved shop drawings, as per contract and applicable codes,
standards and specifications.
Reviewing contractor-submitted shop and as-built drawings, and
coordinates with the concerned departments for resolving issues and
obtaining their approval and for their comments.
Inspection of power cables, Transformers, panel boards, Internal and
External and Façade lighting system and their control, fire alarm system,
cctv system, Emergency power system with generator, Central battery
system, BMS system, MCC system, Access control System, Voice and
Data,Public Addressing and Audio visual system.
Attending meetings with the contractor and sub-contractors to resolve
Interfacing problems during construction and attending the Work progress
meeting in PMC with Client.
Inspecting Contractors Electrical Installation and Testing Activities and
providing clearance for approved works.
Witnesses all testing, pre-commissioning, commissioning, and start-up
activities to assure contractors compliance with the approved plans and
procedures.
Inspecting incoming material Invoices and Billing invoices for payments for
work progress submitted by contractor
4. Organization : Pilog Saudi International
Position : Electrical Engineer
Duration : April 2011 To May 2013
Project : Yanbu Aramco Sinopec Refining Company
(YASREF)
ID Number : C-724211.
Responsibilities:
Handling Electrical Work With help of Drawings
Installation of Sub-station, Main distribution panel boards, Sub distribution
Panel boards
Installing different types of lighting fixture with different switches and outlets and lighting post on roads.
Monitoring Telephone and data cable lay out and out-lets for data and Telephone Units.
Monitoring the installation of Addressable Fire alarm annunciator(Repeater) panel with controls Smoke detectors, Heat detectors, sprinkler head, Beam detectors and HVAC System(Shut down)and Fire Fighting unit.
Preparing of work Schedule coordinating with consultants and sub- contractors
Preparing of daily and weekly progress report
5. Organization : Fahad .A AlBlehed Contracting Est.
Position : Electrical Engineer
Duration : August 2006 To March 2011
Project : Fahad villa’s and American compound
Training Details:
Under gone training with Current Technologies International GmbH Based on Power line communication product in Magenwil, Switzerland.
Responsibilities:
Installation of the power line products using conductive and inductive techniques.
Installation of Medium and low voltage Head-ends, gateways in the distribution panel using ferrites for signaling.
Installation of the CPE's in customer room’s premises for accessing the Triple play (Data, voice over IP and Video on Demand).
Installation of the IP cameras units for monitoring.
Installation of software for monitoring the Devices as well as IP cameras.
6. Organization : Abdul Aziz Al Traiki &Partner’s Trading &Contracting Company Ltd. (A.P.T.C)
Position : Site Electrical Engineer
Duration : November 2005 to July 2006
Project : Operation and Maintenance Center
(Royal Commission for Jubail & Yanbu)
Contract No. 691-C19
Responsibilities:
Handling Electrical Work With Shop Drawings
Installation of Sub-station, Main distribution panel boards, Sub distribution
Panel boards.(Range of Substation 1000KVA 13.8Kv – 400/231v) and
Electrical cable layouts in the site and buildings
Installing different types of lighting fixture for Buildings with different switches and outlets and lighting post on roads.
Monitoring Telephone and data cable lay out in the site and buildings and out-lets for data and Telephone Units.
Monitoring the installation of Addressable Fire alarm annunciator(Repeater) panel with controls Smoke detectors, Heat detectors, sprinkler head, Beam detectors and HVAC System(Shut down)and Fire Fighting unit.
Preparing of work Schedule coordinating with consultants and sub- contractors
Inspecting the precautionary measures during erection and installation
Outdoor lighting with specified fixtures
Preparing of daily and weekly progress report
Experience in India
1. Organization : Hi-Power Electrical Industries, Hyderabad
Position : Testing Engineer
Duration : April 2004 till September 2005.
Responsibilities:
Work involved in Testing and QC of various ranges of Distribution transformers.
Conducting Routine Test for transformers 15KVA,16KVA,25KVA,
63KVA, 100KVA
Performing Calculation on losses involved in short and open circuit tests
Detection of breaking point of oil before using in transformers
Detection of fault and troubleshooting it
Heat run test or temperature rise test for transformer
Detection of incoming material quality
Preparing of monthly and weekly work schedule for success and smooth execution of job
Reviewing of weekly/monthly progress reports
2. Organization : Transcon Industries, Hyderabad
Position : Testing Engineer
Duration : September 2002 till March 2004
Responsibilities:
Work involved in Testing and QC of various ranges of Distribution transformers.
Conducting Routine Test for transformers 10KVA,16KVA,25KVA,
63KVA
Performing Calculation on losses involved in short and open circuit tests
Detection of breaking point of oil before using in transformers
Detection of fault and troubleshooting it
Heat run test or temperature rise test for transformer
Software Skills:
Auto CADD 2007
MS OFFICE 2007
C language
BASIS, ABAP (SAP)
MCSE,CCNA
Soft Skills:
Enthusiastic team player that brings out best and successful results.
Quick learner and able to adapt new technology.
Able to work independently and calmly and willing to work.
Create a friendly and positive environment by being courteous and sensitive to the needs of others.
Personal Profile:
Name : Mohammed Anwar
Father’s Name : Mohammed Sarwar
Date of Birth : 20-10-1981
Region : Islam
Nationality : Indian
Iqama Status : Transferable
Marital status : Married
Languages Known : English, Urdu, Telugu, Hindi
Competence:
If given chance to serve your esteemed organization, i will prove myself for the best of your satisfaction.
References:
Available on demand.
(MOHD ANWAR)
Page No. 3 of 3