Post Job Free

Resume

Sign in

Maintenance Manager Heavy Equipment

Location:
Centurion, Gauteng, South Africa
Posted:
March 07, 2024

Contact this candidate

Resume:

Curriculim Vitae

Michael Johan Van Wyk

Contact: Mobile +27-84-321-**** E-Mail ad36cw@r.postjobfree.com

Maintenance Manager

Mining,Construction and Facilities.

Profile summery

•An accomplished senior maintenance planner with almost 17 years of expertise in maintenance and asset management, planning, measures and controls, HSE management, risk assessment, cost controls and resource management.

•Proficient in maintenance budget including capital project preparation and presentation.

•Extensive heavy equipment and field experience of more than 18 years, in aviation, open pit and process plants.

•Conversant with mechanics and maintenance of heavy equipment and military aircraft. Major manufacturers like: De Havilland Impala, Mirage, Cheetah, Puma, Cessna bosbok, CAT, Kommatsu, P&H, Sandvik, Hitachi, Liebherr, Terex etc.

•I have sound understanding and experience in total run of mines and works, attained legal law and standards certification from South African department of minerals and energy. Also certified in supervisory discipline by Anglo America and Gold fields South Africa.

•Technically sound in Microsoft office package ( Excel, Word, power point, One note, Outlook), Microsoft Projects, Projects 2000, SAP (Plant Maintenance, Purchasing, Material Management, Time Attendance), Pragma, Dynamiqs and Main quest. Good understanding of information Technology, trouble shooting and repair.

•Carried a 2.9.2 Legal appointment for mines and works.

•I have a sensitive and dynamic approach to cross cultural workplaces and available for worldwide relocation.

•I am an enterprising leader with proven dexterity in leading and directing multi-disciplinary personnel in achieving company directives.

Education

1984 Technical high school qualification (High Technical School Vereniging)

1989 Qualified as Airframe fitter (survival) ( South African Air Force)

2000 Qualified as Fitter and Machinist (Engineering Skills Training Centre)

Certificates

Diploma in Child psychology

TEFL (teaching English) basic

Diploma Hypnotherapy Practitioner

Maintenance &asset management (Roland Bergh Consulting)

Maintenance planning (M-Tech)

Role of the chairperson (Anglo development centre)

Modern SHEQ/Risk management (International Risk Control Academy)

Hazard Identification and Risk assessment (HIRA) (International Risk Control Academy)

Finance for non-financial managers (Anglo development centre)

Legal knowledge/standards and code of practise

Practical supervision (Kavan)

Excel Advance 2002 (MS office user specialist)

MS Projects

Projects 2000

Business report writing skills (Anglo development centre)

Management Principles & Practise

BMW advance driving

Business Centred Maintenance/Maintenance management (Growthcon Inl)

SAP R3 PM,MM, T&A, CO reporting (Gateway Project Information)

SAP R3 Service management

SAP R3 Maintenance planning Advance

Supervisors course (Gold Fields Africa)

Managing discipline (Anglo development centre)

Conflict management (ADC)

Senior engineering supervisor

Hydraulic trouble-shooting

Tamrock drilltech 1190E (Drilltech Inc Florida USA)

Liebherr excavator service course ( Liebherr SA)

Hydraulic trouble-shooting

CAT(Caterpillar) Maintenance ( Barlows CAT)

Alignment course (ESTC)

Centrifugal pump course (ESTC)

Lubrication fundamentals & product knowledge (ESTC)

Basic hydraulic course

Methane gas training

Open flame equipment (Kloof GM Co LTD)

Achievements

SAP R3 Implementation

In 1999 selected as team member and super user for SAP R3 implementation at Anglo Platinum's Mogalakwena section .Largest open pit mine in Southern hemisphere. Implementation done by Gateway Project Implementation. Team consisted of 7 members and my role was to create project plan to populate all master data, ie Functional location structure, Equipment, Components, Sub components, Maintenance packages, Maintenance plans, bill of materials, Measuring points, Resources, Task durations, Measuring documents, Rotable controls and Parts pick lists.

All statutory and legal inspections, tests like earth leakage, pressure vessel tests, brake tests, slope stability, Transformer tests etc.

Making use of historical data and full FMECA and RCM on fleet off 140 units of different equipment types from 300Ton dump trucks to Light delivery vehicles and Facilities. And on concentrator/process plant the process was duplicated but on fixed equipment like Ball mills, Cone crushers, Conveyors, compressors, Pressure vessels etc.

Responsible for testing complete cycle on each equipment type to ensure system functions to standard before roll out. The complete system implementation was completed in record time of 4 months.

Profit improvement program

In 2005 I called for a profit improvement program on Caterpillar dump trucks, The engines on these 280 ton truck were designed to last 18000 hours and we only managed between 8000 to 11000 hours before failure. These failures could not be explained by support personnel from CAT on site. I lead the team of 6 delegates including product support, parts management and maintenance specialists from CAT.

I crafted the project in collaboration with Growthcon Itl . The project lasted only 1 month and the final conclusion was turbo manifold gaskets were inferior and new spec was not communicated through STI's from CAT (Barloworld equipment) and old spec part numbers were never superseded thus we used inferior parts for years. All engines were retro fitted with new spec parts and the project had a cost saving in access of R 30 000 000,00.

SAP R3 and Data mine interphase

In 2007 I initiated an project to interphase Data mine information to be automatically be included on measuring documents of equipment maintenance plans to eliminate input errors. The team consisted of 9 members from Mine, Data mine and SAP consultants. My role was as project leader.

The end product was in the form of Phat files being created on Data mine system that populates SAP PM twice daily by means of existing network connection.+

The whole project lasted 14 months as major drawbacks were experienced in terms of patent and licencing agreements but was duly resolved by involving Legal teams of both software providers.

