Post Job Free

Resume

Sign in

Land Surveyor Project Manager

Location:
Dar es Salaam, Tanzania
Posted:
March 02, 2024

Contact this candidate

Resume:

ad312c@r.postjobfree.com +255-*********/077*******/062*******

Curriculum Vitae (CV)

1. Proposed Position : Land surveyor

2. Name of Firm : TANROADS MARA

3. Name of Staff : Nickson Lado Haule

4. Date of Birth : 9/8/1974 Nationality : Tanzanian 5. Education

Institution

[ Date from - Date to ]

Degree(s) or Diploma(s) obtained:

University of Dar es Salaam, Tanzania.

Sept,2005-Oct,2009

BSc (Hons)-In Geomatics

Ardhi Institute Morogoro, Tanzania.

Nov,1996-Nov,1998

Certificate in Land Surveying

6. Membership in Professional Associations:

Registered Member of Institution of Surveyors of Tanzania (IST) Member for Royal Institute of Chartered Surveyors, Member No.5013876 7. Other Training:

August 2012: Introduction to Geomedia Professional 6.1 (Intergraph) for the census project of Tanzania - Tanzania November 2002: East African Land survey certificate examination, Intermediate level Governed by E.A.L.S.L.C.E.B Jan-April 2001: Training on Gravel roads construction and Maintenance Dar es salaam-Tanzania Publications

Feb – June: 2009: Research (BSc Thesis): A GIS Dissertation on mapping and analysis of recycling bring sites a case of Kinondoni Municipal, Dar es Salaam Region.

Computer Literacy:

Arc View Software GIS, Microsoft office, Autodesk Land Desktop, AutoCAD Civil 3d, Civil CAD, CadPro, Cisco3, LISCAD &GeoMedia Professional 6.1 Intergraph

8. Countries of Work Experience: Tanzania

9. Languages: (mark good, fair or poor in reading, speaking and writing) Language Reading Speaking Writing

English Good Good Good

Kiswahili Good Good Good

10. Employment Record:

From [year]

To [year] Employer Positions held

Nov2017-July2018 TECU-TANROADS MARA Topographical Surveyor June 2015 to Aug2017

K&A Associates Professional Services Ltd(KAPSEL) in association with crown Tech Consult(CTC) Chief Surveyor Feb,2013 – Feb,2015 China Railway No.3 Engineering Group Co.(T) Ltd Chief Surveyor December,2012 Crown Tech Consult Ltd(CTC) Senior surveyor Sept,2012 – Dec,2012 Db-Shapriya+Co.Ltd Chief Surveyor July,2011-Aug,2012 National Bureau of Statistics(NBS) GIS Expert July,2010-July,2011 Sogea Satom Vinci Senior Surveyor April,2010-July,2011 Don consult LTD Topographical Surveyor Sept,2002-Aug,2005 Prismo Universal Italiana S.r.l Surveyor Oct,2001-Jan,2002 Rafiki Building Contractors Ltd Surveyor and Road Supervisor July,2001-Oct,2001 WESONS Tanzania Ltd ENGINEERS Surveyor ad312c@r.postjobfree.com +255-*********/077*******/062******* From [year]

To [year] Employer Positions held

Nov2017-July2018 TECU-TANROADS MARA Topographical Surveyor June 2015 to Aug2017

K&A Associates Professional Services Ltd(KAPSEL) in association with crown Tech Consult(CTC) Chief Surveyor May,2001-July,2001 Rafiki Building Contractors Ltd Surveyor Technician and Road Supervisor

Jan,1999-Dec,2000 Temeke Municipal Council-Dar es salaam Trainee Land surveying Technician Key Qualifications:

Surveyor Nickson.L.Haule is a Land Surveyor with more than fifteen (16) years of working experience in Engineering works such as (road construction, building constructions, water resources both water supply and sewerage system), Cadastral surveying, Topographical surveying, GIS, Geodetic surveys(control survey), Nickson’s experience is based on concept designs, detailed designs, engineering surveys, feasibility studies; rehabilitation, improvement, extension, and supervision of roads, buildings and water works. 11. Detailed Tasks Assigned:

Identifying and locating all beacons and benchmarks to enable the contractor set out and construct the works and hand over to the contractor before commencement of any section of the works.

Inspecting, testing and approving all levels in respect with both horizontal and vertical alignment.

Preparing control charts of the main activities and a project master schedule, Indicating both past performance and forecasts for completion including time involved in each case.

