Post Job Free

Resume

Sign in

Lead Piping / Structural / Mechanical Designer

Location:
Houston, TX, 77036
Posted:
March 02, 2024

Contact this candidate

Resume:

KEVIN LIU

( mechanical EIT )

cell: 812-***-****

ad32k6@r.postjobfree.com

PIPING / MECHANICAL / STRUCTURAL DESIGNER / CHECKER EXPERIENCE

E3D/SP3D/Cadworx Adminstrator Qualex Engineering, IN Nov. 2022 / Feb. 2024

Created new project, Set up design system, status control, clash manager / clash reports, spool.

Created and managed users, database and specifications, User-Defined-Attributes (UDAs).

Created macros in programmable macro language (PML) to add or update UDAs.

Configured and extracted ISOs, material take-off, equipment list, line list,

Set up and configured drawing style for 2D drawings.

Maintained master catalogue.

Lead Piping / Structural Designer Qualex Engineering, IN Nov. 2022 / Feb. 2024

Confirmed P&ID, updated / created specs, modified catalog data.

Created piping / structural / mechanical 3D, run ISOs, prepared 2D, GA, Sections with E3D.

Checked 3D models by others with Cadworx.

Conducted steel stress analysis, stress calculation.

Prepared the detailed engineering work / drawings / construction documentation package.

Software: E3D, Cadworx, SP3D, Navisworks, Bluebeam.

Lead Piping/Mechanical / Structural Designer R.T. Patterson Co, IN Aug. 2021 / Oct. 2022

Prepared, confirmed P&ID, updated / created spec components, modified catalog data.

Created piping / structural 3D from P&ID / Scan images, run ISOs, prepared 2D, GA, Sections.

Conducted steel stress analysis, stress calculation.

Planned, scheduled, conducted and coordinated the detailed engineering work / drawings / construction documentation package.

Software: Autocad Plant 3D, Cadworx, SP3D, Navisworks, Bluebeam.

Lead Piping / Structural Designer (Temporary) FM Sylvan Inc. St. Louis Feb. 2021 / May 2021

Created piping / structural / mechanical 3D models, produced GA, section views.

Coordinated / resolved problems on drawings and documents.

Software: Autocad, Cadworx, Autocad Plant 3D, Navisworks.

Lead Piping / Structural Checker the System Group, AR Feb. 2020 / Apr. 2020 (Covid Leave)

Checked piping / structural / mechanical 3D models from P&ID / Scan, ISOs, GA, section views.

Software: Autocad, Cadworx, Autocad Plant 3D, Navisworks.

Lead Piping/ Mechanical / Structural Designer Jacob Group, OR Feb. 2019 / Feb. 2020

Created equipment / piping / structural 3D, prepared ISO / GA, checked / fixed clashes.

Coordinated between the disciplines to tackle the issues associated.

Software: Cadworx, SP3D, E3D, Navisworks, Bluebeam.

Piping / Structural Checker / Designer Tundra Engineering Inc. Calgary Sep. 2016 / Oct. 2018

Checked and finalized P&ID, created 3D models and 2D, GA’s / Sections / Elevations drawings for piping, structural, instrumentation, equipment (tank farm, treater, gas scrubber, oil scavenger, pumps – oil, water / oil / solid emulsion and chemical, amine, compressors and meter stations etc.) / nozzle orientation.

Checked piping for gas, oil, wastewater processing system, glycol processing system, amine hydrogen sulfide, carbon dioxide removing system, chemical waste and water drain system.

Updated / created piping / material specifications for component library.

Run ISOs and material lists from 3D models and fixed the defect in models.

Checked clash and structural detail drawings.

Site work: piping, instruments, pipe support installation and test.

Software: Autocad, Cadworx, Autocad Plant 3D, PDMS, Microstation, Navisworks.

Lead Piping/ Mechanical / Structural Designer Stantec Consulting, Edmonton Jan. 2012 / May 2016

Prepared, confirmed and finalized work scope, proposed project deliverables and schedule.

Designed piping / pipeline for gas, gas distribution station, water purity processing system.

Created piping / material Specs to generate models.

Confirmed P&ID and completed 3D for piping, structural, instrumentation and supports.

Designed pumps for oil, water / oil / solid emulsion and chemical (glycol and amine).

Extracted ISOs and material lists from 3D models and fixed the defect in models.

Upgraded pipe support designs to meet the requirements of Caesar II Stress Analysis.

Produced GA’s / sections / elevations of piping / modular units, equipment / compression packages / skids and supports / structures.

Prepared IFR for review, prefab / Bid for shop fabrication and IFC package for construction.

