Resume
MD ABUL HASNAT
SADPURA KILA, PO- RAMNA, MUZAFFARPUR BR 842002
Mb- +919*********, ad33el@r.postjobfree.com
PROFESSIONAL SUMMARY
piping project engineer (reading isometric drawings,P&ID,protocol preparation )
Checked pipe support as per isometric drawings
Checked fit up as well as dimensions
Perform inspection of incoming material as per project requirement.
Performing welding inspection activity.
Performed inspection of piping fabrication work according codes and standard ASME.
SKILLS
Mechanical engineering & Technology
Design
Ms’office
Excel
English Language
EXPERIENCE
UMA ENGINEERING WORKS / Huntsman International India Pvt ltd
Piping Fabrication & Erection Site Engineer. Dec 2013- Dec 2018
DEVIKRIPA ENGINEERING Pvt ltd / Indorama Venchars Oxide Pvt ltd
Piping & equpments installation with layout & P&ID. Dec 2018 to March 2020
V.J.P.N ENGINEERING Pvt ltd / K.L.J Petroplast pvt ltd Jhagariya.
Piping,Structure & Equipment March 2020 to April 2022
NARMADA ENGINEERING Pvt ltd / DCM SHRIRAM Pvt ltd Jhagriya
Piping, structure & Equipments installation with layout and P&ID April 22 to April 23
Project- ALCP
I am handling all types of maintenance in petrochemical plant as like pump, condenser, PHE, HE, Reactor limpet coil welding on position, all types of reactor fitting mechanical seal, shaft, bearing, housing shaft, and bush, gearbox moter with enlightenment. I am also project handling with P&ID piping, structure, and equipments installation with refrence to GA.
Piping engineering: piping and equipment layouts i.e., designing of systems, material selection and supporting the
Systems, Welding, documents and drawings which are used in site for execution of job.
Development of piping& equipment layouts, piping material selection for various seIrvices, basic stress analysis
Piping supporting systems, reading P&ID, construction isometrics, preparation of valve data sheet, preparation of bill of materials. Selection of piping fittings& components, design of tank
Job planing and execute.
VJPN ENGINEERING PVT LTD/ DCM SHRIRAM JHAGARIYA
Project- 850 TDP April 23 to present
piping project engineer (reading isometric drawings, P&ID, protocol preparation)
Checked pipe support as per isometric drawings
Checked fit up as well as dimensions
Perform inspection of incoming material as per project requirement.
Performing welding inspection activity.
Performed inspection of piping fabrication work according codes and standard ASME.
Recently I am complete ALCP PROJECT in DCM Jhagariya
I have handle 70 manpower at a time
300Ton structure and 300Ton Equipment erection not any safety violation.
5000inch dia piping in project.
Special gol in Chlorine line fab and erection 700mtr and chalenge to me is disturbing hydrogen plant. But no any trouble and no safety violation project is complete.
EDUCATION
S.NO
EDUCATION
BORD/UNIVERCITY
PASSING YEAR
%
1
BE
RGPV BHOPAL
2013
66.50
2
12th
BIEC PATNA
2009
67.20
3
10th
BSEB PATNA
2006
60.87
Present CTC- 40K P/M
Expected CTC- 50K P/M
PERSONAL DETAIL
FATHER’S NAME SYED ABUL KALAM
DATE OF BIRTH 02/01/1992
PERMANENT ADDRESS S/O- SYED ABUL KALAM. SADPURA KILA,
PO- RAMNA, DIS MUZAFFARPUR, BIHAR. PIN 842002
PASPORT NO- M2283186
PLASE OF ISSUE Patna
DATE OF ISSUE 18/09/2014
DATE OF EXPIRY 17/09/2024
DECLARATION
I hereby declare that all the information given above is authentic to the best of my knowledge and that any misrepresentation by me in this application disqualifies my candidature.
Md Abul hasnat.
Anklewhwar Gujarat.