AID Life sea rescue floatation system

I became involved and part of the team developing and testing new sea rescue floatation system. The team consisted of members from National Sea Rescue Institude and members from SA Air Force survival equipment specialists.

The system was developed and tested between 1987 and 1990. It comprised of a basic 4 person life raft, packed and stowed in a fibre glass two part container wich would be dropped from a aircraft into the ocean where persons was shipwrecked or survivors from emergency evacuations from boats or aircraft. The system was fitted with a stabilizer parachute and automatically inflate the life raft on contact with sea water.

Core competencies

Project management Safety Inspections and drives

Budget Management Document and contractor control

Site operations/management Resource allocation

Long term planning Cost reduction/profit improvement

Maintenance efficiency Stores and supply planning

Rotable parts management Equipment life cycle costing

Total Cost of ownership Data analysis

Master data load and updating Reliability centred maintenance

Bill of Materials RCM, FMECA,RCA,MTTR, MTBF,MTTF.

Work control Outsource management

Fleet management Purchase and expediting

Work Experience

Euphorbia property group (Current)

At Euphorbia I was employed as Maintenance Manager responsibilities was devided into 3 sections, namely

(1) Lodge witch consisted of 70 houses.

(2) Guest House with 5 ensuite rooms

(3) Farm with Game, a Piggery, and Goat breeding facility.

Duties were the normal upkeep and maintenance of all 3 areas in collaboration with all departments including cleaning and security services, typical maintenance of electrical fences and gates, Game fencing, boreholes, irregation and pumps. I also managed the total electrical- and water reticulation. All infrastructure, appliance and facilities maintenance like painting, roof resealing and repairs, air conditioning and plumbing to ensure continuous improvement and overall cost reduction and lifecycle optimisation.

Other duties included pre- and post occupancy inspection reports, purchasing of hardware and spares as required. Effective Contractor management (SLA) for after hours repair work. Maintenance planning and forecasting of future rennovations and alterations to living units while promoting risk management and health and safety requirements.

Also performed on job training for teams labourers and assistants . Receiving and correct storage of animal feeds and pesticides.

Klipwerf Granite (2015-2021)

I was employed as Maintenance Manager, total maintenance of equipment, tooling, vehicles, and infrastructure (mechanical and electrical). Responsible for day to day operational availability, planned shut down and rebuilds. Annual budget for maintenance purposes as well as labour and outsource work. Duties included reliability review and improving accordingly, improvement and modification of machines to adapt to larger raw material to drive overall cost reduction. Reviewing maintenance strategies and implement new SOP’s and job cards. Tracking life span of cutting and polishing consumables and writing operational instructions to improve duration of cutting tools. Ensure legislative adherance to the safety and health of all personnel and control of environmental impact on factory property and surrounding areas. Design and Project Management for structural changes and new construction to double factory area.

Hitachi(2012-2014) As Senior planner (Expat)on remote site in Mozambique, under contract from Vale coal Brazil. Responsible for cost control, parts forecast and maintenance during project life cycle. Preparing medium and long term project maintenance and end of life rebuilds plan documentation to ensure business objectives are achieved. Liaison with parts department on new requirements, bill of materials, STI's and parts supersessions. Managing internal and external resources to ensure key objectives are met in terms of budget plan and throughput. Updating data base and reports on actual vs plan achievements. General site management and sourcing/purchasing infrastructure and special tooling. All maintenance activities planned and scheduled on Dynamiqs CMMS. Managing and contracting third party repairs, resources, warranties and services rendered by foreign companies. Role and duties performed to minimise loss and wastage, prevent accidents and incidents by Zero tolerance methodology.

Minopex(2010-2012) As maintenance co- coordinator at Platinum process plant under contract from Redpath mining. Main responsibilities to plan and schedule routine maintenance, shut down and periodic rebuilds including spares, resources and expediting. Monitoring and providing technical assistance during major repairs and rebuilds according to OEM standards and procedures. Updating of maintenance plans according to failure analysis and failure frequency tables. Reporting to client on compliance, availability, utilization and cost. Working closely with materials department to ensure correct stock levels are maintained and bill of materials are up to date and monthly stock take. Made use of Pragma CMMS and excel spreadsheets to fill the gaps in Pragma.

Anglo Platinum In my position I was responsible for the effective management of maintenance programs for all open pit mining equipment. Develop/adapt maintenance plans according to RCA/RCM techniques. Ensure maintenance are done according to BCM principles and to ensure resource and material(spares) availability. In charge of 5 assistant planners who respectively under my leadership follow these through to the 5 different disciplines at our operation. Supply effective management reports on Availability, Utilization, MTBF, MTTR, MTBS, $/ton,TCO, LCC and EOL management and forecasting. All managed on SAP R3 maintenance system and Ms Projects.

In short to effectively maintain all equipment/assets cost effectively by improving skills and processes to optimize asset life and availability using best practices and technology.

S.A.Air Force As Military artisan and flight line section head I was responsible for the scheduled maintenance, 1st to 3d line maintenance and end of life rebuids according to OEM standards. Daily pre- between- and after flights. All defects and defer's were captured in the flight registers and C.M.M.S. I tracked and scheduled all Defer repairs and or replacements. I was responsible to train new pilots on survival equipment and also did conversion lectures and training of foreighn pilots as part of their flight competancy. I also managed the drag shute recovery team out on the runways. My early days after being qualified was involved in the making of survival (how to) series of videos at sea.

Languages

Afrikaans : Home language (Native speaker)

English: Second language (Fluent/advanced)

Portuguese: (Basic)

Sotho: (Basic)



Contact this candidate