Post Job Free

Resume

Sign in

Electronic enginer and MBA on quality systems

Location:
Metepec, Mexico, Mexico
Salary:
85000 MXP/Month
Posted:
March 05, 2024

Contact this candidate

Resume:

Ignacio Comonfort #**

Metepec, Edo. de México CP*2140

linkedin.com/in/facundo-cruz

Mobile: +52-729-****-***

Lanline: +52-722-***-****

Personal e-mail: ad34ur@r.postjobfree.com

Age: 49

Married

Deutch: Basic

Facundo Cruz Mondragón English: Advanced

Certified Electronic engineer (MBA completed June 2019) with wide experience on control systems, CNC’s robotics and PLC s, more than 20 years on the Maintenance, Engineering, Manufacturing, Managing areas T1 to T3 companies experience, certifications as internal auditor for ISO-TS16949, OHSAS 18001:2007, RCM and Class I on IR thermography specialized on electromechanical and emergency systems. Plant management responsibilities, PMP and LEED green associate accreditations.

Objective Assert my intellectual and professional capabilities, at a world-wide class company, on charge of key areas, as a team member to accomplish and exceed assigned goals. To be successful and create a better life for my community and family . Education 2014- 2019 Universidad TECMilenio Toluca, México

Business Administration Master degree (Quality and productivity specialty) 1991–1996 Instituto Tecnológico de Toluca Metepec, México

Electronic Engineer

Power electronics, Robotic and PLC s specialty.

Aditional

skills

Advance automation acknowledge on CNC’s, PLC’s, HMI’s & robot controllers programing and troubleshooting for Allen Bradley, Modicom, Siemens, Mitsubishi, Fanuc, Parker, Arduino automation projects.. Strong experience with industrial process controllers and Scada systems: Eurotherm, Honeywell, Super systems, Atmosphere engineering, AB & Siemens PC’s, capable to troubleshoot Electrical, Mechanical, Pneumatic, Hydraulic and combustion systems.

Use of specialized software for CNC’s & PLC’s programing RS logix 500 and 5000, Step 7, Sinumerik, advance level on Microsoft Office, Word, Excel, Power Point, Project, and AutoCAD 2012, Naviswork 2020 for engineering reviews, Remote access software.

Jobs

History

2019- Actual Jones Lang LaSalle

(JLL Incorporated is a leading, global professional services and investment management firm specializing in real estate) MEP Sr Eng. June 2019- Actual Toluca State of Mexico

On charge of an MEP team on HSBC bank account to develop 15 projects (2021) and 24 projects (2022), for critical infrastructure updates (UPS, emergency Plants, FPS, BMS, HVAC, Detection & special services) within a 20MUSD budget at Datacenter and headquarter offices,

Assigned on projects for MEP engineer also participating on Silver LEED certification:

(Saqqara complex phase 3), on design stage, developing engineering review at critical systems, Fire protection, Detection, Emergency power generators, Electrical, Water treatment, HVAC and structural facilities for a 42 stories building including amenities and C&S services. 2018- 2019 CBRE

(European company with more than 25 years presence at Mexico and Consulting, brokerage and real estate services) MEP Project Manager September 2018- May 2019 Metepec State of Mexico

On charge to develop complete Commissioning process for critical assets as CxA, for corporate offices and call centers on bank sector company (Banamex).

Coordinate functional test and Integral System test for Fire protection, HVAC, UPS s, MEP, Emergency power plants and lighting systems.

Support to create document database for LEED Golden and Silver certification to accomplish ASHRAE requirements on the commissioning process.

2016- 2018 Ionbond de Mexico (IHI group)

(European company with 16 years presence at Mexico, leader on a PVD coating services for forming and cutting tools) Plant Manager August 2016-Febraury 2018 Sta. Catarina N.L.

Responsible for operative and administrative tasks to keep running the business on Mty plant to recuperate and grow 20% sales and customer service of a PVD (Physical Vapor Deposition) portfolio focused on cutting and forming tools for stamping operations. Management of sales goals, KPI s, production scheduling, maintenance plans, HSE compliance, R/A, P&L reporting to corporate level.

Support the opening of a new coating center at central Mexico coordinating equipment installation and startup operations including legal requirements.

