[Assistant Engineer] / [Power plant SHIFT ENGINEER]

Total Experience: 22 years MUHAMMAD SHAKEEL Current City: Karachi, Pakistan Contact No: +923********* Email ID: ad317c@r.postjobfree.com Address: House no A-717 Majeed Colony Landhi Karachi 75120 Pakistan

VISION:

To challenge myself and utilize my engineering skills and experience to make my organization better and resourceful.

QUALIFICATION:

1) Bachelor of Technology (Pass Under study ) in Electrical Technology

From Preston University Karachi Pakistan

2) Diploma of Associate Engineering in Electrical Technology (1996 to 1999) From Pakistani

Swedish Institute of Technology, Landhi Karachi.

EXPERTISE:

My expertise lies in the following Areas:

CCR Operations, Gas Turbines, Steam Turbines, HRSG, Boiler, 220KV GIS, Natural Gas

Compressors, Water treatment, waste water treatment, N2,H2 generation, HSD Tankers loading / unloading, storage,

Erection and Commissioning, Plant Startups and Shutdowns, Emergency handling

COMPETENCIES:

•Highly skilled plant auxiliary’s operation.

•Computer skills with knowledge of MS Office and SAP PM Applications.

•Skilled Designated Person (DP) for Isolation of equipment GVCB, GCB, Engines, Boilers, Air Compressor, RO plant and all power plant equipment.

•Complex load sharing expert of the industries relying on their own generation.

•Fluent English and Urdu.

•Highly skills about Emergency response and firefighting rescue in case of any emergency.

EXPERIENCE SUMMARY:

1) ASSISTANT ENGINEER

K-Electric 560MW CCPP BQPS-II Ltd

Generation, Transmission, Operation

June, 2012 to till

2) POWER PLANT SHIFT ENGINEER

OLYMPIA POWER GENERATION Power, Utility, Energy, O&M

Jan, 2002 to June, 2012

3) ELECTRICAL DEPART ELECTRICIAN

4) ELECTRICAL DEPART ELECTRICIAN

CLASSIC DENIM MILLS

Electrical Machine Commissioning

GUL AHMED TEXTILE MILLS

Electrical Machine Commissioning

Jan, 2001 to Dec 2002

Jan 2000 to Dec 2001

EXPERIENCE:

2.K- ELECTRIC (Karachi): Duration: JUNE 2012 to till.

ASSISTANT ENGINEER:

560MW CCPP Bin Qasim Power station-II Limited Karachi Pakistan.

Working Areas:

GE Mark VI e Gas Turbine Control System, EMERSON Ovation DCS, PLCs, Gas Analyzers.

03 Gas Turbine (126.8MW) each GE Model PG9171E, DLN Mark VIE control.

Steam Turbine (190MW) dual pressure, double cylinder, condensing by Harbin Power Engineering.

03 HRSG dual-pressure HP/LP by Harbin China ( HP:535 0C, 177t/h, 85bar LP: 2800C 37t/h, 7.8bar).

03 Natural Gas Booster compressor (3x55 MMSCFD) double stage centrifugal with dry gas seal system. 220kV Grid Sub-station, SF6 gas insulated switchgear (GIS) operation.

Electrical Fundamentals (AC Motors, Generators, Plant Protection System, Switchgear etc.).

CO2 fire protection for Electrical sub-stations and Gas Turbines, Firewater network system.

Nitrogen Generation by PSA. Hydrogen production through Electrolysis

Hypochlorite Generation System through Electro chlorination method

Cooling Water Sea Water intake pumps facility.

Desalination &Water Treatment System (clarifier, UF, Primary & Secondary RO & DMW plant).

03 Black Start Diesel Generators (3 x1.8 MW), 01 Emergency Diesel Generator (1.2 MW).

Commissioning of RLNG 110MMSCFD station & mixing station with Natural Gas for Turbines fuel.

Responsibilities:

Currently, I am working as an Assistant Engineer on a combined cycle power plant where I am responsible for safe operation of Boilers, Steam Turbine, Gas Turbine of 560 MW and Gas engines a DCS based complete HRSG System.

My responsibilities include continuous, reliable and safe operations. Resolving issues related to operation and actively handling and managing trouble shooting with the team, authorized designated Person and Carrying out isolations for maintenances.

•To assist the manager (operation) in operation the plant at optimum load.

•Responsibility of safe Operation of Steam Turbines, HRSG Boilers, Water treatment Plant, Gas, engines as per SOPs.

•To maintain all operation data, maximum minimum load and all other necessary information regarding plant and system.

•Prepare the Reliability Incident report (RIR), generate the notification and work permit at SAP.

•To maintain and record Outage and RIR report.

•Prepare the monthly tripping report.

•Coordination with LDC/ control and other generation stations as per instruction from Manager Operation.

•To maintain emergency firefighting pump on regular basic.

•To safely operate of Reverse Osmosis plant as per SOP.

•Continuous reliable operation of power plant equipment and auxiliary through SOP.

•Carry out isolations on Engines and perform LOTO on System.