Keeping updated all surveys data records for the works, participate fully in preparation of as Built drawings for the project in agreed format, all survey data for the project should be available when required.

Preparing consolidated monthly reports when required by the Project Manager (Resident Engineer).

Measuring quantities of works satisfactorily carried out and certify monthly and final payment certificates for consideration by the Project Manager (Resident Engineer).

Preparation and submission of detailed progress report with updated cost of the civil works contract, implementation schedules and any substantiated request related to additional funding, needed for full completion for the project.

Maintaining a site diary on a daily basis with the contents and format to be agreed with Project Manager (Resident Engineer)

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Construction of 3-span (94mlong) composite bridge and its approach roads to bitumen standard

Year: 20thNov 2017 -31st july,2018

Location: Mara River, Along Tarime-Natta Regional road, Mara region, Tanzania Client: TANROADS-MARA REGION

Financier: ROAD FUND

Employer: TECU-TANROADS engineering consulting unit Main project features: Structures

Construction of a Composite Bridge

Bridge Substructure Construction of Abutment, Wing walls and Pier (RCC) Bridge Superstructure Launching of Steel Girders (Beams) Construction of Deck slab and Approach slab (RCC)

Earthwork and Pavement Layers:14/7 mm Double Surface Dressing Wearing Course, Prime Coat, MC-70),125mm thick Granular Material CRS Base Layer,150mm thick Cement Stabilized Sub Base Layer, CM,150mm thick Improved Sub Grade Layer, G15,150mm thick Improved Sub Grade Layer, G7 (continuous),Various thickness of G3 fill layer depending on the road profile. Drainage and protection.

ad312c@r.postjobfree.com +255-*********/077*******/062******* Position held: Topographical Surveyor.

Activities performed: Indentifying and locating all beacons and benchmarks to enable the contractor set out and construct works and hand over to the contractor before commencement of any section of the works, Inspecting, testing and approving all levels in respect with both horizontal and vertical alignments, Prepare control charts of main activities and a project master schedule, indicating both past performance and forecasts for completion including time involved in each case, Keeping update all survey data record for the works, participate fully in preparation of as built drawings for the project in agreed format, all survey data for the project should be available when required, Prepare consolidated monthly report when required by the project manager {Resident Engineer},Measuring quantities of works satisfactorily carried out and certify monthly and final payment certificates for consideration by the project Manager { Resident Engineer},Preparation and submission of detailed progress report with updated cost of the civil work contract, implementation schedules and any substantiated request related to additional funding, needed for full completion for the project, Maintaining a site diary on a daily basis with the contents and format to be agreed with project Manager {Resident Engineer}. Name of assignment or project: Upgrading of Ole-Kengeja road (35km) to bitumen standard Year: 8th June 2015 -31st Aug, 2017

Location: Chake Chake, Pemba, Zanzibar

Client: Ministry of Infrastructure and communications (Zanzibar) Financier: The Opec fund for International Development and The Revolutionary govt of Zanzibar(RGOZ) Employer: M/S K and Associates professional services Ltd (KAPSEL) in association with Crown Tech Consult Ltd (CTC)

Main project features: Site Mobilization, site clearance, earth works including and not limited to: Road bed preparation(common excavation),cut and fill sections, formation level, preparation of pavement layers i.e. G7,G15,G25(Sub base),G80(Base course) and Asphalt concrete, construction of structures like: pipe culverts, Box culverts and Drainages. Position held: Chief Surveyor.

Activities performed: Undertake Control Survey tasks both Horizontal and vertical before any construction work, this is for the purpose of ensuring that Control points are in situ i.e. in proper position, setting out alignment i.e. centreline so as to know the right of way for clearing and grubbing purpose, removal of Topsoil and common exaction as well, Taking cross section for original ground level data(OGL) before clearing and grubbing and check it if the data captured resemble with those captured during design. setting out of structures like pipe culverts and Box culverts

,Ensuring safe execution of the work at all times, manage productivity on the site, enforce the instructed methods of surveying and monitoring as defined in the method statement and procedures, Maintain daily record of all survey activities on site(including personnel, equipment problems, safety issues and improvements of the survey team, Data capture and processing of all data produced,Pruduce daily reports of results and changes in reading for project. Attend the Daily Monitoring review meetings when required. Name of assignment or project: Upgrading of Chalinze bypass (Msoga –Msolwa road to bitumen standard 10km)

Year: 17th Feb, 2013-20th Feb, 2015

Location: Chalinze, Bagamoyo District, Coast region Client: TANZANIA NATIONAL ROADS AGENCY, TANROADS-COAST REGION Financier: ROAD FUND

Employer: China Railway No.3 Engineering group Co., (T) LTD Main project features: Site Mobilization, site clearance, earth works including and not limited to: Road bed preparation(common excavation),cut and fill sections, formation level, preparation of pavement layers i.e. G3 Top(formation level),G7,G15,G45(sub base),CRR(base course) and surface dressing, construction of structures like: pipe culverts, Box culverts and Drainages Position held: Chief Surveyor.