Oversaw 2D and 3D deliverable quality, accuracy, aesthetics, schedules and man-hour status.

Checked 3D clash, reviewed stress analysis and updated 3D models and 2D drawings.

Created 3D models for surface pad, roads based on point data with Civil 3D.

Checked and referenced survey drawings to piping environment to produce site plans.

Referenced surface pad 3D to piping environment to produce site grading plans.

Worked in prefab shop to confirm the consistency of design and fabricated products.

Prepared pipeline pig launcher station design, considering PGE finding / fixing gas leak and mechanical integrity of piping systems.

Site work: piping, instruments, pipe support installation and test.

Coordinated with disciplines, supported distribution and permanent storage of drawings if needed.

Projects: pipeline for Enbridge, Suncor, Keyera, ATCO, oil and gas plant / facility projects.

Software: Autocad, Cadworx, SP3D, Microstation, Civil 3D, Navisworks, Caesar II.

Lead Piping/ Structural Designer Triumph Engineering Ltd. Calgary May 2007 / Dec. 2011

Undertook project scope studies, proposed deliverables and schedule estimate.

Designed equipment / pumps and piping for gas, oil, emulsion, wastewater processing system, glycol processing system, amine hydrogen sulfide, carbon dioxide removing system, chemical waste and water drain system.

Prepared initial / conceptual drawings, detail drawings and as-built drawings.

Checked and confirmed process flow diagram, P&ID, created 3D for piping, instrumentation, equipment / nozzle orientation and supports / structures.

Prepared orientation and GA / plot plans / equipment location drawings, detailed layout and orthographic drawings of systems (piping, mechanical: supports, equipment, pumps / compressors, heat exchangers, coolers and other pressure vessels).

Extracted ISO’s, material lists, corrected error in 3D models.

Prepared review package, shop fabrication package and IFC package for construction.

Upgraded pipe support designs to meet the requirements of Caesar II Stress Analysis.

Reviewed vendor and other discipline drawings for conformity with project requirements. Performed interference check in 3D models, prepared 3D models for stress analysis.

Checked project deliverables, schedules and safety requirements. Acted as design mentor.

Software: Autocad, Cadworx, PDMS, Microstation, Solidworks, Navisworks, Caesar II.

Lead Piping/ Structural Designer Fortress Engineering Ltd., Calgary Feb. 2005 / May 2007

Updated and created piping / material specs for components.

Confirmed P&ID and completed 3D for piping, instrumentation, equipment / nozzle orientation and supports / structures and run ISOs and BOM.

Produced 2D drawings, prepared and checked the supports / deliverables.

Visited sites, confirmed construction sketches to produce as-built package.

Software: Autocad, Cadworx, Autoplant, Solidworks.

Repair Technician City Bread Ltd. Winnipeg May 2000 / August 2002

Troubleshot problematic machines including mechanical, electrical.

Updated process and machinery, some of which are still being used today.

Design Engineer / Lead Lanzhou Petro-Chemical Design Institute, China Jan.1992 / Dec. 2000

Conducted conceptual and detailed design, proposal for man-hour, deliverables, material estimate and calculation.

Created 3D for piping, equipment / nozzle orientation and structures.

Extracted ISO’s, produced GA’s / sections / elevations of piping, equipment and structures.

Checked project deliverables, schedules, client’s requirements and safety requirements.

Visited field, prepared reports of design, specification, functionality, safety and environment.

Checked safety standards, materials specifications for piping, equipment and structural.

Software: Autocad, Microstation, PDS.

Mechanical Engineer Lanzhou Petro-Chemical Refinery Plant, China Jan. 1986 / Dec.1992

Planned and conducted experiments and tests to evaluate new raw materials and processes.

Validated technical solutions to ensure mechanical integrity, reliability, safety and environmental compliance. Troubleshot and corrected reoccurring functionality problems to improve production and efficiency. Installed, tested, repaired and troubleshot machines, conducted quality control.

Updated / designed / installed / tested natural gas liquid piping system, glycol water removing system, amine sweetening system, industrial waste liquid system (chemical waste, drain liquid etc.). Software: Autocad.

EDUCATION

Diploma in Mechanical Engineering for P. Eng.

University of Manitoba, Canada Sep. 2002 / Aug. 2003

Bachelor Degree in Mechanical Engineering

Xi’an Jiaotong University, China Aug.1982 / July 1986

SKILLS

E3D, Cadworx, Autocad Plant 3D, SP3D, PDS, Revit, Revit MEP, Microstation, Solidworks

CERTIFICATE

Mechanical Engineering EIT, Process Piping Drafting, Revit MEP



Contact this candidate