Increased plan operations from 1 shift to 24/6, 3 shifts improving 60% deliveries and reducing 20% electrical consumption implementing lean manufacturing and Kaisen techniques. 2014-2016 ALD Heat Treatment

(German company with 14 years presence at Mexico as T1 service Heat treatment) Maintenance coordinator November 2014-April 2016 Ramos Arizpe, Cohauila.

Responsible of preventive and corrective maintenance on highly automated equipment for Low pressure carburizing process and superficial treatments (Shoot peen, Shot blast, Glass bead) .

On charge of the RCM2 (Reliability centered Maintenance) implementation plan. Focused to improve reliability on all plant assets, and support to achieve OHSAS 18001:2007 certification.

Process owner for compliance of internal Quality system and certifications of ISO-TS16949 and CQI-9. 2013-2014 LYRBA

( Mexican company with over 19 years’ experience as T1 service housekeeping and specialized industrial cleaning) Business Unit Manager July 2013-March 2014 San Luis Potosí SLP.

Responsible for contract maintenance facilities (FMA) of the General Motors plant SLP.

In charge of implementing work teams self-directed in their formative stages, development and maturation, aligned global manufacturing system GM (GMS).

2007–2013 Bodycote Thermal Processing LTD Corporate level

(More than 100 years old company Worldwide leader on Heat Treatment services) North America Regional Engineer July 2011- March 2013 Chicago Illinois.

Support and coordination to Plant managers and Maintenance managers with energy consumption projects, panel control upgrades, equipment relocations, troubleshooting and maintenance improvement projects at 7 states of USA.

Responsible to execute and follow-up of Infrared findings to improve PM routines (IR Thermography specific Electrical/Mechanical Level 1 certificate # 120127-08). Use of corporate software CMM’s Express-Maintenance as administrator to increase overall equipment uptime and spare parts inventory efficiency at 27 assigned North America and Asia plants..

Management of contractors to develop upgrades and equipment rebuilds. Definition scope of work, timelines and technical support required for each project within established budgets. Maintenance plant Engineer December 2007- July 2011 Silao, Guanajuato.

Manufacturer’s equipment coordination for receipt, install and startup of 3 production lines, for General Motors as a T-1 supplier. Atmosphere furnaces, Low Pressure Carburizing process, superficial treatment (Shot peening), and general startup of plant facilities.

Support to achieve the certification ISO-TS16949, CQI 9 based on the AMSD 2750 2007 Magna Toluca Interiors Toluca, México.

(Join adventure with Chrysler to startup a sequencing line for panel and overhead assemblies RJ-45 project) Maintenance control engineer Sep 2007- Dec 2007

Startup of this new facility, achieving the customer approval for the 2 production lines using water jet robotic applications, thermo-forming press, and components assembly lines. 1997–2006 Hitchiner Mfg. Co. De Mexico S.R.L. de CV. San Luis Potosí, SLP

(Solutions for investments castings)

Maintenance Manager May 2004 – June 2006.

Developed a robust maintenance organization reaching all of project life, 100% parts delivery on time, 5ppm s quality rate, zero accidents on maintenance engineers and technicians, 95% machinery up time average (score card 2006).

Help to obtain and maintain ISO-TS16949 certification on April 2005, as a process owner.

Startup ISO 14000, ISO 9001, AS9100, NADCAP certification process.

Evaluate the maintenance performance using RCM (Reliability Centered Maintenance) indicators like MTTR, MTBF, Avaibility, Mantenability, Efficency, PdM, tools and systems. Adjusted activities and assignments as required.

Maintenance Coordinator April 2001 - May 2004.

Developed and implemented predictive and TPM routines to machinery of: heat treatment, assembly, automatic gage systems and machining (boring, milling, drilling, centerless grinding), process with robotics equipment. 57 machines with and CNC s and Plc s controls (Fanuc, Siemens, Allen Bradley, Indramat, Pmack), using Proteus CMMS from Eagle technology as a system administrator.

Responsible of the installation, set up, and production for all the equipment on plant, including an expansion to increase the plant capacity 40% more than the original plans on the automotive operations.



Contact this candidate