Activities performed: Plan, organizes,and directs survey personnel, supervises and evaluates the work of subordinate personnel, such as preliminary and construction surveys, carryout field surveying and techniques, schedule job crews to effectively undertake priority works and attempt to meet the needs of all parties, establish priority works, evaluate workload, and recommend which work comes first before the other, calculate and balance traverse surveys ad312c@r.postjobfree.com +255-*********/077*******/062******* upon their completion in the field, keep survey records and references of the road, approve minor deviations from plans and specificatons.assisting Highway Engineer in evaluating request for major changes, read construction plans and specifications, communicate effectively with engineers, lead and participate in a variety of land survey operations such as topography,leveling.design,as built, and maintaining horizontal and vertical control networks utilizing a full range of survey equipment. Prepares and verifies mathematical calculations related to surveying and basic engineering; computes adjusts angles,distances,bearings traverses and elevations interprets and computes field data; evaluates for accuracy and completeness,maintaina accurate survey and non-survey related records in the form of field notes, report and sketches; maintain vertical and horizontal control notes in files, field book/sheets and computer

Name of assignment or project: Re-alignment of Dodoma-Kondoa-Babati road (188km) Year: December, 2012-Jan, 2013

Location: Dodoma-Kondoa-Bonga (Babati)

Client: TANZANIA NATIONAL ROADS AGENCY (TANROADS)

Financier: African Development Bank (ADB)

Employer: Crown Tech Consult (T) Ltd

Main project features: Creating right of way for re-valuation purposes. Position held: Senior Surveyor

Activities performed: Stakeout centerline coordinates and right of way coordinates for re-valuation purposes Name of assignment or project: Upgrading of Chuno and Kunambi road to Bitumen Standard (7km) Year: Sept, 2012 – Dec, 2012

Location: Mtwara-Mikindani Municipality

Client: Mtwara-Mikindani Municipal Council

Financier: World Bank under Tanzania Strategic cities project construction of investment sub-project Employer: Db-Shapriya Tz Ltd

Main project features: Site Mobilization, site clearance, earth works including and not limited to: Removal of Top soil, Road bed preparation(common excavation),cut and fill sections, formation level, preparation of pavement layers i.e. G3 Top(formation level),G7,G15,C1(sub base) and C2(base course) construction of structures like: pipe culverts, Box culverts and Drainages. Position held: Chief surveyor.

Activities performed: To plan and evaluate proposed field survey, manage the field survey teams,prepare,process and coordinate the required field design survey work and construction staking survey work and other surveys and daily surveys logs, acts as party chief for a field survey crew engaged in making plans and/or geodetic surveys for construction,topographic,right-of-way, and control surveys; participate in pre-survey planning meetings with Project manager, Resident engineer and Highway engineer, gathers field survey data through use convetional equipment and Totalstation;sets up,adjusts,and operates surveying equipment, including Total station and level machine, in order to measure distances,elevations,and angles; prepares field notes and drawings; performs field surveying for roadway, culverts both pipe and Box, including installing surveying construction stakes, tying out existing intersection, and locating or establishing vertical and Horizontal control, right of way and monuments, performs complex surveying calculations using engineering calculator,laptop,graphic software, such as AutoCAD,CivilCAD,Computational softwares like CISCO 3 and cadpro,calculating traverses,coordinates,control points, Quantities and areas as well. Name of assignment or project: Tanzania National Census Project (National Bureau of Statistics) Year: July, 2011-Aug, 2012

Location: Dar es Salaam

Client: Ministry of Finance

Financier: UNFPA

Employer: National Bureau of Statistics (NBS)

Main project features: Creating enumeration map for Tanzania census project, 2012 Position held: GIS Technician

Activities performed: Creating maps by entering Data both(Geographical which has location property and attributes data; Data which elaborate the said feature mapped geographically using ad312c@r.postjobfree.com +255-*********/077*******/062******* Different GIS software like; ArcGIS and GeoMedia Profesional 6.1(Intergraphy),ground truthing using using satellite images to identify enumeration areas for census project. Name of assignment or project: Upgrading of Songea – Namtumbo road to Bitumen Standard (67km) Year: July, 2010 – July, 2011

