RESUME
SURENDRA KUMAR BISOI
SMART HOME APARTMENT
HITECH CITY MANCHERIAL, TELANGANA,
Mobile: 943-***-****/912******* Email: ad2ywd@r.postjobfree.com,ad2ywd@r.postjobfree.com
DISCIPLINE : INSTRUMENTATION.
POSITION APPLIED FOR:-INSTRUMENTATION SR.ENGINEER
EXPERIENCE SUMMARY:
PERIOD OF WORKING: From MAY 1990 to till date. Having industrial experience in the field of INSTRUMENTATION as follows:
a.At Present Working as a ENGINEER ( C&I Instrumentation ) in 2X600 MW-IPP-POWER PLANT for PMPL O&M of STPP, Singareni, Telangana from 01/06/2021 Till Date.
b. Working experience as a Sr.foreman ( C&I Instrumentation ) in 2X600 MW-IPP-POWER PLANT for O&M of STPP, Singareni, Telangana from 23.05.2016 TO 31/05/2021
c.Working experience as a Sr.foreman/Engineer ( C&I Instrumentation )Working at 4X600 MW-IPP-POWER PLANT (Foxboro DCS) for O&M of SEL-VEDANTA, STEAG-ENERGY SERVICES(P) LIMITED, from 13Dec 2010 at Jharsuguda (Sambalpur) 14 April 2016.
d.Working experience as a Foreman/ Instrumentation of 83 MW POWER PLANT (ABB -DCS-SERIES- ACS800,PLC-SIEMENS ) of SMC Power Generation Ltd., from 22 Jun’2007 to 06 dec 2010 at Jharsuguda (Sambalpur) .
e.Working experience as a Sr.Technician instrument of SOUTH ASIAN PETROCHEM LTD. 500 TPD high viscous bottle grade chips PET RESIN manufacturing plant collaboration with Zimmer Technology (GERMANY). Based on DCS Delta V (Fisher Rosemount) PLC from 1st April 2003 to 13 Jun 2007, at Haldia (West Bengal).
f.Working experience as a Foreman instrumentation of ELQUE POLYSTER LTD. Based on DCS (Hitachi – 1000 series) / PLC (Buhler) 100 TPD PET RESIN PLANT at FALTA EXPORT PROCESSING ZONE, South 24 Parganas, (W.B) Collaboration with SKI & BHULER Technology from 1st May 1996 to 27 March 2003.
g.Working experience as an employee of HOFICONS INDUSTRIAL SERVICES LTD., Designated as Technician Instrumentation having exposed to Preventive & Breakdown with operation jobs in M/s. USHA MARTIN INDUSTRIES LTD., Jamshedpur on M.B.F. unit, captive power plant 3.5 MW from 1st May 1995 to 30 April 1996.
h.One year as skilled technician of ALL INDIA RADIO, Sambalpur project site 100KW MEDIUM WAVE TRANSMITTER INSTALATION & various electrical and electronic works from 29 Dec. 1993 to 31 Dec. 1994.
i.Two years as Instrument Tech. in Taylor Instrument Co. (I) Ltd. At project site of Hirakud Power Plant 67.5 MW, Sambalpur having Exposed to the MOD 30 x 300 system and Erection and commissioning and loop checking activities from 27 Dec. 1991 to 28 Dec. 1993.
j.One year apprentice. Training in Talcher Thermal Power Station of 440 MW Thermal unit as an Inst. Mechanic in protection and control division from 22 May 1990 to 21 May 1991.
EDUCATIONAL QUALIFICATION:
Name of Examination Passed
Name of the Board / Institute / University
Year of Passing
Percentage of Marks
H.S.C
Board of Secondary Education, Orissa
1986
52%
A.I.T.T (Instrument Mechanic)
Industrial Training Institute, Hirakud
1989
77%
N.C.V.T (App.) (Instrument Mechanic)
Industrial Training Institute, Govt. of Orissa, Talcher
1991
66%
1 Yr. Diploma in Electronics Technology
K.E.T.T.I, Sambalpur
1992
69%
PERSONAL PROFILE:
Date of Birth 13-07-1969.
Father’s name LATE SATRUGHAN BISOI.
Sex MALE
Marital Status MARRIED
Languages Known ENGLISH, HINDI, ORIYA, BENGALI.
Salary drawn 57000(monthly gross)
Expected Salary Negotiable
Passport num. M8801106
DECLARATION:
I consider myself familiar with Instrumentation Aspects. I am also confident of my ability to work in a team. My notice period is three month.
I hereby declare that the information furnished above is true to the best of my knowledge.
Date: 02.02.2022 Surendra Kumar Bisoi
Place: Singareni