•Ability to carry out basic troubleshooting and resolve issues effectively.

•Knowledge about SCADA controlling system, Distribution controlling system DCS and PLC controlling system and desktop operation etc.

•Handling trouble shooting of feeders & shutdown and restore the power after total shutdown through standard site operation SSO.

•Performed work as a Designated Person (DP) for Isolation of equipment GVCB, GCB, Engines, Boilers, Air Compressor, RO plant and all power plant equipment.

•Ability to understand and comply with company policies and operating procedures.

•Continuously seek process improvement to save cost and increase efficiency.

•Utilizes SAP/PM system for equipment history and verification of work performed.

3.OLYMPIA POWER GENERATION: Duration: Jan 2002 – June 2012

POWER PLANT SHIFT ENGINEER:

Ten years' experience of Operation and Maintenance of WAUKESHA ENGINES.

Operation and maintenance of GE Jenbacher Model #JGS 320 GSNL Total Plant Capacity: 8.26 MW power plant Gas driven electrical generators and power distribution control through Monitoring of Controls Panels, auxiliaries and switchgear metering of the total site with standard site operation (SSO).

Responsibilities:

•Overall supervision of the plant operation during the shift.

•Supervise start-up, synchronizing, loading rates, shutdown of the Unit, & handing over for maintenance requirements with the help of Manager Shift.

•Handing over and taking over between outgoing & incoming shifts are to be precise at the level of Manager Shift / Staff.

•To assist Manager Shift to take charge of any major fault or emergency situation arising during the shift.

•In case of tripping and other major faults investigate the cause and prepare report to be entered into logbook.

•In case of partial or total breakdown of supply, to restore the station supply in minimum possible time with the guidance of Manager Shift.

•To check the firefighting equipment and report abnormality, if any, to Manager Shift.

•To check firefighting equipment and log complaints, if any.

•Fill accident form in case of injury to staff member, as per factory, act.

•To prepare daily generation statistics (input data) of Power Station.

•To have all the positions in the Power Station properly manned.

•Maintaining discipline by ensuring punctuality of the worker and observance of Rules.

•Ensuring that any data report information regarding the operation required by the Management Studies Department is provided as soon as may be, and in the form required by the department.

•Any task assigned by head of the department pertaining to the functions of the Generating Stations.

Mechanical:

Took part in 1000, 2000, 4000, 8000 hours Maintenance & Top end overhauling major overhauling of in engine, pump and. Mechanical trouble shooting. GAS Engines. And make the generations report. Yearly, monthly, daily Maintenance report. And System CHEMICALS Report Maintained GE- JENBACHER 20000 thousand H.R.S. Maintenance Work Completed.

Electrical:

All electric Drawing & Diagram, Synchronizing System Electrical Change Over System Power Factor Improvement Plant Air Circuit Breakers Vacuum Circuit Breakers Oil Circuit Breakers all Electrical Controlling System trouble shooting power generation & Distribution load calculation.

OLYMPIA POWER GENERATION. COMMISNING AND INSTALLATION WORKED:

1.Waukesha Engines Model # L 7042 G five Engines Operation & Maintenance Work.

2.Waukesha Engine Model # 5094 GSI Rich Burn Operation & Maintenance Work.

3.Waukesha Engine Model # 5794 LTD Lean Burn Operation & Maintenance Work.

4.Waukesha Engine Model # 5794 LTD Lean Burn with ESM Engine Installation and Commissioning Worked Completed in 2003.

5.GE JENBACHER Engines Model # J.G.S 320 G.S.N.L Installation and Commissioning Worked Completed in 2006.

4.CLASSIC DENIM MILLS: (Karachi, Pakistan): Duration: Jan 2001-June 2002

ELECTRICAL DEPART:

One years of experience as an Electrician in Electrical Department.

Responsibilities:

•Responsibility of safe Operation of Steam Turbines, HRSG Boilers, Water treatment Plant, Gas, Diesel, HFO engines as per SOPs.

•Handling trouble shooting of feeders & shutdown and restore the power after total shutdown through standard site operation SSO.

5.GUL AHMED TEXTILE MILLS (Karachi, Pakistan): Duration: 2000-2001

ELECTRICAL DEPARTMENT:

Almost One years of experience as an Electrician in Electrical Department.

Responsibilities:

•Responsibility of safe Operation of Steam Turbines, HRSG Boilers, Water treatment Plant, Gas, Diesel, HFO engines as per SOPs.

•Handling trouble shooting of feeders & shutdown and restore the power after total shutdown through standard site operation SSO.

COMPETENCIES:

•Highly skilled plant auxiliary’s operation.

•Computer skills with knowledge of MS Office and SAP PM Applications.

•Skilled Designated Person (DP) for Isolation of equipment GVCB, GCB, Engines, Boilers, Air Compressor, RO plant and all power plant equipment.

•Complex load sharing expert of the industries relying on their own generation.

•Fluent English and Urdu.

•Auxiliary load management for Steam turbine, Air Cooling Condenser (ACC) and vacuum system.

•Highly skills about Emergency response and firefighting rescue in case of any emergency.