Location: Songea, Namtumbo, Ruvuma Region

Client: TANZANIA NATIONAL ROADS AGENCY (TANROADS)

Financier: Millennium Challenge Account Tanzania (MCAT) MCC Employer: Sogea Satom Vinci, Tanzania

Main project features: Site Mobilization, site clearance, earth works including and not limited to: Removal of Top soil, Road bed preparation(common excavation),cut and fill sections, formation level, preparation of pavement layers i.e. G3 Top(formation level),G7,G15,CRS (sub base) and CRR (base course) construction of structures like: pipe culverts, Box culverts,Bridges and Drainages.

Position held: Senior Surveyor.

Activities performed: Carry out control point checks both Vertical and Horizontal if its accuracy if desirable for setting out work to begin before execution of any construction work, Setting out alignment i.e. centerline for clearing and grubbing, Setting out for Removal of Top soil after clearing and grubbing, setting out for Road bed preparation(common excavation),setting out for different constructional works such as; Cut sections, fill sections, formation levels layers and pavement layers, setting out of Pipe culverts, Box culverts,Drainages and Bridges, Insures the integration of field data and records into completed maps, drawings and records, Assumes responsibility for the company survey equipment and oversees equipment maintenance and inventory, produces accurate detailed maps with accurate surveying data in a timely manner, perform complex field and office surveying work, make precise survey measurements, make and interpret difficult survey calculations, operate precise surveying instruments (convetional and state of the art, supervise the work of assistant surveyors, plan and direct the work of assistant surveyors, To make necessary correction and/or revisions to construction plans, under the direction of Chief surveyor, when required to meet field conditions and/or comply standards.

Name of assignment or project: Provision of Consultancy Services for feasibility study (Topographical survey for water supply projects)

Year: From April, 2010-July, 2010

Location: Songea Municipality, Mbinga District and Namtumbo District Client: SOUWASA (songea urban water supply and sewerage authority Financier: WORLD BANK under water sector development programme Employer: DON CONSULT LTD (DCL)

Main project features: Feasibility study (Topographical Survey) for water supply in songea, Namtumbo and Mbinga Position held: Topographical surveyor.

Activities performed: Preparation of town water layout showing existing networks and proposed water networks as well as other water infrastructure such as intake,tanks,treatment plants and waste water treatment works, Topographical survey using Total station for proposed pipeline routes and other facilities, Preparation of Longitudinal profile showing chainages,reduced level and remarks.

Name of assignment or project: Implementation of emergency rehabilitation of Mkoani-Mtuhaliwa-Chakechake-Airport to bitumen standard (19.4km)

Year: Sept, 2002-Aug, 2005

Location: Chakechake, Mkoani, Pemba-Zanzibar

Client: Ministry of Infrastructure and communication (MOIC)-Zanzibar Financier: African Development Bank (ADB)

Employer: Prismo Universal Italiana S.r.l

Main project features: Site Mobilization, site clearance, earth works including and not limited to: Road bed preparation(common excavation),cut and fill sections, formation level, preparation of pavement layers i.e. G3 Top(formation level),G7,G15,CRS (sub base),CRR(base course) and surface dressing, construction of structures like: pipe culverts, Box culverts and Drainages.

Position held: Surveyor

Activities performed: Verify the accuracy of control points both Vertical control and ad312c@r.postjobfree.com +255-*********/077*******/062******* Horizontal,planning,scheduling,calculations,materials,and equipment necessary for surveying,control,and various road works, carryout all setting out works such as;centreline,right of way, Culvert both pipe and Box, setting out of pegs for different earthwork such as removal of topsoil, road bed preparations, formation layer, Pavement layers both sub base and base course, Prepares and verifies mathematical calculations related to surveying and basic engineering; computes adjusts angles,distances,bearings traverses and elevations interprets and computes field data; evaluates for accuracy and completeness,maintaina accurate survey and non-survey related records in the form of field notes, report and sketches; maintain vertical and horizontal control notes in files, field book/sheets and computer.

Name of assignment or project: Trial contract for spot improvement of Regional road No.467, Dodoma-Mvumi road

(Ch 20+800-35+000), Along Dodoma-Mvumi-Buigiri section Year: Oct, 2001-Jan, 2002

Location: Dodoma District, Dodoma Region

Client: Dodoma Department of works

Financier: Swiss Contact

Employer: Rafiki Building Contractors Ltd.

