James S. Zuniga
P.O.Box ****
Maxton, NC
Work 910-***-****
Cell 910-***-****
OBJECTIVE
Seeking a challenging position in North Carolina as a Director or Manager that will allow me to guide and direct resources, build a solid team, involvement in daily and future planning, while increasing profitability and market share.
EXPERIENCE
Nitta-Gelatin
Maintenance Manager, present
Train, direct and pass my knowledge to train people for plant support
Work projects associated with equipment replacement
Support the gelatin and calogen processes, protein dept. and wastewater
Work as a team with supervisors, planner, project engineer and process engineers
Building BOM in CMMS for ease of ordering and stocking parts
Mountaire Farms, Inc. Lumber Bridge, NC
Engineering & Maintenance Manager, 1/12 to 2/21
Direct reports Waste Water and Maintenance Managers and Project Engineers
Developing internally promoted Maintenance Manager
Directing and working capital projects
Team development regarding all departments regarding project design/ development
Complex Maintenance Manager, 3/10 to 1/12
Introducing Lean manufacturing to direct reports
Identified and removed obsolete parts from stores
Identifying critical parts and stocking on site or through vendors
OEM training provided for Mtek baggers and Marel sizing equipment
Reduced water consumption from 8.2 gpb to 5.8 gpb
Implemented parts rebuild program i.e. cut-up shackles, gearboxes, pumps, etc.
Developed and implemented hourly checks for quality i.e. bone and leaking bags
Perdue AgriBusiness Inc. Salisbury, MD
AgriBusiness Division Maintenance Manager, 4/07 to 3/10 (promotion) ($108K + bonus)
Directed resources for CMMS (Maximo) implementation
Hired three planners to support work order system at three major locations
Changed structure whereas maintenance owns storeroom and clerks
Removed all obsolete stock and stocked critical parts having long availability
Maintenance group supported start-up of plant that had been down for seven years
Administered assessments, training and post training assessments for 90 mechanics
Working with process mgmt to introduce TPM
Perdue Farms Inc. Accomac, VA
Complex Maintenance Manager, 4/05 to 4/07 ($90K + bonus)
Improved chain speed from 92% to 99% in one year, documented 1.2M improvement
Implemented data collection regarding labor utilization through Work Request process
Reduced manning from 78 to 65 Associates with improved efficiencies 440K savings
Changed weekend overtime from every weekend to every other weekend
Developed budget/capital and adhered to approved limits
Instrumental in implementation of World Class Excellence at my complex and others
Responsible for Project Manager, two Superintendents, two Engineers, Planning, nine Supervisors, and 65 hourly Associates
PSM and government requirements regarding ammonia systems brought in compliance
Introduction of Lean philosophy and concepts
Hill-PHOENIX, Chester, VA
Fabrication Manager, 11/13/00 to 4/05(relocate to Eastern Shore, VA) ($88K + bonus)
Operate three-shift operation with four salaried supervisors, two programmers, three inspectors,
and 165 hourly employees
Implement, train, and direct Lean teams in department
Implement, direct, and coordinate preventative maintenance program for shop equipment
Research, justify, and plan capital investment projects regarding CNC punches, robotic
brakes, spot welding machines, and lasers
Improved throughput by means of process improvements
P&L responsibility
Improved “On Time Completions” by 37%
Reduced absences by 83% with mandatory Saturday work
Productivity increase of 41% with robotic brakes and process improvements regarding flow
Reduced Recordable Accident Incident Rate from 29.09 to 5.3
Reduced scrap rate by 48% leading to 2 million dollar annual saving
HON Industries, Chester, VA
Factory Manager, 1/13/97 to 11/12/00 (facility closing due to union activity) (83K + bonus)
Operate two-shift operation with four salaried supervisors
Direct Industrial Engineers, Quality Engineers, and maintenance personnel
Overall responsibility for 183 hourly employees
Responsible for meeting daily schedules i.e. C.O.T.
Introduce and practice Lean Manufacturing and Kaizen
Provide and follow planning for process improvements
Responsible for capital planning and budget
Implement P.M. programs for machinery
S&G Packaging, L.L.C., Richmond, VA
Production Manager, 1/95 to 1/9/97 (plant closed)
Operated three shift operation with six salaried supervisors
Brought operation from last in production to first in company
Maintained number one status from 8/95 to plant closing
Produced within budgetary constraints
Coordinated machine overhauls and rebuilds with maintenance
Designed and planned modifications for production equipment
Overall responsibility for 163 hourly employees
Maintenance Manager, (promotion) 7/89 to 1/95
Implemented P.M. programs for support and production equipment
Maintained production and support equipment for three shift operation
Directed and coordinated installation of production and support equipment
Researched and analyzed pretreatment systems for plant waste stream
Requested capital and installed pretreatment system
Effluent from recommended pretreatment system resulted in citation free operation
Maintained pretreatment systems, environmental reporting, and files
Supervised purchasing function
Designed and built ink blending system
Modified OEM production equipment I.A.W. my design packages
Designed, implemented, and maintained Lockout/Tag out Program
EDUCATION
Master Degree, Industrial Education Technology, 2001
Bachelor of Science Degree, Industrial Mechanical Technology, 1997
Machinist Apprenticeship, 1979