Main project features: Spot improvement of Mvumi road, Gravel road maintenance work includes Clearing and grubbing,scrarifying,road formation,Gravelling,construction of side drain,catchwater drains, mitre drain,scourchecks,cut to spoil, cut to fill, construction of pipe culverts,drift,dropinlets Position held: Road supervisor and surveyor

Activities performed: Setting out the existing road section using boning roads and water levels for clearing and grubbing, setting out all roadwork such as; catch water drain. Mitre drain, side drain, culverts, drift using boning roads and water levels, setting out for removal of crest and fill section, Preparing work programme, schedule of work and interim payment certificate Name of assignment or project: Backlog Maintenance works of Peramiho-Mbinga Road (CH0+000-40+000) Package 2 along Songea-Mbinga-Mbambabay road

Year: July, 2001-Oct, 2001

Location: Songea District and Mbinga District, Ruvuma Region. Client: Department of works, Ruvuma region

Financier: European Union (EU)

Employer: WESONS Tanzania Ltd ENGINEERS

Main project features: Spot improvement/Gravel road maintenance; heavy reshaping. Position held: Junior surveyor

Activities performed: Checking out control points both vertical and Horizontal, setting of the whole road section for clearing and grubbing, road formation, cut to spoil, cut to fill, culverts,side drain, catch drain mitre drain, corrugated metal pipes and repairing Bridges. Name of assignment or project: Trial contract for spot improvement of Lupiro-Malinyi road (23km) Year: May, 2001 – July, 2001

Location: Ulanga District, Morogoro Region

Client: Department of roads, Morogoro region

Financier Swiss Contact

Employer: Rafiki Building Contractors Co.Ltd

Main project features: Spot improvement of Lupiro - Malinyi road, Gravel road maintenance work includes Clearing and grubbing,scrarifying,road formation,Gravelling,construction of side drain,catchwater drains, mitre drain,scourchecks,cut to spoil, cut to fill, construction of pipe culverts, drift and drop inlets

Position held: Surveyor and road supervisor.

Activities performed: Setting out the existing road section using boning roads and water levels for clearing and grubbing, setting out all roadwork’s such as; catch water drain. Mitre drain, side drain, culverts, drift using boning roads and water levels, setting out for removal of crest and fill ad312c@r.postjobfree.com +255-*********/077*******/062******* section, preparation of work programme, schedule of work and interim payment certificate. Name of assignment or project: Cadastral survey, Topographical survey and Detail survey Year: Jan, 1999 – Dec, 2000

Location: Temeke Municipal Council, Dar es Salaam

Client: Temeke Municipal Council

Financier: Temeke Municipal Council

Employer: Land Division, Temeke Municipal Council

Main project features: Cadastral Surveying

Position held: Trainee Land surveying Technician.

Activities performed: Prepare and maintain sketches,maps reports,and legal description of surveys in order to describe,certify,and assume liability for work perfomed,verify the accuracy of survey data, including measurements and calculations conducted at survey sites, Direct or conduct surveys in order to establish legal boundaries for properties,based on legal deeds and titles, Records the results of surveys, including the shape,contour,location,elevation,and dimensions of land or land feartures,calculate heights,depths,relative positions, property boundaries and other characteristics of Terrain preparation of all data,charts,plots,maps,records and documents related to surveys, write description property boundary surveys for use in deeds, leases or other legal documents, Plan and conduct ground surveys designed to establishbaselines,elevations,and other geodetic measurements, search legal records, survey records, and land titles in order to obtain information about property boundaries in areas to be surveyed, Determine longitudes and latitudes of important features and boundaries in survey areas using theodolite and level machines. REFEREES

Eng.Christopher Magori Eng.Paschal sana

PAGOMA BUILDERS LTD TANROADS MARA

P.O BOX 11107 P.o Box 81

MWANZA MUSOMA-MARA

+255**********/076******* 076*******/062*-***-***

E-mail:ad312c@r.postjobfree.com ad312c@r.postjobfree.com

Notckel .G.Mbonde

Advanced Engineering solution.

P.O BOX 19074

Dar es salaam

Mob No: +255-*********/078*******

E-mail;ad312c@r.postjobfree.com

.

13. Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification, or dismissal, if engaged.

Date: 08/06/2018

[Signature of the staff]

Day/Month/Year

Full name: NICKSON LADO HAULE ad312c@r.postjobfree.com +255-*********/077*******/062*******



Contact this candidate